![](/html/c2/c272/c272ae162da449d8b4b4d31f04ab12d6cea42b3fba7ff94cf80544f9a9c1eaac/bg1.png)
Ref Description Illustration Qty
ATop curved 2
tubes
B Central leg 4
tubes
CLower leg 4
tubes
DRings 3
E Moisture 8
protection
sleeves
FGround hole 1
maker
G Assembly 12
screws
HFinial 1
IFinial 12
retaining
screw
Classical Garden Obelisk
Assembly Instructions
07705
Components Supplied
Tools Required (not supplied)
Phillips cross-head screwdriver
Mallet
Tape Measure
Before You Start
•Layout all of the component parts and
make sure you have all of the parts listed.
• When you are ready to start, make sure
that you have the right tools to hand,
plenty of space and a clean dry area for
assembly. Always try to assemble the
product as close as possible to the
intended location.
•Remove all plastic bags and dispose of
safely.
•Retain the instructions for future use.
Caution
This pack contains small items which should
be kept away from children.
Consumer Helpline
If you have any problems or queries with
this product then please contact our
helpline number: 01406 372227,
or write to: Gardman Ltd. High Street,
Moulton, Spalding, Lincs, PE12 6QD.
Fax: +44 (0) 1406 372233.
![](/html/c2/c272/c272ae162da449d8b4b4d31f04ab12d6cea42b3fba7ff94cf80544f9a9c1eaac/bg2.png)
1. Fit the two curved top tubes (A) to the
four central leg tubes (B) with the
moisture protection sleeves (E). Slide the
moisture protection sleeves half way onto
the joints of the curved top tubes before
pushing the central leg tubes into the
sleeves and joints.
2. Connect three rings (D) to the completed
top section using assembly screws (G).
Place finial (H) on top of the assembly,
insert finial retaining screw (I) through
the top of the flattened top tubes and
into the base of the finial. Tighten screw.
You will now have a completed top
assembly including finial and ring.
3. Connect the four remaining lower leg
tubes (C) to the completed top assembly.
Slide the moisture protection sleeves half
way onto the joints of the central leg
tubes before pushing the lower leg tubes
into the sleeves and joints.
4. Place assembled obelisk in desired
location and mark the leg positions on
the ground. Remove obelisk and drive
ground hole maker (E) to a recommended
depth of approximately 0.45m (1' 6").
Insert legs into holes and firm earth
around to secure.
Helpful hints:
You may find it easier to assemble your
obelisk horizontally on its side and then
carefully stand it upright to install.
Before assembling the obelisk, use one of
the plastic rings as a template to mark
out the 4 leg positions in the desired
location. This will aid fitting.
Soaking the moisture protection sleeves
in warm water for a few minutes prior to
fitting will make them more malleable
and will aid fitting.
Assembly
E
0.45m
Joint
H
A
B
C
D
F
I
Moisture
Protection
Sleeve
0.4m
(1'3")
2m
(6'6")
0.45m
(1'6")
All sizes approx.
BELOW GROUND
HEIGHT ABOVE
GROUND
WIDTH
TOTAL HEIGHT BEFORE FITTING: 2.45m
(8')