GE r10279v User Manual

Design Guide with
Installation Instructions
Wine Chiller, Wine Reserve and Beverage Center
monogram.com
Safety Information
BEFORE YOU BEGIN:
Read these instructions completely and carefully.
IMPORTANT – Save these instructions
for local inspector’s use.
IMPORTANT Observe all governing codes
and ordinances.
Note to Installer – Be sure to leave these
instructions with the Consumer.
Note to Consumer – Keep these instructions with
your Owner’s Manual for future reference.
WARNING This appliance must be properly
grounded. See page 4.
AVERTISSEMENT
Cet appareil doit être correctement mis à la terre. Consultez page 4.
If you received a damaged wine chiller, wine reserve or beverage center, you should immediately contact your dealer or builder.
Skill Level Installation requires basic mechanical
skills. Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the GE Appliance Warranty.
WARNINGS:
• Use this appliance only for its intended purpose.
• Immediately repair or replace electrical service cords that become frayed or damaged.
• Unplug the unit before cleaning or making repairs.
• Repairs should be made by a qualified service technician.
AVERTISSEMENT :
• Il ne faut utiliser cet appareil que pour l’usage pour lequel il a été construit.
• Il faut réparer ou remplacer immédiatement tout cordon d’alimentation électrique effiloché ou endommagé.
• Débrancher le bar ou le réfrigérateur a vin avant le nettoyage ou toute intervention.
• Les réparations doivent être faites par un technicien qualifié.
For Monogram local service in your area, call
1.800.444.1845
For Monogram service in Canada, call
1.800.561.3344
For Monogram Parts and Accessories, call
1.800.626.2002.
www.monogram.com

Design Guide

The Installation Space ............................. 3
Product Clearances...................................3
Side-by-Side Installation ........................ 3

Installation Instructions

Tools, Hardware..........................................4
Grounding the Product............................ 4
Staining Wood Drawer Fronts..............4
Installing the Custom Frame Panel ...4
Step 1, Remove Packaging .................... 4
Step 2, Reverse Door Swing ..................5
Step 3, Leveling ...........................................6
Step 4, Connect Power ............................6
2
Step 5, Slide Product into Cutout ........6
Step 6, Install Nameplate .......................6
Step 7, Set Temperature Controls ......6
Custom Frame Panel Models ............... 6
ZTBSS1 Monogram
Tubular Handle Kit .....................................7
Template for Nameplate .. Back Cover
Design Guide
10" Minimum
to Wall
110°*
*95° Door Swing on Custom Frame Models

THE INSTALLATION SPACE

Locate Outlet
10-1/2"
24"
9" Max.
34-1/2"-35"
NOTE:
Handle and handle standoff depth is 1-3/4
The cutout depth should be 24
The cutout dimensions shown allow for a full door swing and access to the pull-out racks when installed as a built-in in standard 24 deep cabinets.
• The wine chiller, wine reserve and beverage center can be installed freestanding.
• If installing between frameless cabinets, a 1/2wide filler strip or side panel may be needed on hinge side. The filler strip will act as a spacer between the case and adjacent cabinet door swing. The width of the opening must include the filler panels. NOTE: The door should protrude 1beyond the surrounding cabinets. Custom framed models will protrude 1-7/8beyond surrounding cabinet doors.
Additional Specifications
A 120 volt 60Hz., 15 or 20 amp power supply is required. An individual properly grounded branch circuit or circuit breaker is recommended. Install a properly grounded 3-prong electrical receptacle recessed into the back wall as shown. Electrical must be located on rear wall as shown. NOTE: GFI (ground fault interrupter) is not recommended.
1-1/2"
23-3/4" Min.
24-1/8" Framed Models 23-3/4" Stainless Steel Models
23-3/4" Stainless Steel Models
34-1/4" to 34-3/4"
23-3/4"

PRODUCT CLEARANCES

The stainless steel wine chiller, wine reserve and beverage center is factory set for a 110° door swing. Models that accept custom panels have a 95° door swing.
When installed in a corner:
Allow 4 min. clearance on the hinge side for the 90° door swing and to allow racks to slide out.
• Allow 10minimum clearance on the hinge side for a full 110° door swing. (Models ZDWI240WII and ZDBI240WII have a 95° door swing.)
NOTE: Custom handle clearances may vary, depending on custom handle depth.
90° Door Swing
21-5/8"
23-5/8"
90°
4" Minimum
to Wall
• The door swing is reversible on all models. If desired, change the door swing before installation or before installing the custom frame panel.
Choose the location:
• These products may be closed in on the top and three sides as long as the front is unobstructed for air circulation and proper access to the door.
• Do not install these products where the temperature will go below 55°F (13°C) or above 90°F (32°C).
• Do not install where it will be subject to direct sunlight, heat or moisture.
• These products are not designed to be stacked one over the other.
Black or Stainless Steel Toekick Options
• These products are shipped with a black toekick installed. An optional stainless steel toekick is also supplied with each product. For shipping purposes, the stainless steel toekick is secured to the back of the unit.
ZTBSS1 Tubular Handle
ZTBSS1 Monogram stainless steel tubular handle is available for models ZDWI240WII and ZDBI240WII.
SIDE-BY-SIDE INSTALLATIONS
Increase storage capacity by installing two Monogram beverage centers, wine chillers or wine reserves together. Or, for a complete refreshment center, install any two of these units together.
• A side-by-side installation requires at least a 47-1/2 wide opening. No trim kits required.
• Products must operate from separate, properly grounded receptacles.
Locate
Outlet
10-1/2"
9"
1-1/2"
24"
34-1/2"-35"
15"
10-1/2"
14"
9"
47-1/2" Min.
3
Loading...
+ 5 hidden pages