GE PVW7301EJ1ES, PVW7301SJ1SS, PVW7361EJ1ES, PVW7361SJ1SS Installation Guide

I stallatio
GJassWalJ
!
Z
Chimney Vent Hoods
I structios
Pl "If you have questions, call 800.GE.CARES (800.432.2737) or visit our website at: GEAppliances.com"
BEFORE YOU BEGIN
Read these instructions completely and
.IMPORTANT - Savetheseinstructions
forlocalinspector'suse.
,IMPORTANT - Observeallgoverning
codes and ordinances.
, Note to Installer-Be sure to leavethese
instructionswiththe Consumer.
, Note to Consumer - Keep these instructions
forfuturereference.
, Skilllevel- Installationofthisventhood
requiresbasicmechanical and electricalskills.
, Completion time - Approximatelyi to 3 hours
, Proper installationisthe responsibilityofthe
installer.
* Product failure due to improper installation is
not covered under the Warranty.
^,,-CAUTION: Due tothe weight and sizeof
thesevent hoods and to reduce the riskof
personalinjuryordamage to theproduct,TWO PEOPLE ARE REQUIRED FOR PROPER
INSTALLATION.
PVW7301, PVW7361
kLW/'_I_I_i I I_i_: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR INJURY TO PERSONS, OBSERVE THE FOLLOWING:
A. Installation work and electrical wiring
must be done by qualified person(s) in
accordance with all applicable codes and standards, including fire-rated construction.
B. Sufficient air is needed for proper
combustion and exhausting of gases through the flue (chimney) of fuel burning
equipment to prevent back drafting. Follow the heating equipment manufacturer's guidelines and safety standards such as those published by the National Fire
Protection Association (NFPA), the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE)
and the local code authorities.
C.
When cutting or drilling into wall or ceiling,
do not damage electrical wiring and other
hidden utilities.
D.
Ducted fans must always be vented to the
outdoors.
E.
Turn off breaker to adjacent rooms while working.
A, ,,,^,-., ,,,, ,., ,,'-
_W/4LKi_ilI_i_: TO REDUCE THE RISK
OF FIRE, USE ONLY METAL DUCT WORK.
r- r-
!
O
Z
!
Z
-4 C
N
-4
!
O
Z
FOR YOUR SAFETY:
AWARNING: Beforebeginningthe
installation, switch power off at service panel and lock the service disconnecting means to prevent
power from being switched on accidentally.
When the service disconnecting means cannot
be locked, securely fasten a prominent warning
device, such as a tag, to the service panel.
(991.0364.613revl)31-ii007 04-15 GE
Z
0
g
Installation Preparation
Z
0
i
_J _J
Z
i
PRODUCT DIMENSIONS
i0-i
15-3/4" _
© ©
4-15/16"
14i3/16" r
18-1/2"
INSTALLATION CLEARANCES
These vent hoods are designed to be installed onto a wall with no above cabinets.
, Install these hoods between the 24" required
minimum and 36" recommended maximum above the cooking surface.
24" Required IVlin. 36" Recommended Max.
The vent hood must be installed between the 24" required minimum and 36" recommended
maximum above the cooking surface. The hood installation height above the cooking surface depends upon ceiling height and duct cover limitations. The telescopic duct cover conceals the ductwork running from the top of the hood to the ceiling. For supplied duct cover ceiling
heights, see table on page 5.
NOTE: Installation height should be measured from the cooking surface to the lowest part
of the hood. This hood must be installed onto a wall. It can be vented to the outdoors, or it can be installed for recirculating operation. For
recirculation operation, see Recirculation Install
Planning.
31 11007
Installation Preparation
!
Z
ADVANCE PLANNING
Duct Install Planning , This hood is designed to be vented vertically
through the ceiling. Use a 6" round duct. Use locally supplied elbows to vent horizontally through the rear wall.
, Use metal ductwork only. , Determine the exact location of the vent hood.
, Plan the route for venting exhaust to the
outdoors. To maximize the ventilation performance of the vent system:
1. Minimize the duct run length and number of transitions and elbows.
2. Maintain a constant duct size.
3.Seal all joints with duct tape to prevent any leaks.
4. Do not use any type of flexible ducting.
, Install a wall cap or roof cap with damper
at the exterior opening. Purchase the wall or roof cap and any transition and length of duct
needed in advance.
, When applicable, install any makeup
(replacement) air system in accordance with local building code requirements. Visit GEAppliances.com for available makeup air
solutions.
Recirculation Install Planning A recirculation duct (included) and one charcoal filter (not included) are necessary for recirculation
installation.
Power Supply Planning The location of the power supply connection is
called out in the Prepare the Wall section on
page 6.
POWER SUPPLY
IMPORTANT- {Please read carefully}
AWARNING:
FOR PERSONAL SAFETY,THIS APPLIANCE MUST BE PROPERLYGROUNDED.
Remove house fuse or open circuit breaker before beginning installation.
Do not use an extension cord or adapter plug with this appliance. Follow National Electrical Codes or prevailing local codes and ordinances.
Electrical supply These vent hoods must be supplied with 120V,
60Hz, and connected to an individual, properly grounded branch circuit, and protected by a 15 or 20 amp circuit breaker or time delay fuse.
, Wiring must be 2 wire with ground.
, If the electrical supply does not meet the above
requirements, call a licensed electrician before proceeding.
, Route house wiring as close to the installation
location as possible in the ceiling or wall.
, Connect the wiring to the house wiring in
accordance with local codes.
Grounding instructions The grounding conductor must be connected to
a ground metal, permanent wiring system, or an equipment-grounding terminal or lead on the hood.
AWARNING: The improper connection
of the equipment-grounding conductor can result in a riskof electric shock. Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded.
I'- I--
!
O
Z
mo
m
-0
:1>
!
O
Z
31 11007 3
Z
O
g
Installation Preparation
Z
O
i
_J _J
Z
i
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Safety glasses
Pencil and tape measure
Phillips screwdriver
Level
Wire cutter/stripper
Electric drill with #2 Phillips, flat head, and 9/32" drill bit
UL listed wire nuts
Aluminized Duct tape
©
Strain relief for
junction box
REMOVE THE PACKAGING
PLAN THE INSTALLATION
A CAUTION: To reduce risk of fire and to
properly exhaust air, be sure to duct the air outside - Do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces, or garages.
PARTS SUPPLIED FOR INSTALLATION
.1 Hardware Package
,1 Literature Package
PARTS NEEDED FOR INSTALLATION
, i Strain Relief
, Power Supply Cable
, i Wall or Roof Cap (for ducted venting only)
, All Metal Ductwork (for ducted venting only)
, Recirculation Duct (for recirculation install only)
WARNING:
PERSONAL INJURY HAZARD
Because of the weight and size of the rangehood canopy. It is recommended that 2 people are used to install the range hood. Failure to properly lift
rangehood could result in damage to the product or personal injury.
NOTE: This rangehood can be installed as either ducted or recirculation. In a ducted application, this rangehood can be vented through the wall or ceiling. When installed for recirculation, the
rangehood vents out the sides of the duct cover.
A CAUTION: Wear gloves to protect
against sharp edges.
, Remove the duct covers. . Remove the hardware bag, literature package
and other boxed parts.
. Remove and properly discard the protective
plastic wrapping and other packaging materials.
- 31 11007
NOTE: Before making any cuts or holes for installation, determine which venting method will
be used and carefully calculate all measurements.
Installation Preparation
!
Z
¢/)
RANGE HOOD COMPONENTS
A. Canopy Section H. Mounting Bracket B. Upper Duct Cover I. Washers C. Lower Duct Cover J, Canopy Mounting D. Mounting Screws Anchors
E. Duct Cover K. Duct Cover Anchors
Mounting Brackets L. Dry Wall Self-
F, Damper Tapping Screws G, Duct Cover Screws (for Junction Box)
D
G
C
G
INSTALLATION DIMENSIONS
The Glass Chimney Hoods are adjustable and designed to meet varying ceiling heights. The duct covers can be adjusted for ceilings between
7' 4-1/4" and 9' 3-1/4" depending on the distance between the bottom of the hood and the cooktop
(distance X).
T
5-1/8" min
16-1/8" max
21-i
8"
1-3/4';
_ 18-1/2" _
X = Distance From Hood To Cooktop
Upper
Duct Cover
Lower
Duct Cover
(Varies depending on installation}
Required Min 24",
Recommended Max - 36"
also consult cooktop
manufacturer's recommendation
I
Required Min & Recommended
Max Ceiling Height Examples
x = 24" x = 36"
Min Min
7' 4-1/4" 8' 4-1/4"
Mox Max
8' 3-i/4" 9' 3-i/4"
For higher ceiling installations, the
High Ceiling Duct Cover Kit {JXDC71} includes o new 29-1/8" lower duct
cover which would replace the 21-3/8"
lower duct cover that come with the hood
r" r-
!
O
Z
"D
rrl
"0
!
O
Z
A
D
RECIRCULATION COMPONENTS
Recirculation Duct
Recirculation Duct Extensions
Recirculation Bracket
Cabinet Base
36"
V
HARDWARE COMPONENTS
< <
<
<
1
%
D
G
J K L
31 11007 S
Loading...
+ 11 hidden pages