GE Monogram ZV42I, Monogram ZV54I Installation Instructions Manual

Page 1
Monogram.
®
If you have questions, call 800-GE-CARES or visit our website at: www.monogram.com
Installation Instructions
Island Vent Hoods
Models: ZV42I ZV54I
Page 2
2
Installation Instructions
WARNING: TO REDUCE THE
RISK OF FIRE, ELECTRICAL SHOCK OR INJURY, OBSERVE THE FOLLOWING:
A. Use this unit only in the manner intended by the
manufacturer. If you have any questions, contact the manufacturer. B. Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent power from being switched on accidentally. If the service panel cannot be locked, fasten a tag or prominent warning label to the panel.
ADVERTISSEMENT
POUR RÉDUIRE LE RISQUE D’INCENDIE, DE CHOC ÉLECTRIQUE OU DE BLESSURES, IL
FAUT OBSERVER LES REGLES SUIVANTES:
A. Utiliser cet appareil uniquement de la maniére
prévue par le fabricant. En cas de question, consulter le fabricant.
B. Avant toute intervention ou nettoyage, couper
l’alimentation électrique au disjoncteur et verrouiller le panneau du disjoncteur pour éviter la mise sous tension accidentelle. S’il n’est pas possible de verrouiller le panneau du disconcteur, attacher un placard ou une étiquette trés visible au panneau.
• For general ventilating use only. Do not use to exhaust hazardous or explosive materials or vapors.
• Structural framing, installation work and electrical wiring must be done by qualified person(s). In accordance with all applicable codes and standards including fire-rated construction.
• Sufficient air is needed for proper combustion and exhausting of gases through the flue (chimney) of fuel burning equipment to prevent back drafting. Follow the heating equipment manufacturer’s guideline and safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), and the local code authorities.
• Local codes vary. Installation electrical connections and grounding must comply with applicable codes. In the absence of local codes, the vent should be installed in accordance with National Electrical Code ANSI/NFPA 70-1990 or latest edition.
CAUTION: To reduce risk of fire
and to properly exhaust air, be sure to duct
air outside – Do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces, or garages.
PRUDENCE Il faut prendre
soin d’installer un conduit vers l’extérieur
pour réduire le risque d’incendie et pouvoir évacuer l’air correctement. Il ne faut pas évacuer l’air correctement. Il ne faut pas évacuer l’air dans l’espace entre les parois d’un mur, un plafond ou un grenier, un espace sanitaire ou un garage.
BEFORE YOU BEGIN
Read these instructions completely and carefully.
•IMPORTANT – Save these instructions for local
inspector’s use.
•IMPORTANT – Observe all governing codes and
ordinances.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions for future reference.
Skill Level – Installation of this vent hood requires basic mechanical and electrical skills.
Completion time – 1 to 3 hours.
• Proper installation is the responsibility of the installer.
• Product failure due to improper installation is not covered under the Warranty.
CAUTION:
Due to the weight and size of these vent hoods and to reduce the risk of personal injury or damage to the product, THREE PEOPLE ARE REQUIRED
FOR PROPER INSTALLATION.
PRUDENCE
À cause du poids et des dimensions du ces hottes et pour réduire les risques de blessures ou de dommages du produit, IL FAUT TROIS PERSONNES
POUR FAIRE UNE INSTALLATION CORRECTE.
WARNING:
To reduce the risk of fire or electrical shock, do not use this range hood with any external solid-state speed control device. Any such alteration from original factory wiring could result in damage to the unit and/or create an electrical safety hazard.
ADVERTISSEMENT
Pour réduire le risque d’incendie ou de choc électrique, il ne faut pas utiliser cette hotte avec un régulateur de vitesse électronique externe. Toute modification de ce type du branchement d’usine peute endommager l’appareil ou créer un risque de choc électrique.
TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.
Page 3
3
Design Information
42” HOOD DIMENSIONS
Model ZV42I
Model ZV54I
CONTENTS
Design Information
Product Dimensions......................................................................3
Duct Cover Accessories ..............................................................4
Product Clearances ......................................................................4
Advance Planning
Ductwork Planning ......................................................................5
Ceiling Framing for Support ........................................................5
Accessory Frames and Duct Covers ........................................5
Power Supply ................................................................................5
Installation Height ........................................................................6
Duct Fittings .................................................................................. 7
Installation Preparation
Tools and Materials Required ....................................................8
Remove the Packaging ................................................................8
Parts, Hardware, Accessory Packages ..................................9
Installation Instructions
Step 1, Construct Ceiling Support ......................................10–12
Step 2, Mount Template..............................................................13
Step 3, Size and Install Ductwork ............................................13
Step 4, Install Support Frame and Duct Covers ....................14
Step 5, Install Duct Transition and Damper ..........................15
Step 6, Install Hood to Support ................................................15
Step 7, Connect Duct ................................................................15
Step 8, Connect Electrical..........................................................16
Step 9, Install the Motor ............................................................16
Step 10, Slide Duct Cover down ..............................................17
Step 11, Install Filters..................................................................17
Step 12, Install Rods....................................................................17
Step 13, Install Supplied Duct Cover, Top Cover....................18
Step 14, Finalize Installation ......................................................18
Step 15, Installation Checklist ..................................................19
These vent hoods are supplied with a support frame and decorative duct cover for ceiling heights of 7’11" to 8’5". The hood installation height is determined by the ceiling height. Accessories are available to reach ceiling heights from 8’6" to 10’4".
20"
27-1/2"
34"
31-1/2"
42"
24"
32-1/4"
46"
36-1/4"
54"
54” HOOD DIMENSIONS
Supplied duct covers dimensions: 16"W x 12"D x 9"H Supplied duct covers dimensions: 20-1/4"W x 12"D x 5"H
Page 4
4
Design Information
DUCT COVER ACCESSORIES
ZV42I
* 9" for ceiling heights 7’11" to 8’5" using the supplied
support frame and duct cover.
Order ZX42DC10 for ceiling heights of 8"6" to 10’4".
ZV54I
* 5" for ceiling heights 7’11" to 8’5" using the supplied
support frame and duct cover.
Order ZX54DC10 for ceiling heights of 8"6" to 10’4".
These accessories include telescoping support frames and decorative covers. Order the accessory for your model at the same time as the vent hood and have on site before installation begins.
PRODUCT CLEARANCES
These vent hoods must be installed 30" min. to 36" max. above the cooking surface. Exact installation height is determined by ceiling height. The cooking surface should be at least 36” above the floor.
IMPORTANT: Clearances may vary due to type of cooking product and local codes. Check with local inspectors to be sure standard is applicable.
• When installing these Island Hoods above a Monogram Professional Range or Cooktop, installation clearance must be at least 30".
20" For ZV42I 24" For ZV54I
*Height
to Ceiling
30" Min.
36" Max.
36" Min.
Page 5
5
Advance Planning
ADVANCE PLANNING
Ductwork Planning
• These vent hoods are equipped for 10” round ductwork.
• Determine the exact location of the vent hood.
• Plan the route for venting exhaust to the outdoors.
• Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 ft. equivalent length for any duct configurations.
• Refer to “Duct Fittings” chart to compute the maximum permissible length for duct runs to the outdoors.
• Use rigid metal ductwork only.
• Install a roof cap with damper at the exterior opening. Order the cap and any transitions needed in advance.
Ceiling Framing for Adequate Support
• These vent hoods are heavy. Adequate structural support must be provided. The ceiling structure must be capable of supporting the weight of the hood and any inadvertent user contact loads (approximately 300 pounds). The hood support frame will be supported by 2 x 4 cross framing.
Accessory Frames and Duct Covers
• All models are shipped with a support frame and duct covers for ceilings heights of 7’11" to 8’5".
• Optional accessories include telescoping support frames and duct covers to reach 8’6” and up to 10’4” ceiling heights.
• Optional accessories must be ordered with the hood and be on site before final framing and wall finishing.
Mounting the hood without a support frame
The distance between the cooking surface and the bottom of the hood must be 30" to 36". In situations where the ceiling is low, the hoods may be secured directly to the ceiling without the supplied frame. Use the bottom of the supplied support frame as a template to locate the mounting holes in the top of the hood. Use shims on the ceiling joists or cross framing in the mounting hole locations. This will allow the mounting screws to engage the recessed keyhole slots in the top of the hood. See Step 2.
POWER SUPPLY
IMPORTANT - (Please read carefully)
WARNING:
FOR PERSONAL SAFETY, THIS APPLIANCE
MUST BE PROPERLY GROUNDED.
ATTENTION – POUR DES
RAISONS DE SÉCURITÉ, CET APPAREIL
DOIT ÊTRE CORRECTEMENT MIS À LA TERRE.
Remove house fuse or open circuit breaker before beginning installation.
Do not use an extension cord or adapter plug with this appliance. Follow National electrical codes or prevailing local codes and ordinances.
Electrical Supply
This vent hood must be supplied with 120V, 60Hz, and connected to an individual, properly grounded branch circuit, and protected by a 15 or 20 amp circuit breaker or time delay fuse.
• Wiring must be 2 wire with ground.
• If the electrical supply does not meet the above requirements, call a licensed electrician before proceeding.
• Route house wiring in the ceiling, as close to the installation location as possible. Allow additional length from ceiling joists to reach the junction box on the bottom of the hood support frame.
• Connect the wiring to the house wiring in accordance with local codes.
Grounding Instructions
The grounding conductor must be connected to a ground metal, permanent wiring system, or an equipment-grounding terminal or lead on the hood.
WARNING: The improper
connection of equipment-grounding conductor can result in a risk of electric shock. Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded.
ADVERTISSEMENT
Le mauvais branchement du fil de mise à la terre peut causer un choc électrique. En cas de doute, consulter un électricien qualifié ou un technicien pour déterminer si l’appareil est à la terre.
Page 6
INSTALLATION HEIGHT REQUIREMENTS
• These vent hoods must be installed 30" min. and 36" max. above the cooking surface – regardless of the ceiling height. Therefore, installation height of the hood, depends on the exact ceiling height of the kitchen.
• Accessories are available for ceiling heights 8’6" and up to 10’4".
Example: Hood installation height with 8 ft. ceilings.
• Both models are shipped with a support frame and duct cover for 7’11" to 8’5" ceilings.
• If the ceiling height is 7’11", the installation height above the cooking surface will be 30".
• If the ceiling height is 8’5" the hood installation height will be 36".
DETERMINE INSTALLATION HEIGHT
1. Measure the exact ceiling height.
2. Review the chart to determine the range of hood
installation heights that can be accomplished with or without an accessory kit.
ACCESSORIES
ZX42DC10 – Optional Accessory for ZV42I. ZX54DC10 – Optional Accessory for ZV54I. Accessories for ceiling heights of 8’6" to 10’4".
Includes telescoping support frames and duct covers.
ZV42I
ZV54I
8 ft. Ceiling
9" Supplied Duct Cover
31"
8 ft. Ceiling
5" Supplied Duct Cover
31"
Advance Planning
Model ZV54I
Actual Chimney Length at Duct Ceiling Hood Installation Height Cover Height 30" 31" 32" 33" 34" 35" 36" Kit
10’4" 28 10’3" 28 27 Order 10’2" 28 27 26 ZX54DC10 10’1" 28 27 26 25 Use Long 10’ 28 27 26 25 24 Support 9’11" 28 27 26 25 24 23 and 9’10" 28 27 26 25 24 23 22 Duct Cover 9’9" 27 26 25 24 23 22 21 9’8" 26 25 24 23 22 21 20 9’7" 25 24 23 22 21 20 19 9’6" 24 23 22 21 20 19 18 9’5" 23 22 21 20 19 18 17 9’4" 22 21 20 19 18 17 16 Order 9’3" 21 20 19 18 17 16 15 ZX54DC10 9’2" 20 19 18 17 16 15 14 Use Short 9’1" 19 18 17 16 15 14 13 Support 9’ 18 17 16 15 14 13 12 and 8’11" 17 16 15 14 13 12 Duct Cover 8’10" 16 15 14 13 12 8’9" 15 14 13 12 8’8" 14 13 12 8’7" 13 12 8’6" 12 8’5" 5
Use
8’4" 5
Supplied
8’3" 5
Support
8’2" 5
and
8’1" 5
Duct Cover
8’ 5 7’11" 5
Model ZV42I
Actual Chimney Length at Duct Ceiling Hood Installation Height Cover Height 30" 31" 32" 33" 34" 35" 36" Kit
10’4" 36 35 34 33 32 10’3" 36 35 34 33 32 31 Order 10’2" 36 35 34 33 32 31 30 ZX42DC10 10’1" 35 34 33 32 31 30 29 Use Long 10’ 34 33 32 31 30 29 28 Support 9’11" 33 32 31 30 29 28 27 and 9’10" 32 31 30 29 28 27 26 Duct Cover 9’9" 31 30 29 28 27 26 25 9’8" 30 29 28 27 26 25 24 9’7" 29 28 27 26 25 24 23 9’6" 28 27 26 25 24 23 22 9’5" 27 26 25 24 23 22 21 Order 9’4" 26 25 24 23 22 21 20 ZX42DC10 9’3" 25 24 23 22 21 20 19 Use Short 9’2" 24 23 22 21 20 19 18 Support 9’1" 23 22 21 20 19 18 17 and 9’ 22 21 20 19 18 17 16 Duct Cover 8’11" 21 20 19 18 17 16 15 8’10" 20 19 18 17 16 15 8’9" 19 18 17 16 15 8’8" 18 17 16 15 8’7" 17 16 15 8’6" 16 15 8’5" 15 9 8’4" 9 Use 8’3" 9 Supplied 8’2" 9 Support 8’1" 9 and 8’ 9 Duct Cover
7’11" 9
6
Duct Cover
20" for ZV42 24" for ZV54I
30" Min. and 36" Max.
36"
Countertop
I
Ceiling Height
to
Page 7
Equivalent Quantity Total
Duct Piece Length* Used Length
Round, 1 ft.
straight (per foot
length)
1 ft. 3-1/4" x 24" (per foot straight length)
90° elbow 15 ft.
45° elbow 9 ft.
3-1⁄4" x 12" or 3-1/4" x 24" 90° elbow 15 ft.
3-1/4" x 24" 45° elbow 9 ft.
3-1/4" x 24" 90° flat elbow 20 ft.
10" round to 3-1/4" x 24" transition 1 ft.
3-1/4" x 24" to 10" round transition 5 ft.
10" round to 3-1/4" x 24" transition 90° elbow 5 ft.
3-1/4" x 24" to 10" round transition 90° 15 ft. elbow
Round wall cap with damper 30 ft.
3-1/4" x 24" wall cap with damper 30 ft.
Round roof cap 26 ft.
Round roof vent 24 ft.
7
Advance Planning
DUCT FITTINGS
Use this chart to compute maximum permissable lengths for duct runs to outdoors.
Note: Do not exceed maximum permissable equivalent lengths!
Maximum recommended duct length for these hoods: 150 equivalent feet
Flexible ducting:
Flexible metal ducting is not recommended. If it must be used, all the equivalent feet values in the table should be doubled. The flexible metal duct should be straight and smooth and extended as much as possible. Semi-rigid flexible duct is preferred when flexible duct must be used.
Do NOT use flexible plastic ducting.
Total Duct Run
Note: Any home ventilation system, such as a ventilation
hood, may interrupt the proper flow of combustion air and exhaust required by fireplaces, gas furnaces, gas water heaters and other naturally vented systems. To minimize the chance of interruption of such naturally vented systems, follow the heating equipment manufacturer’s guidelines and safety standards such as those published by NFPA and ASHRAE.
* Actual length of straight duct plus duct fitting
equivalent. Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood.
Hoods Are Equipped
For 10" Round Duct
*Hoods are supplied with a 10"
round transition. A locally supplied transition is required for other sizes.
Note: Outlet on top of hood is 8-1/8" x 8".
Page 8
8
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Pliers
Electric or battery operated drill and 3/16", bits, Phillips and Flat Blade Screwdriver bits.
120V 60Hz. 15 or 20 Amp, 2-wire with ground. Properly grounded branch circuit.
Key Hole Saw
Hammer
Wire cutter/stripper
Step ladder
Metal Snips
Saber saw or Sawsall
Wire nuts
Phillips and flat blade screwdrivers
Strain relief for junction cover.
Spirit level
Flashlight
Safety glasses
10" round metal duct, length to suit installation.
Duct tape
7/16" Pivoting
hex socket with 4" and 6" extensions
REMOVE THE PACKAGING
Remove the parts packages and packing materials.
Lift the hood out of the box.
IMPORTANT: Lift the hood by grasping
the outside edges of the exhaust opening on the top.
Carefully, lay the hood on its side. A support frame is secured to the inside top of the hood. Remove the attachment screws at the outside top. Discard screws.
Grasp the support frame inside the hood with both hands and carefully rotate out of the opening.
Be careful not to scratch the hood.
Hood
Parts Parts
Parts
Motor
Mounted
on Skid
Shipping Carton
Place the hood on a protective surface to prevent scratches and damage to the stainless steel finish.
The hood motor is shipped secured to the skid with 4 screws. Locate and remove 2 screws on each side of the motor. Discard the shipping skid and screws.
Carpenters square
Page 9
9
Installation Preparation
PARTS PROVIDED
Locate the parts packed with the hood.
HARDWARE PACKAGE
Locate and check contents. Screws shown actual size.
2 Grease trays (3 with 54" hood)
Implement rods with standoffs
Duct collar
Support frame for 8 ft. ceiling with 4 large pan head screws installed on the bottom corners.
2-piece decorative duct cover
Transition with Damper
Decorative top cover
2 Filters (3 with 54" hood)
ACCESSORY PACKAGE
Check accessory package. Select the taller set for 96 to 104" ceilings. Select the shorter set for 86" to 96" ceilings. Discard unused set.
Page 10
10
Plan the Location of the Hood and Ductwork
Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood.
The hood should extend beyond the front and rear edge of the cooking appliance.
The duct in the ceiling must be centered over the cooktop.
STEP 1 CONSTRUCT CEILING SUPPORT
Installation Instructions
Ceiling
Hood Ducting Centerline
42" Hood Side View
Align With
Center of
Cooktop
Cooktop
Countertop
31-1/2"
Front
15-3/4"
Align With
Center of
Cooktop
Ceiling
Hood Ducting Centerline
54" Hood Side View
Cooktop
Countertop
36-1/4"
Front
18-1/8"
Top View – Ceiling Joists Parallel to Front of Hood
12-3/4 (42 Hood) 17
(54 Hood) Install Cross-
Framing Symmetrically
About Duct/Cooktop
Centerline
16 Joist Spacing
8 5/8
10 Duct
Front
of
Hood
2x4 Cross Framing
Cooktop Outline
Align duct to center of Cooktop
Ceiling Support Structure
At the hood location, install 2 x 4 cross framing between ceiling joists as shown. (2x4’s are required to support the weight of the hood.)
Arrange cross framing in the ceiling to suit the existing structure.
Your ceiling joists will be like one of the following examples.
EXAMPLE A
Page 11
11
Top View – Ceiling Joists Run Perpendicular to Front of Hood
Top View – Ceiling Joists at Angle with Front of Hood
Installation Instructions
STEP 1 CONSTRUCT CEILING SUPPORT
CONTINUED
12-3/4 (42 Hood)
17 (54 Hood)
Install Cross-
Framing
Symmetrically About
Duct/Cooktop
Centerline
16 Joist Spacing
8 5/8
10 Duct
Front
of
Hood
2x4 Cross Framing
Cooktop Outline
Align duct to center of Cooktop
12-3/4 (42 Hood) 17 (54
Hood) Install Cross-Framing
Symmetrically About
Duct/Cooktop Centerline
16 Joist Spacing
8 5/8
10 Duct
Front
of
Hood
2x4 Cross Framing
Cooktop Outline
Align duct to center of Cooktop
EXAMPLE B
EXAMPLE C
Page 12
12
STEP 1 CONSTRUCT CEILING SUPPORT
CONTINUED
Installation Instructions
Ductwork
Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 feet equivalent length for any duct configuration.
Refer to Duct Fittings chart to compute the maximum permissible length for duct runs to the outdoors.
This vent hood must use 10 round rigid duct.
Install the house ductwork to run horizontally between
ceiling joists or straight up through the roof.
Finish the Ceiling
Finish the ceiling surface. Be sure to mark location of the ceiling joists and cross framing. Check to be sure the ceiling is level, use shims if necessary.
Ceiling
Joist
17"
(54" Hood)
12-3/4"
(42" Hood)
2x 4 Min.
Cross Framing
Height
Adjustment
Screw Holes
8-5/8"
Ceiling Joint
2x4
10"
Duct
Vent Straight Up
Through The Ceiling
Secure each 2 x 4 block with at least four (4), #10 wood screws, 3 long (not supplied). Use 8 wood screws total for the two supports.
The cross framing must be accurately aligned to assure correct positioning of the hood.
The cross framing must be level in all directions. Check with a spirit level and adjust if necessary.
IMPORTANT: The ceiling structure must be capable of supporting the weight of the hood (approximately 300 pounds) and any inadvertent user contact loads. The hood support frame will be supported by the 2 x 4 cross framing.
Page 13
13
Select the template for your hood size.
Align the template with the marks on the ceiling and
tape in place. – Be sure the template is oriented correctly,
with the front of the hood.
Use a plumb to check to be sure the mounting holes will provide parallel alignment with the countertop below.
Center punch all hole locations.
Drill pilot holes in the 4 screw locations. Use a 3/16 bit and drill approximately 1-1/2 deep.
Drive 4 Hex head wood screws (Screws A) into
the center of the ceiling joists and cross framing. Leave a 1/4" gap to allow the screw head to engage the keyhole slots on the support frames.
Cut the 10-1/2" duct opening through the sheet rock.
STEP 2 MOUNT TEMPLATE
Installation Instructions
STEP 3 SIZE AND INSTALL DUCTWORK
Measure from house duct flange to bottom of support frame. Subtract 4-3/8" for clearance to the bottom of the support frame.
Cut the 10 duct length to size.
Secure duct to house ducting with sheet metal screws.
Seal all connections with duct tape.
Attach the duct collar loosely, about 1" from the bottom
of the duct using Screws B.
Page 14
14
Installation Instructions
STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COV­ERS
Install supplied support frame OR telescoping accessory frame
Hang the supplied support frame or telescoping accessory frame to the ceiling joists and cross framing on the 4 hex head screws by engaging the keyhole slots on the frame.
Check to be sure the support frame is level, vertically and horizontally.
Tighten the hex head screws securely.
Install safety screws, (Screws E) on each side of the
frame.
Adjust telescoping accessory frame to length
Remove the 8 frame adjustment screws. Adjust the lower support up or down to the pre-determined length. Reinstall and securely tighten the 8 adjustment screws.
Slide the top (inner) accessory duct cover up and over the frame. Secure the duct cover to the frame as shown using Screws D.
Locate and remove the safety stop screw. Slide bottom duct cover up and over the top duct cover. Align bottom duct screw hole to the hole in the frame. Hold the duct cover in place while installing screw.
CAUTION: The stop screw
must be installed. Failure to do so could result in personal injury or damage to the duct cover. The stop screw will prevent the lower duct from sliding down while completing the installation.
PRUDENCE
Il faut mettre en place la vis de butée afin d’éviter des blessures ou dendommager lenceinte du conduit. La vis de butée empêche lenceinte inférieure du conduit de descendre pendant linstallation.
Secure house wiring
Route house wiring through the ceiling and pull a length to reach the hood junction box, approximately 6 below the support. Tape to the right side of the support frame.
IMPORTANT: Again, check to be sure the support is level in both directions. There is no way to level the hood after the hood is secured to the frame.
Install
Safety Screw
on Each Side
Adjust
Frame to
Height
Install Small Pan Head
Screws on Each Side
Top Duct
Cover
Bottom Duct
Cover
Install Stop
Screw
Stop Screw
Storage Location
Screws E
Screws D
Page 15
15
Installation Instructions
STEP 5 INSTALL DUCT TRANSITION
WITH DAMPER
IMPORTANT: Remove shipping tape from damper and check that damper moves freely.
Place the transition piece over the hood exhaust and secure with 4 Screws C provided.
Use duct tape to seal the connection. Check to be sure the damper moves freely.
STEP 6 INSTALL HOOD
Note: THREE PEOPLE ARE REQUIRED TO COMPLETE THIS INSTALLATION!
Back out the hanging screws on the bottom of the support frame to a 1/4" gap.
Lift the hood up to the support frame. Carefully align the hood keyhole to the screws on the support frame. Slide the hood to engage the keyhole slots.
Tighten the screws.
Slide Duct
Collar Down
to Cover Gap
Duct
Transition
Bumper Pads
Attachment
Screws
Attachment
Keyholes
1/4" Gap
Install
2 Safety
Screws
Page 16
16
Installation Instructions
STEP 8 CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING: If house wiring is not
2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use UL approved anti-oxidant compound and aluminum-to-copper connectors.
ATTENTION – Si le câblage de la
maison nest pas du type à deux fils avec un fil de terre, linstallateur doit fournir un circuit de terre. Quand les fils de la maison sont en aluminium, il prendre soin dutiliser de la pâte antioxidation approuvée par UL et des connecteurs pour laluminium-cuivre.
STEP 9 INSTALL THE MOTOR
From the inside of the hood, slip motor into the attachment slot on the left.
Rotate motor upwards until it snaps into the spring clip on the right.
Secure the motor to the hood with the machine screw and lock washer (Screw is marked with red paint.)
Plug blower cable into the connector on the blower.
Spring
Clip
Outlet
Attachment
Slot
Junction Box
Plug cable at the top of the hood into the junction box connector. Route cable so it wont be pinched or damaged when the duct cover is lowered.
Top
Install strain relief onto the knockout of the junction box.
Insert house wiring through strain relief and tighten.
Use wire nuts to connect incoming ground to green,
white to white and black to black.
Push wires into junction box and replace cover. Be sure wires are not pinched.
Screw F
Spring
Clip
Attachment Screw
and Washer
Attachment
Slot
IMPORTANT: Connector ends are designed to mate only one way. Match flat and round connectors as shown.
Page 17
17
Installation Instructions
STEP 11 INSTALL FILTERS
Insert the filter into the upper opening and drop into the trays.
To remove the filters, grasp the knobs and push the filter up and lift out.
STEP 12 INSTALL RODS
Use a flat blade screwdriver to install stand-offs into the bottom of the hood.
Align implement rod to stand-offs with the screw hole towards the inside of the hood. Secure the rod to the stand-offs with the supplied Allen wrench.
Follow the same procedure on the opposite side.
Place filter drip trays into the rear of the hood.
Screw
Stand-offs
Into Hood
Use Allen
Wrench to Secure Rod to Stand-offs
STEP 10 SLIDE DUCT COVER
DOWN
SKIP THIS STEP IF USING THE SUPPLIED DUCT COVER
Hold the duct cover in place and remove the temporary stop screw. Return the screw to the storage location for future use.
Slide the lower duct cover down onto the hood.
Page 18
18
STEP 13 INSTALL SUPPLIED DUCT
COVER AND TOP COVER
STEP 14 FINALIZE INSTALLATION
Check all lamps to assure tightness in sockets.
Turn power on at the circuit breaker.
Refer to the Owners Manual for operating and
cleaning instructions.
Engage tabs into slots on each side at the top of the hood. The covers should lay flat in the impression on top of the hood.
Installation Instructions
Install 2 Screws C to secure the cover to the hood at
the front and back.
Install the supplied 2-piece duct cover over the support frame (if using supplied frame). Snap ends together.
Secure duct covers to support frame with 2 Screws D.
For a more finished appearance, a top cover is supplied and should be installed whenever the top of the hood is visible.
Screws D
Tabs
Tape
Screws C
Top Cover
Install Screws Front and Back
Install Duct Cover Screw on Each Side
TIP: Place pieces of tape over ends of the cover to prevent scatching the duct cover. Remove tape before installing screws.
Page 19
19
STEP 15 INSTALLATION CHECKLIST
Check Blower Safety Screw
Ensure that blower safety screw is securely tightened.
See page 16, Step 9. If screw is missing, order replacement parts bag.
Check Operating Sound and Proper Air-Flow
Turn blower to each speed setting and listen for rattles
and vibration. You should notice an audible difference at each speed setting.
Check for foreign material in transition.
Check that blower screen is not damaged or pushed
into the blower impeller.
The damper should move freely. Listen for opening and
closing while turning the unit on and off.
Check that the damper is not damaged, does not
vibrate and that damper bumper pads are in place. Order a damper replacement assembly if needed.
Check that ductwork is 10" round. If duct type is not
rigid and less than 10" round, inform the consumer that performance will be reduced.
Check Lighting Function
Check that power cable is plugged into the junction
box on top of the hood.
Turn halogen lamps to each setting. Note change in
brightness at different settings.
Check that each lamp bezel is secure. Turn to the right
to tighten. Order replacement lamp bezel and socket assemblies if needed.
Installation Instructions
Check appearance and installation
Use a spirit level to check that the hood is level.
Review installation instructions to determine source of problem.
Top covers (if used) should lay flat in the recess on
top of the hood. Make sure side tabs are engaged in slots and the cover is secured with two screws.
Clean the hood surfaces and all filters. See the
Owner’s Manual for cleaning instructions. They should be free of construction debris such as sawduct.
Page 20
Pub. No. 49-80209-1 Dwg. No. 164D4290P361
09-03 JR
Note: While performing installations described in this book, safety glasses or goggles should be worn.
For Monogram®local service in your area, call 1-800-444-1845.
Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice.
GE Consumer Products General Electric Company Louisville, KY 40225
© 2003 General Electric Company
Monogram.
®
Loading...