AlbeoTM LED Luminaire
Modular High & Low Bay Lighting
(ABH2-series)
Features
• 5 year warranty
• Damp location rated
BEFORE YOU BEGIN
Read these instructions completely and carefully.
Installation Guide
WARNING/AVERTISSEMENT
RISK OF ELECTRIC SHOCK
• Turn power off before inspection, installation or removal.
• Properly ground electrical enclosure.
RISK OF FIRE
• Follow all NEC and local codes.
• Use only UL or IEC approved wire for input/output connections.
Minimum size 18 AWG.
This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and
(2) this device must accept any interference received, including interference that may cause undesired operation. CAN ICES-3 (A)/NMB-3(A)
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed
to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses,
and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio
communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the
interference at his own expense.
RISQUES DE DÉCHARGES ÉLECTRIQUES
• Coupez l’alimentation avant d’’inspecter, installer ou déplacer le luminaire.
• Assurez-vous de correctement mettre à la terre le boîtier d’alimentation électrique.
RISQUES D’INCENDIE
• Respectez tous les codes NEC et codes locaux.
• N’utilisez que des ls approuvés par UL ou IEC pour les entrées/sorties de
connexion. Taille minimum 18 AWG.
Save These Instructions
Use only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer.
Prepare Electrical Wiring
Electrical Requirements
• The LED driver must be supplied with 120-480 VAC, 50/60 Hz per product label and connected to an individual
properly grounded branch circuit, protected by a 15 or 20 ampere circuit breaker.
Grounding Instructions
• The grounding and bonding of the overall system shall be done in accordance with National Electric Code
(NEC) Article 600 and local codes.
imagination at work
Unit Installation
Carefully unpack unit and properly inspect for defects before installing. Wear work gloves to prevent dirt and oil from being
1
transferred to the luminaire.
Choose a mounting method: chain or cable, rod mount, or pendant mount . (Chain or cable is covered here. Other options are
2
covered in the section Optional Mounting Methods).
Fixture Weight
ABH2-series
LED Modules
1 13 17
2 17 21
3 31 40
4 36 43
6 58 70
Chain or Cable Mounting: Please
3
follow all UL, NEC and minimum load
rating guidelines when selecting and
installing a cable or chain.
NOTE: When selecting chain, a
joint in a circular chain link shall
be welded. A joint in a chain link of
another shape shall not be located
within 30 degrees of the vertical
unless welded.
Max. Weight (lbs.)
120/277V 347/480V
Direct Mounting: Hang two chains/
4 5
cables from a structural member
of the ceiling. Fixture must be
supported independently of an
outlet box. Tighten adjustment
screws on all four mounting inserts,
then attach chain or cable to
mounting inserts on both ends of
xture.
Electrical Connections (120/277V)
Attach to
structural member
Mounting
inserts
Tighten screws
Attach to
structural member
Indirect Mounting for Uplighting:
Hang two chains/cables from a
structural member of the ceiling.
Fixture must be supported
independently of an outlet box.
Attach chain or cable to eye bolt
mounts on both ends of xture.
Loosen screws to remove endcap.
1
A) Conduit
Option: power input from side – Remove knockout in
3 4
endcap and A) Install 1/2” conduit, or B) install AC power
cord with strain relief. Plug unused hole on top with
appropriate tting.
B) Power cord
A) Conduit
Option: power input from top – A) Install 1/2” conduit, or
2
B) install AC power cord with strain relief.
Connect the green (ground), black (line) and white
(neutral) wires of the AC line to the similarly colored
wires of the xture’s power supply using UL listed
wire connectors. Re-attach endcap.
B) Power cord