GE Carestation 650c Installation Instructions Manual

Page 1
Installation Instructions, For Field Use
A
B
Top of lift pins
Ground
For future reference add to your Technical Reference Manual
Installation and Service Instructions for Carestation 650c Pendant anesthesia machine
Read through these entire instructions before beginning the installation.
WARNING This pendant mount anesthesia machine must be installed by GE Healthcare
Authorized service personnel having experience with anesthesia machine equipment.
WARNING This device, when removed from its ceiling mount, does not meet the
stability requirements of IEC 80601-2-13 and IEC 60601-1 respectively. Special caution has to be taken.
Carestation 650c Pendant anesthesia machines (factory-configured) are designed for attachment to Draeger or TRUMPF (Kreuzer) or Maquet pendant lift interfaces.
These instructions are for mounting a Carestation 650c Pendant anesthesia machine onto a pendant lift.
WARNING Mass limit of the pendant anesthesia system is 180 kg (396 Ibs).
Tools needed
M1807013-DWG
Standard hand tools
Measuring tape
Carestation 600 Series Technical Reference Manual ( PN: 2076163-001)
Installation procedure
1. Verify that the maximum loading allowance of the pendant lift is sufficient to carry total weight of Carestation 650c anesthesia machine.
Note: Carestation 650c weight and center of gravity location are shown in APPENDIX 1.
WARNING Do not overload the pendant lift. Make sure the
maximum loading allowance of the pendant lift is verified and the result is recorded.
2. Lower the pendant lift to the bottom position. Make sure that the minimum distance from the top of the lift pins to the ground (A) is less than 550 mm (21.65 inches).
Note: If the pendant lift cannot be lowered to above required height, contact the pendant lift supplier to replace the beam (B).
WARNING Do not proceed with the installation if the pendant lift does not meet above
requirement.
Datex-Ohmeda, Inc. 3030 Ohmeda Drive PO Box 7550 Madison, WI 53707-7550, USA
This document contains confidential information or proprietary information of General Electric Company or its af­filiates. Neither the document nor the information therein is to be reproduced, distributed, used, or disclosed, either in whole or in part, except as specifically authorized in writing by a Gene ral Electric Company and must be returned upon request.
M1807013 Rev. F 01 15 Page 1 of 6
Page 2
Installation Instructions, For Field Use
C
For future reference add to your Technical Reference Manual
3. Unpack the transportation package from the pendant mount anesthesia machine.
4. If present, remove any extra load attached to the Carestation 650c top shelf and tabletop; for example, monitors, accessories, etc.
5. Loosen the screws of the two tilt blocks (located on the lower rear panel of anesthesia machine). Slide the tilt blocks to the far left and far right positions.
6. Turn the tilt adjustment screw (C) counterclockwise till the screw bolt end recedes into the hole.
Datex-Ohmeda, Inc. 3030 Ohmeda Drive PO Box 7550 Madison, WI 53707-7550, USA
This document contains confidential information or proprietary information of General Electric Company or its af­filiates. Neither the document nor the information therein is to be reproduced, distributed, used, or disclosed, either in whole or in part, except as specifically authorized in writing by a Gene ral Electric Company and must be returned upon request.
M1807013 Rev. F 01 15 Page 2 of 6
Page 3
Installation Instructions, For Field Use
E
D
For future reference add to your Technical Reference Manual
7. Move the machine to the pendant lift. Ensure the lift pins (D) align properly with machine pendant mount holes (E).
8. Turn the tilt adjustment screw clockwise till the hinge supports the anesthesia machine evenly.
WARNING This step is essential safety related, make sure it is completed and record the result.
9. Raise the pendant lift until it is fully mated with the pendant mount.
10. After mounting the machine to the ceiling pendant and all leveling adjustments have been made according to the ceiling pendant manufacturer’s procedures, adjust the two tilt blocks (F) by positioning them against each side of the
Datex-Ohmeda, Inc. 3030 Ohmeda Drive PO Box 7550 Madison, WI 53707-7550, USA
This document contains confidential information or proprietary information of General Electric Company or its af­filiates. Neither the document nor the information therein is to be reproduced, distributed, used, or disclosed, either in whole or in part, except as specifically authorized in writing by a Gene ral Electric Company and must be returned upon request.
M1807013 Rev. F 01 15 Page 3 of 6
Page 4
Installation Instructions, For Field Use
F
E
D
For future reference add to your Technical Reference Manual
lower pendant tilt bracket (the black rod). Tighten the M5 screws of the tilt blocks with torque of 3.39 ± 0.17 Nm.
Note: To prevent side tilting, it is important to install the tilt blocks before adding any accessories to the machine.
WARNING The screws must be tightened to required torque. Confirm this is completed and
record it.
11. Reinstall the parts or accessories removed in previous steps.
12. Perform the safety checkout procedures as recommended by the pendant lift manufacturer.
13. Connect the power cable and gas supplies.
14. Perform the anesthesia machine Checkout Procedure detailed in the Technical Reference Manual.
Service Instructions
In case the pendant anesthesia machine needs to be serviced, follow instructions below.
1. Lower the pendant lift till the anesthesia machine stands on its own wheels and the lift pins (D) recede out of the mounting holes (E) .
2. Move the anesthesia machine away from the pendant lift.
3. Perform service activities as described in the Carestation 600 Series Technical Reference Manual.
4. Check the tightness of below sixteen screws during service maintenance. Verify that the marks on the screws and
Datex-Ohmeda, Inc. 3030 Ohmeda Drive PO Box 7550 Madison, WI 53707-7550, USA
This document contains confidential information or proprietary information of General Electric Company or its af­filiates. Neither the document nor the information therein is to be reproduced, distributed, used, or disclosed, either in whole or in part, except as specifically authorized in writing by a Gene ral Electric Company and must be returned upon request.
M1807013 Rev. F 01 15 Page 4 of 6
Page 5
Installation Instructions, For Field Use
For future reference add to your Technical Reference Manual
the adjacent area are still aligned. Tighten the screws if loose.
NOTE: The rear upper panel and the rear lower panel need to be removed for checking the screws fixing the machine
with the mounting bracket.
5. Remount the anesthesia machine to the pendant system after service per the installation instructions.
Datex-Ohmeda, Inc. 3030 Ohmeda Drive PO Box 7550 Madison, WI 53707-7550, USA
This document contains confidential information or proprietary information of General Electric Company or its af­filiates. Neither the document nor the information therein is to be reproduced, distributed, used, or disclosed, either in whole or in part, except as specifically authorized in writing by a Gene ral Electric Company and must be returned upon request.
M1807013 Rev. F 01 15 Page 5 of 6
Page 6
APPENDIX 1

Installation Instructions, For Field Use
For future reference add to your Technical Reference Manual
Datex-Ohmeda, Inc. 3030 Ohmeda Drive PO Box 7550 Madison, WI 53707-7550, USA
This document contains confidential information or proprietary information of General Electric Company or its af­filiates. Neither the document nor the information therein is to be reproduced, distributed, used, or disclosed, either in whole or in part, except as specifically authorized in writing by a Gene ral Electric Company and must be returned upon request.
M1807013 Rev. F 01 15 Page 6 of 6