Gazebo W1608MR-12, W1608MR-3 User Manual

1
APPROX.
W1608MR-12 SAND
W1608MR-32 SLATE
ASSEMBLY INSTRUCTIONS
8 X 16 SOLARIUM
DO NOT DESTROY THE BOXES UNTIL COMPLETELY ASSEMBLED
PLEASE VERIFY THE CONTENT OF EACH BOX AGAINST THE LIST OF PARTS
ZZZ-187.W1608MR.0529-20.GP.EN.doc WEB VERSION
Assembly by two or three adults is suggested.
Requires 96” clearance at the wall
Base Dimensions 190’’x 94 1/2’’,
Largest Dimensions 190’’x98 1/2’’
(see pg.19)
2
TOOLS REQUIRED:
Screwdriver (Philips #2) Knife File (smooth) Needle-nosed pliers Rubber mallet Step ladder (minmum 6' in height) Spatula Power drill Tube of silicon Drill bit 5/16" cement
(according to surface)
Round file + flat 2”x4”x8” wood
BEFORE STARTING:
Ensure that you have a solid base, such as concrete or wooden deck, not slanted more than 1” per 8’. Avoid installing unit adjacent to trees or a sloped roof, as snow and ice may slide onto the solarium and cause it to collapse. Please don't destroy boxes until completely assembled.
STEP #1
Decide the position of the door frames before assembly according to where you intend to slide the door. At the front of the solarium, use frame D3 for the opening of the door and B3 for the direction of the door when open. Use E3 between frame ends and use two (2) K3 joints for corners. Look for the sticker that will show you which side is up. (See sketch on page 14)
NOTE:
When sliding the connectors, shake the frame so that they will slide easily. Do not use tools to force. If needed, clean the paint with a file and make sure the ends of the frame and joints are not bent or warped. If so, use the needle-nosed pliers to straighten.
STEP #2
Slide the vertical guides Vv-3 left and Ww-3 right into the 2 ends of the frames along the grooves, shaking while sliding for easier movement.
ZZZ-187.W1608MR.0529-20.GP.EN.doc WEB VERSION
3
ASSEMBLE PIECES
NOTE:
Once the wall track is in place, apply silicon along the top of the wall track and at the joint of the two tracks.
Silicon is not supplied.
STEP #3
Assemble ML-3, O-3, N-3, and MR-3 as shown and position evenly above vertical guides, at 96’’ from the ground. Secure wall track and vertical tracks to brick or cement wall by drilling through the aluminum and using screws Xx-3. Insert the 2 horizontal guides, I3 & J3 at the top of the frame. Make sure the 2 frames are at the correct level, if not, use shims to compensate. Do not use tools to force.
BEFORE SCREWING THEM TO THE WALL
STEP #4
Set polycarbonate exposed side on the outside over horizontal left guide I-3, use one (1) Rr-3 panel, one (1) P-3 joint and one (1) Ss-3 panel, then do the right side with one (1) Tt-3 panel, one (1) Q-3 joint and one (1) Uu-3 panel over the J-3 horizontal guide. Secure P-3 and Q-3 to I-3 and J-3 respectively with self-tapping screws (PQ-3).
ZZZ-187.W1608MR.0529-20.GP.EN.doc WEB VERSION
4
STEP #6
Set G rafters over the bracket with Bb-3 screws at the top and two (2) Z-3 screws over the preset brackets on the rafters. Set G rafter on each joint and use Z-3 screws manually. Do not use power drill to screw Z-3.
STEP #5
Set left rafter F over last bracket then secure it with Bb-3 screw and continue screwing through joint K-3 with the Bb-3 screw. Secure to Q-3 bracket with self-tapping screw (PQ-3). Repeat on right side with rafter F1.
STEP #6
Set G rafters over the bracket with Bb-3 screws at the top and two (2) Z-3 screws over the preset brackets on the rafters. Set G rafter on each joint and use Z-3 screws manually. Do not use power drill to screw Z-3.
STEP #6
Set G rafters over the bracket with Bb-3 screws at the top and two (2) Z-3 screws over the preset brackets on the rafters. Set G rafter on each joint and use Z-3 screws manually. Do not use power drill to screw Z-3.
ZZZ-187.W1608MR.0529-20.GP.EN.doc WEB VERSION
5
STEP #7
DOOR UNIT(S) MUST BE ASSEMBLED INSIDE OF SOLARIUM.
Slide upper door track F-3 into wheels of sliding door C-3. Slide lower door track G-3 and make sure inserts are close enough to the frame to attach. Use bolt Bb-3 to affix the plastic stopper H-3 on each end of top door rail F-3. Use Oo-3 screws to affix upper door rail and cap Nn, at each end of top rail door.
ZZZ-187.W1608MR.0529-20.GP.EN.doc WEB VERSION
6
STEP #8
STEP #9
Install crossbeams (L1, L2) under rafters (F, F1, G). Use Cc-3 screws + Hh-3 nuts for the splice, then secure to the rafter with Cc-3 screws. Make sure it’s tight.
Ww
Lift up door and track inside of solarium then set it over the door opening by screwing at the top. First use bolts (Ww) and washers (Gg-3) on the inside and female bolts (Cc-3-2) on the outside for the top assembly. See diagram below. Attach lower track with bolts (Cc-3) and washers (Gg-3). Set up door latch on the side required for your door to lock, adjust latch as required.
ZZZ-187.W1608MR.0529-20.GP.EN.doc WEB VERSION
Loading...
+ 14 hidden pages