Gardman Greenhouse Base User Manual

Greenhouse Base Assembly Instructions
Greenhouse Base Assembly Instructions
Parts List
Important.
Please read the instructions completely before starting assembly.
Greenhouse Sizes
Profile 4 x 6 6 x 6 8 x 6 Description Length (mm) Code
2 Base Frame Sections 2542 H1-8
242Base Frame Sections 1920 H1-6
2 Base Frame Sections 1298 H1-4
444Corner Joints H2
81214
Frame to base hook clips
H3
16 16 16 Bolts M610
16 16 16 Nuts M6-1
14 16 18 Ground Pegs H4
Introduction
• Construct and secure the base before assembling the greenhouse.
• The base must stand on a firm level surface.
• If mounted on earth, ensure the soil is well compacted and level. Secure the base using the ground pegs provided: these need to be set into pockets of concrete.
• The base can be mounted on slabs provided they are level and are firmly laid.
• A concrete pad can also be used: ensure that it slopes off to the sides to prevent water ingress around the edges.
Tools and equipment required:
• 10mm spanner.
• Spirit level.
• Tape measure.
• Cement and ballast for the fixing pockets.
• Drill, masonry bits, screws and plugs if securing to slabs or a concrete pad.
Section 1
Assembly:
• Bolt the corner joints (H2) to the frames as shown. Fig A.
• Lay the base in position and check with a spirit level that it is level all round, adjusting as necessary.
• Check that the base is square before securing to the ground. This is easily done by measuring the diagonals: these will be the same length when the base is square.
Section 2
Securing the base on soil:
• Dig holes for concrete pockets. These should be deeper than the length of the ground pegs and need to be positioned at each corner and also adjacent to each greenhouse upright.
• Apply 2 pegs at the corners and one peg elsewhere next to an upright. Ensure
the pegs are inserted at an angle, as shown. Fig B.
Section 3
Securing the base on concrete or slabs:
• Drill through the base frame as illustrated. Fig C.
• Drill and plug the concrete or slab, ensuring that the hole is made far enough away from the edge to prevent splitting.
Section 4
Mounting the greenhouse:
• Wait until all concrete is fully set before mounting the greenhouse on the base.
• Apply the clips (H3) to the sides, including the corners, and at the ends.
• Undo the nuts at the bottom of the greenhouse corners & vertical glazing bars. Hook clips under base rim and over the bolts before re-attaching and tightening the nuts.
• Check that the greenhouse is firmly secured and all nuts are tightened.
Customer Helpline: 01406 372227
Fig A
Fig B
Fig C
H1
H3
H2
Greenhouse frame parts
Concrete pocket
Loading...