Functional Devices, Inc. PSC100AB10, PSB100AB10, PSC40AB10, PSB40AB10 Installation Instructions Manual

Functional Devices, Inc. • p: 800.888.5538 • f: 765.883.7505 • www.functionaldevices.com • sales@functionaldevices.com
PSB / PSC Series Installation Instructions
Application
These general-purpose power supplies can be used to fulll all the 120 Vac and 24 Vac* (Class 2) power require­ments needed inside a building automation (BAS) panel, industrial enclosure, or other general purpose electrical
120 Vac Convenience Outlet*
Neutral Ground
4.610˝
4 Mounting Screw Holes Hole diameter .203"
120 Vac
ON
RESET
OFF
OFF
Com
24 Vac
24 Vac ON/OFF
10 Amp Main Breaker/Switch
4.500˝
120 Vac Aux. Output
Removable Access Plate
LED Indicator
enclosure, in addition to on/o control, equipment over­current protection, power indication, high/low voltage separation, and convenience receptacles. They are also useful for many applications outside of BAS.
5.620˝
2.245˝
6.250˝
4.500˝
5.620˝
Bulletin B1450
3.900˝
To remove cover
PSB / PSC Series Selection Guide
Model Number * VA Rating
PSC100AB10 100 VA 10 Amp Switch / Breaker Terminal Strip
PSB100AB10 100 VA 10 Amp Switch / Breaker Terminal Strip
PSC40AB10 40 VA 10 Amp Switch / Breaker Terminal Strip
PSB40AB10 40 VA 10 Amp Switch / Breaker Terminal Strip
* All models may be followed by –IC.
Panel
Mount
Enclosed
120 Vac
Receptacles
Aux Output
Main Breaker on
Input Power
Secondary
Conguration
Installation
When installing this product...
1. Read these instructions carefully. Failure to follow them could damage the product or cause a hazardous condition.
2. Check the product ratings and ensure that the product is suitable for your application.
3. Installer must be a trained, experienced service technician.
4. After installation is complete, perform a voltage check as provided in these instructions.
CAUTION
RISK OF ELECTRICAL SHOCK  MORE THAN ONE DISCONNECT MAY BE REQUIRED TO DEENERGIZE THE DEVICE BEFORE SERVICING.
CAUTION
REMOVAL OF COVER OR ACCESS PLATE IF PRESENT EXPOSES HIGH VOLTAGE.
Mounting
1. Remove the entire front cover (PSC versions) by extracting 2 screws on top front.
2. Attach uncovered power supply using 4 screw holes.
3. Make desired wire connections.
4. Reattach cover for PSC versions.
Wiring
All wiring must comply with local codes and ordinances. Disconnect power before making wiring connections to prevent
electrical shock or equipment damage.
TRANSFORMER:
24Vac, 100VA, Class 2
Note
Convenience Outlets & Aux. Load:
120Vac, Total Load not to exceed 9A *
Move internal jumper to “ALWAYS HOT” position if you wish outlets
to always be hot otherwise outlets will be switched by main breaker.
24Vac for Output Only
ON OFF
120Vac
10A Main
24Vac
Breaker
RESET
RESET
OFF
Class 2, 12-18 AWG, 10 lb./in max, copper 60ºC
Hot Neut
Gnd AUX
120V INPUT
24 Vac LED Indicator
Class 2, 12-18 AWG, 10 lb./in max, copper 60ºC
COM 24 VAC
OUTPUT
See Note
1. Bring wiring into 1 of the 2 openings on the side of the power supply while cover is removed (PSC version).
2. Make appropriate connections to the terminal strips.
Note: All eld wire leads are intended for installation inside the enclosure.
Voltage Check
After installation is complete, turn on power supply and perform a voltage check:
1. Place controlled equipment in operation and observe through one complete cycle.
2. Using a voltmeter, check for proper primary and secondary voltages.
3. If voltage readings are incorrect, be sure primary voltage connections are made correctly.
4. Measure voltage again:
a. If correct primary voltage is measured and secondary voltage is signicantly less than the voltage shown on the
regulation curves, transformer winding is damaged. Replace transformer and repeat checkout procedures.
b. If primary voltage is 0V, be sure power supply is connected correctly or repair, if necessary. Repeat checkout
procedures.
393170C 07.18.17
Loading...