Gardman Easy Obelisk User Manual

Easy Obelisk
Assembly Instructions
07701
Components Supplied
Tools Required (not supplied)
Phillips cross-head screwdriver
Mallet
Before You Start
•Layout all of the component parts and make sure you have all of the parts listed.
• When you are ready to start, make sure that you have the right tools to hand, plenty of space and a clean dry area for assembly. Always try to assemble the product as close as possible to the intended location.
•Remove all plastic bags and dispose of safely.
•Retain the instructions for future use.
Caution
This pack contains small items which should be kept away from children.
Ref Description Illustration Qty
ATop curved 3
tubes
B Central leg 3
tubes
CLower leg 3
tubes
DRings 3
EFinial 1
F Assembly 15
screws
GFinial retaining 1
screw
Consumer Helpline
If you have any problems or queries with this product then please contact our helpline number: 01406 372227, or write to: Gardman Ltd. High Street, Moulton, Spalding, Lincs, PE12 6QD. Fax: +44 (0) 1406 372233.
1. Assemble the three sides as shown (A, B and C).
2. Fit the finial (E) with the retaining screw (G).
3. Attach the three rings (D) with the assembly screws (F).
4. Place assembled obelisk in desired location. If the ground is soft the obelisk can be pushed into the ground. Where the ground is particularly hard fitting can be aided by either watering the ground or pushing a suitable rod or spike in first. A depth of approximately
0.30m (1') is recommended.
Helpful hints:
You may find it easier to assemble your obelisk horizontally on its side and then carefully stand it upright to install.
If the screw holes on the poles are covered with a thin layer of the protective coating, carefully remove this by pushing a small nail through the coating.
Assembly
0.33m
(1'1")
1.63m
(5'4")
0.30m
(1')
All sizes approx.
BELOW GROUND
HEIGHT ABOVE
GROUND
WIDTH
TOTAL HEIGHT BEFORE FITTING:
1.93m
(
6
'
4
")
A
B
C
E
D
G
E
Loading...