TopKAT™ PLUS configuration for mechanical pumps requires adding an external Bypass Switch (M09680B048) to the existing circuit breaker panel (a switch per dispenser). This must be used in case of system malfunction to enable refueling. The switch is connected to the Line (high voltage cable) and Controller (low voltage wires) to provide indication on bypass state.
This document provides instructions to install the TopKAT PLUS Bypass Switch.

Table of Contents

Topic Page
Introduction Terminal Block - Pin-out Connections for Mechanica Manual Override Feature Issues, Observation, and Suggestions
MDE-5073
TopKAT™ PLUS Bypass Switch Installation Instructions
March 2013
1
l Pump
s
2 5 6

Related Documents

Document Number Title GOLD Library
MDE-5013 TopKAT PLUS Installation Manual Gasboy

Parts List

Item Description Part Number Quantity
1 Bypass Switch M09680B048 1
Figure 1: Bypass Switch
®
Series 1000/Fleetkey & Topkat
MDE-5073 TopKAT™ PLUS Bypass Switch Installation Instructions · March 2013 Page 1

Terminal Block - Pin-out Connections for Mechanical Pumps

Terminal Block - Pin-out Connections for Mechanical Pumps
Following table lists the TopKAT PLUS terminal block connections for mechanical pumps.
TopKAT PLUS Terminal Block Mechanical Pump – Connections Definition
Terminal No. Signal Name F
1 LINE_IN_(115/230V) Line Connection, TopKAT PLUS power input 2 NEUTRAL_IN_(115/230V) Neutral Connection, TopKAT PLUS power input 3 GROUND_IN_(115/230V) Ground Connection, TopKAT PLUS power input 4 LINE_1 Pump control 220/110 VAC input - Nozzle 1 5 LOAD_1 Pump control output - Nozzle 1 6 LINE_2 Pump control 220/110 VAC input - Nozzle 2 7 LOAD_2 Pump control output - Nozzle 2 8 IN_USE_1_ A(AC) Handle Up - In-use signal input - Nozzle 1 9 IN_USE_1_ B(RETURN) Handle Up - AC In-use signal return - Nozzle 1 10 IN_USE_2_ A(AC) Handle Up - In-use signal input - Nozzle 2 11 IN_USE_2_ B(RETURN) Handle Up - AC In-use signal return - Nozzle 2 12 -DC OUT FOR BY-PASS_2 Connection to external Bypass Nozzle 2 13 BY- PASS_2_IN Connection to external Bypass Nozzle 2 14 PULSER_1 Pulser Input - Nozzle 1 15 PULSER_2 Pulser Input - Nozzle 2 16 +12V_2_P +12 VDC Output to Pulser - Nozzle 2 17 -DC OUT FOR BY-PASS_1 Connection to external Bypass Nozzle 1 18 BY-PASS_1_IN Connection to external Bypass Nozzle 1 19 GND_1_P Nozzle Grounding - Nozzle 1 20 GND_2_P Nozzle Grounding - Nozzle 2 21 +12V_1_P +12 VDC Output to Pulser - Nozzle 1
unctional Description
Page 2 MDE-5073 TopKAT™ PLUS Bypass Switch Installation Instructions · March 2013
Figure 2: Single Mechanical Pump
Terminal Block - Pin-out Connections for Mechanical Pumps
MDE-5073 TopKAT™ PLUS Bypass Switch Installation Instructions · March 2013 Page 3
Terminal Block - Pin-out Connections for Mechanical Pumps
Figure 3: Twin Mechanical Pump
Page 4 MDE-5073 TopKAT™ PLUS Bypass Switch Installation Instructions · March 2013

Manual Override Feature

The Bypass Switch is also connected to the MPI-C (low voltage DC), that triggers the proper LED on the board and lets the system know that the pump was put in bypass and also triggers the proper alarm in the controller.
Event Viewer will show an event of pump switched to bypass (with relevant pump number). Control Also, device status will show the relevant pump disconnected.

Manual Override Test - Optional

On completion of the system wiring, the pumps and/or dispensers must be tested to verify if the AC wiring is correct. Following steps indicate the proper procedure for testing and the expecting results. If any of these tests fail, the wiring must be corrected and the test must be performed again.
1 Place all the override switches in OFF position.
ler will show yellow triangle over the pump and communication error will be created.
Manual Override Feature
2 Turn on the breakers for all the pumps/dispensers and system.
3 Locate the override switch(s) and place the override switch for hose 1 in the Manual (up)
position.
4 Turn on hose 1. After completing reset, the hose must be able to dispense the product.
5 Turn on all other hoses. No other hoses besides 1 must activate.
6 Turn off all hoses.
7 Place the override switch for hose 1 in OFF position.
8 Repeat steps 3 to 7 for all remaining hoses.
MDE-5073 TopKAT™ PLUS Bypass Switch Installation Instructions · March 2013 Page 5

Issues, Observation, and Suggestions

Issues, Observation, and Suggestions
Following observation and suggestions have been made from reviewing the documentation
and field installation drawings from Orpak TopKAT PLUS mechanical system.
Issues Observation Suggestions
Override/Bypass Switch is recommended and shown to be located in panel.
The double pole switch contains hig pole and low DC voltage switch on the other pole.
the circuit breaker/sub
AC voltage switch on one
h
Due to location and distance of the circuit
reaker panel, and the requirement to run
b the AC and DC in two separate conduits.
It is not suggested or recommended to
ave low vol
h voltage AC of the circuit breaker panel which may/will place noise on the low voltage line that may/will effect the operation of the bypass feature not to function properly.
tage DC around or near high
for the optional Manual Override feature for the
• Place the Bypass Switch in a secured l
osion/weather proof enclosure on or
exp near the TopKAT PLUS or fuel island following the National Electrical Code (NEC) regulations, 18-inch off the ground and 18-inch from a pump. Two conduits must run to the enclosure.
• For kiosk located on or near the fuel
island, suggested applications can installed and located in the pedestal, above the 18-inch barrier plate of the TopKAT PLUS.
be
Gasboy® is a registered trademark of Gasboy International. Orpak™ is a trademark of Orpak Systems Ltd. TopKAT™ is a trademark of Gasboy International.
© 2013 GASBOY 7300 West Friendly Avenue · Post Office Box 22087 Greensboro, North Carolina 27420 Phone 1-800-444-5529 · http://www.gasboy.com · Printed in the U.S.A. MDE-5073 TopKAT™ PLUS Bypass Switch Installation Instructions · March 2013
Loading...