FOR SAFE OPERATION

Handling of This Manual
This manual contains important information regarding the use and handling of this
product. Read this manual thoroughly. Use the product according to the instructions
and information available in this manual. Keep this manual in hand for further
understanding.
Fujitsu makes every effort to prevent users and bystanders from being injured or from
suffering from damages to their property. Use the product according to this manual.

ABOUT THIS PRODUCT

This Product is designed, developed and manufactured as contemplated for general
use, including without limitation, general office use, personal use and household use,
but is not designed, developed and manufactured as contemplated for use
accompanying fatal risks or dangers that, unless extremely high safety is secured,
could lead directly to death, personal injury, severe physical damage or other loss
(hereinafter "High Safety Required Use"), including without limitation, nuclear
power core control, airplane control, air traffic control, mass transport operation
control, life support, weapon launching control. You shall not use this Product without
securing the sufficient safety required for the High Safety Required Use. If you wish
to use this Product for High Safety Required Use, please consult with sales
representatives in charge before such use.

RADIO FREQUENCY INTERFERENCE STATEMENT

The following notice is for EU users only.
WARNING: This is a product which meets Class A of EN55022. In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures.
The following notice is for USA users only.
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.
Page 4

TRADEMARKS ACKNOWLEDGEMENTS

UNIX is a registered trademark of The Open Group in the United States and other
countries.
The contents of this manual shall not be disclosed in any way or reproduced in any
media without the express written permission of Fujitsu Limited.
All Rights Reserved, Copyright FUJITSU LIMITED 2002-2014, 2016
C120-H007-08EN
Page 5

Revision History

(1/1)
Edition Date
Revised section
(Added/Deleted/Altered)
Details
01 2002-10-31 
02 2005-09-15 Entire manual (Altered)
• Technical brush-up
• Modification of the manual title
• Addition of PRIMEQUEST
Section 3.3.2
(Altered/Added)
• Modification of the concept of units operational grouping
• Addition of description for concentration of small equipment
Section 5.2.2 (Added)
• Addition of conditions for using mobile phones
03 2008-04-16 Entire manual (Altered) • Modification of manual title
• Addition of description for SPARC Enterprise
• Deletion of description for PRIMEPOWER
04 2009-12-15 Section 4.3.5 (Altered) • Modification of tolerable limit of
Hydrogen sulfide gas
05 2011-11-25 Entire manual (Altered)
• Technical brush-up
Section 2.2.1
(Altered)
• Modification of the value for vibrations during earthquakes
Section 4.3.5 (Altered)
Section 4.3.6 (Added)
• Modification of Table4.4
• Addition of the seawater (salt damage)
• Modification of the value for withstanding a horizontal seismic intensity
Section 8.2.2 (Added)
• Addition of consulting department of an earthquake preparedness
Reader's Comment Form (Altered)
• Modification of the address for sending back of the form
06 2012-11-15 Entire manual (Altered) • Modification of manual title
• Addition of description for Fujitsu M10/ SPARC M10 Systems
Page 6
Edition Date
07 2014-03-25 Section 6.1.1 (Altered) • Modification of Table6.1
08 2016-05-17 Entire manual (Altered) • Modification of the name of the target
Revised section
(Added/Deleted/Altered)
Details
equipment from "SPARC M10 systems" to "SPARC Servers"
Note: In this table, devised section is indicated by its section number in the
current edition.
An asterisk (*) indicates a section in the old edition.
C120-H007-08EN
Page 7

Preface

1
This manual describes the requirements and concepts of installation and facility
planning that pertain to the setup of Fujitsu M10/SPARC Servers, SPARC Enterprise
and PRIMEQUEST. Installation and facility planning requires full review with
Fujitsu representatives in charge according to the instructions presented herein.
This manual is intended for site planners preparing for the server system installation.
Use this manual to review server system installation plans or to run and administer the
server system. The reader is assumed to have some knowledge or experience in the
server system installation planning.
SPARC Servers include the SPARC M10 and SPARC T7/M7/T5.

Contents and Organization of This Manual

This manual consists of 8 chapters, one appendix, one acronyms and abbreviations
section, and one index as below:
The manual contains general information and precautions required for the server
system installation plans. For information about specific Fujitsu M10/SPARC
Servers, SPARC Enterprise models and PRIMEQUEST models, refer to the
respective Installation Planning Manual.
CHAPTER 1 Installation Planning Overview
This chapter describes general requirements for the server system installation
planning and for the facilities used to house the server systems.
CHAPTER 2 Installation Sites
This chapter describes the recommended sites and structures and the buildings in
which the server systems can be installed, and the structures of the computer rooms.
CHAPTER 3 Equipment Layout
This chapter describes the procedures and precautions to take in laying out the server
system equipment.
CHAPTER 4 Air Conditioning
This chapter describes the available computer room air conditioning methods, along
with their features, conditions of air conditioning, and precautions.
C120-H007-08EN i
Page 8
Preface
CHAPTER 5 Electromagnetic Environment and Static Electricity
This chapter describes the electromagnetic environmental conditions relevant to
server systems, and electrostatic effects.
CHAPTER 6 Power Supply Facilities
This chapter describes the power supply requirements, power supply facilities,
grounding plans, power distribution boards, and power distribution routes for the
server systems.
CHAPTER 7 Protection Against Lightning
This chapter describes the safeguards necessary to protect server systems against
destructive lightning surge voltages.
CHAPTER 8 Security Actions
This chapter describes the actions necessary to ensure server system security.
Appendix A Conversion Information
This appendix provides quick reference tables for measure units conversion and
fractional decimal equivalent conversions.
Acronyms & Abbreviations
This acronyms and abbreviations provides complete word(s) of acronyms and
abbreviations used in this manual.
Index
This index provides the keywords, along with the reference page numbers so that
users can find the necessary information at a glance.
ii C120-H007-08EN
Page 9
Preface

Other Reference Manuals

When installing the SPARC Enterprise or PRIMEQUEST, read the installation guide
for each model first.
For the readers
• If you find any inconvenience with the description or incorrect explanation in this manual, please fill in the "Comment Form" sheet at the back of this manual and forward it to the address described on the sheet.
• This manual is subject to be revised without prior notice.
C120-H007-08EN iii
Page 10
Page 11

Contents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i
CHAPTER 1 Installation Planning Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 Office Installation and Computer Room Installation . . . . . . . . . . . . . . . . . . . 1
1.1.1 Office installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1.2 Computer room installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.2 Computer Room Installation Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2.1 Device support planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2.2 Support staff assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3 Preparing Building and Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.3.1 Building and facilities needed to install a server system . . . . . . . . . . 4
1.3.2 Furnishings accompanying a server system . . . . . . . . . . . . . . . . . . . 4
1.3.3 Rooms needed to run the server system . . . . . . . . . . . . . . . . . . . . . . 5
1.4 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
CHAPTER 2 Installation Sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.1 Building Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.1.1 Sites convenient for systems development and administration . . . . . 7
2.1.2 Utility services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.1.3 Secure sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.2 Buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.2.1 Building structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2.2.2 Computer room location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
2.2.3 Spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
2.2.4 Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2.2.5 Access routes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
2.2.6 Water and fuel stocks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.3 Computer Room Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.3.1 Computer room structural requirements . . . . . . . . . . . . . . . . . . . . . . 16
2.3.2 Free-access flooring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.3.3 Interiors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
CHAPTER 3 Equipment Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
3.1 Proposed Computer Room Top View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
3.2 Equipment Templates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
3.3 Precautions in Preparation of an Equipment Layout . . . . . . . . . . . . . . . . . . . 26
C120-H007-08EN v
Page 12
Contents
3.3.1 Hardware constraints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.3.2 Operational considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.4 Air Conditioners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.1 Air conditioning units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.2 Air conditioning piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.3 Heat distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.4 Air circulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.4.5 Dusting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.5 Power Supply Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.5.1 Power supply facilities for server system . . . . . . . . . . . . . . . . . . . . . . 30
3.5.2 Power supply facilities for air conditioners . . . . . . . . . . . . . . . . . . . . . 31
3.5.3 Facility control panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.6 Line and Signal Wiring Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
3.6.1 Line facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
3.6.2 Signal wiring facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
CHAPTER 4 Air Conditioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
4.1 Characteristics of Computer Room Air Conditioning . . . . . . . . . . . . . . . . . . . 33
4.1.1 Constant temperatures and humidities . . . . . . . . . . . . . . . . . . . . . . . . 33
4.1.2 Air conditioning conditions and capacities . . . . . . . . . . . . . . . . . . . . . 34
4.1.3 Service time and reliability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
4.2 Styles of Air Conditioner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
4.2.1 Direct blowing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
4.2.2 Duct blowing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
4.2.3 Underfloor ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
4.2.4 Combined use of direct or duct blowing and underfloor ventilation . . 37
4.3 Air Conditioning Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
4.3.1 Permissible temperature and humidity ranges for server systems . . 38
4.3.2 Recommended temperatures and humidities for computer rooms . . 39
4.3.3 Temperature and humidity recommendations for computer rooms . . 40
4.3.4 Dust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
4.3.5 Corrosive gases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
4.3.6 Seawater (salt damage) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
4.4 Thermal Load and Cooling Capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
4.4.1 Thermal load imposed on air conditioner . . . . . . . . . . . . . . . . . . . . . . 45
4.4.2 Example of cooling capacity calculations for room air conditioning . . 46
4.4.3 Underfloor ventilation air conditioning . . . . . . . . . . . . . . . . . . . . . . . . . 49
4.4.4 Convenient formulas for air conditioning capacities . . . . . . . . . . . . . . 50
4.5 Precautions Pertaining to the Installation of Air Conditioners . . . . . . . . . . . . 52
4.5.1 Humidifier . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
4.5.2 Air conditioner filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
vi C120-H007-08EN
Page 13
Contents
4.5.3 Installing temperature/humidity sensors . . . . . . . . . . . . . . . . . . . . . . . 54
4.5.4 Taking in fresh air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
4.5.5 Preventing dew condensation in underfloor ventilation . . . . . . . . . . . 55
4.5.6 Preventing water leaks and installing detectors . . . . . . . . . . . . . . . . . 56
4.5.7 Installing a backup unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
4.5.8 Preventing freezing of cooling water . . . . . . . . . . . . . . . . . . . . . . . . . 57
CHAPTER 5 Electromagnetic Environment and Static Electricity. . . . . . . . . 59
5.1 Magnetic Fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
5.1.1 Allowable magnetic field intensities of displays . . . . . . . . . . . . . . . . . 59
5.1.2 Sources of magnetic fields and fault symptoms . . . . . . . . . . . . . . . . . 60
5.1.3 Magnetic field control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
5.2 Electric Fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
5.2.1 Allowable electric field intensities for server systems . . . . . . . . . . . . 62
5.2.2 Conditions for using mobile phones . . . . . . . . . . . . . . . . . . . . . . . . . . 62
5.3 Static Electricity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
5.3.1 Recommended electrostatic voltage for a computer room . . . . . . . . 63
5.3.2 Electrostatic control in the computer room . . . . . . . . . . . . . . . . . . . . . 63
CHAPTER 6 Power Supply Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
6.1 Input Power Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
6.1.1 Input power requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65
6.1.2 Calculating the power required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
6.1.3 Calculating the rush current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
6.2 Power Supply Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
6.2.1 Kinds and uses of power supply facilities . . . . . . . . . . . . . . . . . . . . . . 67
6.2.2 Selecting power supply facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
6.3 UPS Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
6.4 Grounding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
6.4.1 Grounding equipment in the computer room . . . . . . . . . . . . . . . . . . . 77
6.4.2 Grounding other equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
6.4.3 Grounding LAN devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
6.4.4 Grounding-plate method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
6.5 Distribution Panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
6.5.1 Distribution panel location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
6.5.2 Distribution panel breakers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
6.5.3 Distribution panel structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
6.6 Distribution Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
6.6.1 Induced noise control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
6.7 Share of Responsibility for Construction in a Computer Room . . . . . . . . . . . 88
6.8 Distribution Line Insulation Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
C120-H007-08EN vii
Page 14
Contents
6.8.1 Test voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
6.8.2 Phase and grounding cable insulation test . . . . . . . . . . . . . . . . . . . . . 89
6.8.3 Interphase insulation testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
CHAPTER 7 Protection Against Lightning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
7.1 Protection of AC Line . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
7.2 Protection of Signal Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
CHAPTER 8 Security Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
8.1 Basic Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
8.1.1 Levels of security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
8.1.2 Objects of security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96
8.1.3 Kinds of disasters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
8.2 Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
8.2.1 Fire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
8.2.2 Earthquakes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
8.2.3 Water damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
8.2.4 Burglary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
8.2.5 Rat damage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
8.3 Maintenance and Management of Disaster Control Facilities . . . . . . . . . . . . 106
Appendix A Conversion Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
A.1 Units of Measure Conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
A.2 Fraction to Decimal Equivalence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108
Acronyms & Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109
Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
viii C120-H007-08EN
Page 15
Contents

Figures

Figure 2.1 Slit floor panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Figure 2.2 Floor panels with an airflow control damper . . . . . . . . . . . . . . . . . . . . 21
Figure 2.3 Air flow control panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Figure 3.1 Concept of units operational grouping . . . . . . . . . . . . . . . . . . . . . . . . . 27
Figure 4.1 Direct blowing setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Figure 4.2 Duct blowing setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Figure 4.3 Underfloor ventilation setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Figure 4.4 Schematic view of a combined system . . . . . . . . . . . . . . . . . . . . . . . . . 38
Figure 4.5 Psychrometric chart applicable to changing the room temperature 41
Figure 4.6 Psychrometric chart applicable to lowering the underfloor
temperature
Figure 4.7 Typical air conditioner characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Figure 4.8 Air condition in a psychrometric chart (for a typical air conditioner) 46 Figure 4.9 Air condition in a psychrometric chart (underfloor-ventilation air) . . 49
Figure 4.10 Dike . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Figure 6.1 System based on a UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Figure 6.2 System based on a UPS and an independent power generator . . . 69
Figure 6.3 Commutating load circuit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Figure 6.4 Method of grounding equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Figure 6.5 Typical 100 Base-T connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Figure 6.6 Grounding-plate method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Figure 6.7 Distribution panel (free-standing) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Figure 6.8 Distribution panel (wall-mounted) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Figure 6.9 Round crimp terminal dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Figure 6.10 Space around output terminal boards . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Figure 6.11 Grounding connections within a distribution panel . . . . . . . . . . . . . . . 87
Figure 6.12 Share of responsibility for construction in a computer room . . . . . . 88
Figure 7.1 Surge absorber (power outlet connected type) . . . . . . . . . . . . . . . . . . 93
Figure 7.2 Install surge absorber on the distribution panel's input side . . . . . . . 93
Figure 7.3 Lighting control action when using external modem . . . . . . . . . . . . . 94
Figure 7.4 Lightning control action for LAN cables . . . . . . . . . . . . . . . . . . . . . . . . 94
Figure 8.1 Designating alarm zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
C120-H007-08EN ix
Page 16
Page 17
Contents

Tables

Table 2.1 Ceiling heights. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Table 2.2 Raised floor heights of free-access floors . . . . . . . . . . . . . . . . . . . . . . . 18
Table 2.3 Strengths and surface materials of free-access floor panels . . . . . . 19
Table 3.1 Kinds, uses, and locations of power supply facilities . . . . . . . . . . . . . 30
Table 4.1 Recommended temperatures and humidities for computer rooms . 40
Table 4.2 Temperature and humidity recommendations (changing the room
temperature)
Table 4.3 Temperature and humidity recommendations (lowering the underfloor
temperature)
Table 4.4 Tolerable limits for corrosive gases . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Table 4.5 Sources of overload and amount of heat dissipation . . . . . . . . . . . . . 45
Table 4.6 Examples of typical air conditioner cooling capacity calculations . . 47
Table 4.7 Examples of underfloor-ventilation air conditioner cooling capacity
calculations
Table 4.8 Convenient formulas for air conditioner capacity . . . . . . . . . . . . . . . . . 50
Table 5.1 Sources of magnetic fields and fault symptoms. . . . . . . . . . . . . . . . . . 60
Table 6.1 Input power requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Table 6.2 Types of available power supply facilities and usage . . . . . . . . . . . . . 67
Table 6.3 Transformers for 200 V server systems. . . . . . . . . . . . . . . . . . . . . . . . . 70
Table 6.4 Transformers dedicated to 400 V server systems . . . . . . . . . . . . . . . . 71
Table 6.5 Specification of the grounding trunk cable for server systems
(in the buildings complying to the IEC standards)
Table 6.6 Requirements for other equipment grounding facilities . . . . . . . . . . . 79
Table 6.7 Details of the separation of the LAN transmission line signal
ground (SG)
Table 6.8 Output terminal board dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Table 7.1 Specification of power control box (F9710PW2) . . . . . . . . . . . . . . . . . 92
Table 7.2 Recommended surge absorber for external modem. . . . . . . . . . . . . . 94
Table 8.1 Characteristics of fire extinguishing agents . . . . . . . . . . . . . . . . . . . . . 99
Table A.1 Units-of-measure conversion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
Table A.2 Fractions to decimal-equivalent conversion . . . . . . . . . . . . . . . . . . . . . 108
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
. . . . . . . . . . . . . . . 78
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
C120-H007-08EN xi
Page 18
Page 19

CHAPTER 1 Installation Planning Overview

1
This chapter defines the general requirements for server system installation planning
and for the facilities used to house server systems. Successful planning ensures
system installation efficiency now and in the future, assuring system reliability,
convenience, and functionality.
The users wishing to install a server system must make both the site and associated
facilities available, and also develop meticulous installation plans to ensure that all of
the facilities prerequisite to operating the server system into service are ready before
equipment are delivered to the site.

1.1 Office Installation and Computer Room Installation

Installation site of server system can be classified into two types as described below.
The decision of installation site depends on the unit size and specific conditions of
use.
Office installation
Computer room installation
The following are overview of each case:

1.1.1 Office installation

Computer equipment appropriate for office space installation is:
Compact server units
I/O devices
These equipments are more appropriate for office space installation than are
equipment that must be installed in a computer room, because they make less noise,
have lower power requirements, dissipate less heat and are operable over wider
temperature and humidity ranges. Office installation does not require free-access
floors or special electrical facilities. As a rule, the building's existing air conditioning
system can be shared.
C120-H007-08EN 1
Page 20
CHAPTER 1 Installation Planning Overview
A server system involving equipment that is too large to fit into the available office
space or a mixture of equipment having a combined heat dissipation over about 21
MJ/h (20000 Btu/h) would need to be installed in facilities meeting the computer
room installation requirements.
(1) Equipment suitable for office installation
Equipment meeting any of the following requirements is suitable for office
installation.
Equipment that operates from a power supply of single-phase, and that can be
plugged in
Equipment whose noise level is low enough to permit installation in a general
office environment
(Equipment with a height of 1 m or lower: Noise level of 47 dB (A) or less;
equipment with a height of 1 m or higher: Noise level of 50 dB (A) or less)
Equipment with permissible ranges of temperature and humidity that meet
installation requirements in a general office environment
(Indoor temperature: 5 to 35°C; indoor humidity: 20 to 80% RH (operating) or 8 to
80% RH (not operating))
(2) Air conditioning and power requirements of equipment subject to
office installation, and associated facilities
The amount of heat dissipated by equipment subject to installation in an office, the
power requirements, and the number of equipment items installed may require
improvements to the air conditioning and power supply facilities in the office in
question. In installing equipment in an office space, it is important to review
beforehand the air conditioning facilities of the office and the ratings of the power
supplies available.

1.1.2 Computer room installation

Computer equipment appropriate for computer room installation is:
A server system involving equipment that is too large to fit into the office space
A mixture of equipment having combined heat dissipation over about 21 MJ/h
(20000 Btu/h)
2 C120-H007-08EN
Page 21

1.2 Computer Room Installation Planning

1.2 Computer Room Installation Planning
Computer room installation requires prior device support planning and support staff
assignment.

1.2.1 Device support planning

Regarding the method of supporting device, the following items must be planned:
(1) Configuration of the server system and equipment to be added
Environmental specifications for each room (such as dimensions, mass, voltages,
power requirements, heat dissipation, and temperature and humidity conditions)
Scale templates for planning device layouts
Kinds, numbers, and length limitations of signal cables used to connect devices
installed between rooms
(2) Quantities of storage media to be stored
CD, DVD, MO, magnetic tapes, floppy disks, printed forms, etc.
(3) Quantities of supplies and consumables to be stored
Print forms, ink ribbons, toner, photo-conductive drums, etc.
(4) Quantities of spare parts and maintenance tools to be stored
(5) Storage space for user's manuals
(6) Staff and visitor access management scheme
(7) Policy on carrying media and supplies in and out of the computer
room

1.2.2 Support staff assignment

To proceed the installation planning smoothly, an installation planning group
comprises the appointed staff of the user organization and Fujitsu is needed to be
organized.
C120-H007-08EN 3
Page 22
CHAPTER 1 Installation Planning Overview
Regarding the required staff in the installation planning group, consider the following:
An installation planning group and a supervisor within the user organization
An installation consultant from a Fujitsu or agent

1.3 Preparing Building and Facilities

Review the building and facilities needed to install a server system, ancillary
furnishings accompanying the server system, and the rooms needed to run the server
system.

1.3.1 Building and facilities needed to install a server system

Regarding the building and facilities needed to install a server system, consider the
following:
Building
Power supplies
Air conditioning
Signal line, telecommunication facilities
Fire extinguishers, fire extinguishing facilities

1.3.2 Furnishings accompanying a server system

Review the following furnishings accompanying in use of a server system:
Cabinets and lockers
- Small equipment
- Storage media
- Supplies
- Spare parts and maintenance tools
- Instructions manuals
Warehouses
- Storage media
Trucks
4 C120-H007-08EN
Page 23

1.4 Scheduling

1.3.3 Rooms needed to run the server system

Regarding the rooms needed to run the server system, review the following:
Offices
Meeting rooms
System administrator rooms
System developer rooms
Backup maintenance engineer and other related rooms
1.4 Scheduling
In installing a server system in a computer room, the scheduling of the following
activities is recommended:
Development of an overall installation planning schedule
Facility design verification
Verification of the status of ongoing facility construction
Final preparations for installing the server system, facility and interior finish
checks, and, where appropriate, facility test runs
C120-H007-08EN 5
Page 24
Page 25

CHAPTER 2 Installation Sites

1
This chapter details the recommended sites and structures and the buildings in which
server systems can be installed, and the structures of the computer rooms.
Server systems setups can be classified into two broad forms: one in which a server
system is installed in a computer room for message collection and distribution
processing and perform calculation processing, and one in which a server system is
installed conveniently in an office for use as a stand-alone machine or as one
connected to a communications network.
This chapter presents a variety of tips and hints for determining the most appropriate
locations for server systems. The importance of the individual tips and hints, however,
depends on the intended use of the server system. Alternative or corrective actions
may be available for particular items. The server system department of the user's
organization is recommended to hold in-depth consultations on requirements for
determining a server system's location with its department in charge of construction or
with a building contractor.

2.1 Building Location

The building in which a server system is to be installed should be conveniently
located for systems development and administration, afford good access to utility
services, such as electricity, water, and telephone lines, and ensure security.

2.1.1 Sites convenient for systems development and administration

When selecting sites conveniently located for systems development and
administration, take the following factors into consideration:
Commutation of the management and employees
Communication with the related departments
Traffic to and from subcontractors
C120-H007-08EN 7
Page 26
CHAPTER 2 Installation Sites

2.1.2 Utility services

When selecting sites that afford good access to utility services, take the following
factors into consideration:
Satisfactory availability of electric power
No suspension or failure of water supplies, or the availability of alternate measures
for water supply
Access to telecommunication lines

2.1.3 Secure sites

When selecting sites that offer a high degree of security, take the following into
consideration. (Among these factors, those that threaten security will be described
later.) The adverse effects of these factors can be minimized if the structural
requirements for buildings or computer rooms are met.
Little occurrence of earthquakes, with the effects therefrom minimal
No danger of damage from flooding and snow
Little occurrence of lightning
Easy implementation of fire preventive measures
No high-level electromagnetic radiation influence
Little presence of dust and corrosive gases
Procedures in place for dealing with riots and trespassing, break-ins, etc.

2.2 Buildings

The buildings in which server systems can be installed are broadly classified into the
following forms:
Dedicated server system centers
Office rooms converted to dedicated computer rooms
General office rooms in which server systems are installed for convenience's sake
Except for the last form of installation mentioned above, server system centers and
dedicated computer rooms would best benefit from structural safety considerations,
because they are intended to house server systems handling large amounts of data.
Particularly, the more important a server system center is, the more strict safety
considerations are required.
8 C120-H007-08EN
Page 27
2.2 Buildings

2.2.1 Building structures

Structural considerations for buildings in which server systems are to be installed are
summarized below.
(1) Floor strength
The floor of the building in which a server system is to be installed should be strong
enough to withstand the combined weight of the server and its component devices. An
equipment layout superimposed with weight distributions should be presented to the
building designer or installation engineer as a means of determining whether the
server system can be installed.
a) Base floor strength of the computer room
The base floor loading strength of the computer room including the strength of the
floor itself, beams, and columns should be sufficient to accept the installation of a
server system.
• Loading strength of the floor itself
The base floor of the computer room, like the floor of a general office room, must
have a loading strength of 2.9 kN/m2 (61 lbf/ft2) or greater.
• Loading strength of beam and column
A loading strength of 2.9 kN/m2 (61 lbf/ft2) or greater is recommended for the
beams and columns that support the floor of the computer room.
Although a loading strength of 1.8 kN/m2 (38 lbf/ft2) or greater is recommended for
the beams and columns used to support the floor of a general office room, this could
restrict the equipment layout of large chained devices or heavy devices.
b) Verification by the building designer or the building constructor
Even if the base floor strength of the computer room meets the value suggested
above, the structure of the building, its secular changes, or the location of the server
system may not accept its installation. For these reasons, an equipment layout
superimposed with weight distributions should be presented to the building designer
or the building constructor as a means of determining whether the server system can
be installed.
c) Rooms used to install heavy devices
Power supply rooms and media storage rooms may require reinforcement even
when they provide a loading strength of 2.9 kN/m2 (61 lbf/ft2).
C120-H007-08EN 9
Page 28
CHAPTER 2 Installation Sites
d) Newly constructed buildings
If a server system is to be installed in a newly constructed building, it is
recommended that loading strength of the floor itself, beam, and column is 4.9 kN/
m2 (100 lbf/ft2) or greater for such computer room.
(2) Vibration and earthquake-proofing
Recent years have witnessed the emergence of earthquake-free buildings mounted on
earthquake-free foundations that absorb the effects of earthquakes and computer
rooms with earthquake-free floors as safeguards against earthquakes. Because the
higher floors in an ordinary building are more susceptible to the effects of earthquakes
than the lower floors, it is recommended that server systems be installed on lower
floors.
Regarding the floor on which the server system is to be setup, special consideration
should be given to the following:
As little vibration as possible in the steady state
Vibrations during earthquakes not exceeding 2.5m/S2 (8.2ft/S2)
If vibrations during earthquakes exceed 2.5m/S2 (8.2ft/S2), study the available
safeguards against earthquakes. The safeguards against earthquakes include
earthquake-free method, securing method, or clamping devices in position.
(3) Water damage
a) Drainage
The basement or the first floor of a building should be avoided as a site for installing
a server system because these floors can be flooded during floods. If installing a
server system on such floors is unavoidable, embankments or drainage facilities
should be provided to ensure uninterrupted functionality of the server system.
b) Structure
The building in which a server system is installed must be so structured to protect
the server system from the effects of the following:
Damage from storms and flooding
Fire fighting water
Water leaking from the roof
Water flowing from stairways
Water leaking from water facilities in the upper floor(s)
Water leaking from the water pipelines above the ceiling
10 C120-H007-08EN
Page 29
2.2 Buildings
Water leaking due to clogged drainage pipelines on the roof or in the upper floor(s)
c) Preventing water leakage from air conditioning facilities
Because air conditioning facilities commonly involve the use of water, as in coolant
pipelines, humidifying feed water, and water generated as a result of dehumidifying,
they would require measures to prevent water leakage. These measures include:
Embankments surrounding air conditioning facilities and detection of water
leakage inside the embankments
Detection of water leakage from water pipes
(4) Fires
a) Fireproofing
Buildings should be made fireproof.
b) Buffer zones
Buffer zones should be provided to avoid the effects of fires in the neighborhood.
c) Effects of fires in the neighborhood
Regarding the effects of smoke and heat caused by fires in the neighborhood,
following circumstances must be reviewed:
From the standpoint of security, computer rooms and media storage rooms should
be windowless or have double walls to provide protection from fire, etc.
The air intake duct in the computer room should be capable of being cut off
immediately during outbreaks of fires.
(5) Disasters caused by human neglect
Things to consider with regard to disasters caused by human neglect are summarized
below:
Markings that clearly point to the presence of a server system should be avoided.
Such signboards would include those attached to a building.
Computer rooms should be at locations where access can be limited to only
authorized personnel.
Areas surrounding buildings housing server systems should be guarded by
patrolling, for example.
Rooftop facilities and ground facilities on the premises visible from outside the
premises should be removed from view with screens or fences.
Computer rooms should also not be visible externally.
C120-H007-08EN 11
Page 30
CHAPTER 2 Installation Sites

2.2.2 Computer room location

Things to consider with regard to location of the computer room are summarized
below.
(1) Operability
The computer room should be conveniently located for access to communication with
related departments and for data receipt, issue, and relocation.
(2) Security
From a security standpoint, the computer room should be located on the lower middle
floor of a building, rather than the top floor or a basement. The first floor facing the
street should also be avoided. In addition, the top floor is not suitable since top floor
would be influenced by the effects of heat from the rooftop and ambient-air
temperatures.
(3) Sunshine requirements
Computer rooms do not have any special sunshine requirements because they
typically house a limited staff of operators and a large set of devices.
(4) Power supply
Computer rooms installed in buildings should be so located to afford access to the
required power source.
(5) Air conditioning
Computer rooms installed in buildings should be so located to afford access to air
conditioning.

2.2.3 Spaces

Regarding the spaces pertaining to buildings in which server systems are to be
installed, the following items, among others, should be considered:
The space in which the server system is to be installed
The space through which the server system will be moved
The space where additional peripheral equipment or other server systems will be
installed
12 C120-H007-08EN
Page 31
2.2 Buildings
The space used for signal and telecommunication lines in the building
Recording media storage room
Office room needed for systems administration and development
Storage rooms for supplies and spare parts
Access control room

2.2.4 Facilities

Considerations pertaining to facilities are summarized below:
(1) Power supply facilities
The power supply facilities should distribute enough power to meet the requirements
of the server systems and associated facilities. A dedicated transformer or
uninterruptible power supply is required as a power supply facility for the server
systems.
When the computer room is selected, the route of the main power cable to the
computer room must be determined, and a power distribution board and grounding
cable facilities must be prepared.
(2) Air conditioning facilities
a) Types of air conditioning facilities
Review the use of following air conditioning facilities as dedicated air conditioning
facilities for computer rooms, for within power supply rooms, or for neighboring air
conditioning rooms:
Packaged air conditioner
Air-handling unit
Regarding air conditioning for other locations, review the following facilities:
Cooling tower
Outdoor unit
Chiller
Following the selection of the computer room, determining the location of the air
conditioning facilities and routing of the pipeline will be required:
C120-H007-08EN 13
Page 32
CHAPTER 2 Installation Sites
b) Purpose of air conditioning
In a computer room, there are many heat sources such as dissipation from server
systems, heat from surrounding circumstances, and heat generated by lighting and
operators' bodies that increase instability of air conditions in the room. Air
conditioners are required in order to improve stability of air conditions in the room.
c) Precautions
Regarding the selection of air conditioning facilities, the following items require
consideration:
Air conditioning facilities needed to keep the server system running successfully
For water-cooled air conditioners, the location of the cooling tower and coolant
piping to the air conditioner
For air-cooled air conditioners, the location of the air-cooled outdoor unit and
refrigerant piping to the air conditioner
Cooling water capacity to provide year-round cooling, for cases where only chilled
water is available for cooling the building, and no locations are available for
installing a cooling tower or outdoor unit
(3) Telecommunications equipment
The area or telecommunications equipment room in which telecommunications
equipment is to be installed need to be reviewed.
(4) Fire extinguishing facilities
If fire extinguishing facilities are to be installed, a particular area is needed to install
them.

2.2.5 Access routes

The process of installing a server system involves frequent carrying-in and out of
equipment, at initial system setup, the addition of more equipment, upgrading, and so
on. Before equipment is carried in, consideration should be given to the surrounding
conditions of the building, the location where the equipment is to be unpacked, how
the equipment is to be carried in, and temporary floor reinforcement along the access
route. To this end, the user needs to review the access route from the opening in the
building through which the equipment is carried into the computer room where the
equipment is to be set up. The Fujitsu shipping coordinator may take a preliminary
tour of the access route and conduct consultations with the user beforehand.
The items that require consideration are listed as follows:
14 C120-H007-08EN
Page 33
2.2 Buildings
Where the equipment is to be unloaded from the transport vehicle
How the equipment is to be carried in and out the building
Where the equipment is to be temporarily stored and unpacked
The size of the elevator and its loading capacity
The carry-in access route to the computer room
Whether floor protection along the access route is required
The access route from the building delivery entrance to the computer room is
described below:
(1) Building delivery entrance
a) Carrying in equipment in a wooden crate or box
When the server system to be carried in is enclosed in a wooden crate or box as is
the case when shipped from the factory over a long distance to a user overseas, the
building delivery entrance should generally have the following dimensions:
Height: 2.5 m (8.2 ft) or more
Width: 1.6 m (5.2 ft) or more
Because the wooden crate or box packaging dimensions for specific users depends
on the kind of equipment to be packaged and the transportation method, the field
representative in charge confers with the shipping department and notifies the user
accordingly.
b) Carrying in equipment with a crane
Difficulties may be experienced in carrying equipment into the middle floor of a
building directly with a crane, depending on the structure of the delivery entrance of
the building and the surrounding conditions of the building. Prior consultation with
the Fujitsu shipping coordinator is recommended.
(2) Computer room entrance and building passages
The delivery entrance of the building into which equipment is to be carried in
unpacked, the intermediate passages of the access route, and the entrance of the
computer room must have the values specified below.
The entrance of the computer room and the building passages should have a height
of at least 20 cm (8 in.) more than the assumed equipment height.
The entrance of the computer room and the building passages should have a width
of at least 30 cm (12 in.) wider than an equipment width.
Besides this, the followings need to be taken into consideration.
Enough space for negotiating corners along building passages
Whether the elevator(s) of the building is available
C120-H007-08EN 15
Page 34
CHAPTER 2 Installation Sites
(3) Withstand load and protection of the access route
The withstand load of the access route should be large enough to support the mass and
transportation activity concerning the server system.
At the time of transportation, the floor and wall surfaces along the access route may
require protection.

2.2.6 Water and fuel stocks

The quantities of water and fuels to be kept in stock should be calculated by taking
into account the number of hours for which server service should be sustained, a
factor that should be determined before proceeding with stock quantity calculation.
Primary considerations involved in the determination of stock quantities are as
follows:
Cooling water for air conditioning facilities and emergency power generation
facilities
Living utility water
Fuels for emergency power generation facilities
Fuels needed to heat or cool office rooms and rooms occupied by people

2.3 Computer Room Structure

This section describes the structural requirements of computer rooms, free-access
floors, and interior furnishings.

2.3.1 Computer room structural requirements

The following items are requirements that should be taken into account at the time of
computer room selection.
Base floor strength and surface finishing
Free-access floor
Ceiling height
Floor vibration
Room location and access route
Power supply
Air conditioning facilities and external water chilling facilities
16 C120-H007-08EN
Page 35
2.3 Computer Room Structure
Security and disaster prevention considerations
(1) Base floor strength
The base floor on which the server system is to be set up must have enough strength to
support a raised floor and facilities and equipment, as well as the server system itself.
A floor top view with an equipment layout superimposed with equipment weights for
each lockers must be presented to the building designer or the building constructor as
a means of determining whether the server system can be installed on the floor in
question.
For base floor strength, see Section 2.2.1, "Building structures."
(2) Dustproof finishing
If the surface of the base floor is left unfinished, equipment may be adversely affected
by calcium carbonate scattered as dust from the concrete surface. The concrete
surface must be finished with a dustproof coating to prevent the buildup of dust.
(3) Free-access floor construction
Server rooms covering an area of about 30 m
floor structure as far as circumstances allow. A raised floor structure with a free-
access floor that allows floor plate removal is recommended to facilitate equipment
installation and relocation, cabling, and underfloor ventilation. Requirements for the
raised floor height of a free-access floor and the floor panel strength are described in
Section 2.3.2, "Free-access flooring."
(4) Ceiling height
The ceiling of the computer room must be high enough to allow for the circulation of
cold air up from under the free-access floor to the heated equipment which it cools
down before flowing unrestrained within the room back to the air conditioner. The
ceiling height is measured from the surface of the free-access floor (raised floor) to
the bottom layer of the double ceiling. The values specified in Table 2.1 are required
depending on the equipment height.
Table 2.1 Ceiling heights
2
(320 ft2 ) or more should have a raised
Equipment height Ceiling height
Up to 1.8 m (5.9 ft
Above 1.8 m (5.9 ft) but not exceeding 2.0 m (6.6 ft) 2.5 m (8.2 ft
C120-H007-08EN 17
) 2.3 m (7.5 ft ) or higher
) or higher
Page 36
CHAPTER 2 Installation Sites

2.3.2 Free-access flooring

The construction of free-access floors is reviewed with respect to the following items:
Raised floor height
Strength and surface material of free-access floor panels
Opening for server-system-use
Installation of floor panels for a building air conditioner
Each item is described as follows:
(1) Raised floor height
Regarding the raised floor height of a free-access floor, the following factors require
consideration:
Availability of underfloor ventilation
Cabling height
Safeguards against earthquakes
Table 2.2 lists suggested raised floor heights for free-access floors.
Table 2.2 Raised floor heights of free-access floors
Condition Raised floor height
Room ventilation
Underfloor ventilation
Erected directly on the free-access floor Optional earthquake-free legs that absorb the energy of earthquakes installed to protect against earthquakes
Clamped from under the free-access floor to protect against earthquakes
Erected directly on the free-access floor Optional earthquake-free legs that absorb the energy of earthquakes installed to protect against earthquakes
Clamped from under the free-access floor to protect against earthquakes
180 mm (7 in.) or higher
250 mm (10 in.)
300 mm (12 in.)
400 mm (16 in.)
or higher
or higher
or higher
18 C120-H007-08EN
Page 37
2.3 Computer Room Structure
(2) Strength and surface material of free-access floor panels
Table 2.3 lists the strengths and surface materials suggested for free-access floor
panels.
Table 2.3 Strengths and surface materials of free-access floor panels
Item Condition
Floor-panel strength Deflection not exceeding 1.5 mm (0.05 in.) under a
concentrated load of 4.9 kN (1100 lbf)
6
9
Surface material
Suppression of static electricity
Oil resistance and ease of cleaning
Dust buildup characteristics
Volume resistivity falling 10
Resistant to oils used during maintenance and easy to clean
Resistant to dust buildup
to 10
(3) Opening for server-system-use
That area of the free-access floor in which a server system is installed requires a floor
panel opening, an auxiliary support and a slit floor panel.
When Fujitsu receives a free-access floor allocation plan from the user after the
finalization of an equipment layout, it will furnish an opening diagram marked with
an opening pattern, an auxiliary support position, and a slit floor panel position.
The user then proceeds with construction of the floor panel opening, an auxiliary
support, and slit floor panel on the basis of this opening diagram.
a) Floor panel opening
That area of the free-access floor in which an equipment is installed must have an
opening in the floor panel to facilitate equipment cabling and underfloor cold
ventilation.
b) Auxiliary supports
Depending on the shape of the floor panel opening, an auxiliary support may be
required to augment panel strength and to secure the panel in a firm position. In
installing equipment, such as a magnetic tape unit, on a floor panel, an auxiliary
support should be used to reinforce the floor panel so that the equipment can be kept
level by offsetting panel deflection.
c) Slit floor panels
Depending on the heat dissipation and the air intake/exhaust structures of the
equipment installed, a slit floor panel for cold ventilation may have to be installed in
the service area.
C120-H007-08EN 19
Page 38
CHAPTER 2 Installation Sites
Figure 2.1 shows the outer view of a slit floor panel.
Figure 2.1 Slit floor panel
d) Preventing the free-access floor from being collapsed because of the opening
Horizontal forces applied to the free-access floor during earthquakes or when heavy
equipment is carried in could cause the floor panel to shift, depending on the structure
of the free-access floor and the shape of the floor panel opening, leading to free-
access floor collapse. When such an opening is built, the free-access floor should be
reinforced with bolts or brackets to guard against possible collapse.
(4) Installation of a floor panel for a building air conditioner
A floor panel must be installed only for buildings air conditioned by underfloor
ventilation. When underfloor ventilation and room air conditioning are jointly used,
the floor panel is not required.
a) Underfloor ventilation
If only underfloor ventilation is used to air condition the computer room, floor
panels with an airflow control damper or airflow control panels must be installed to
allow cold air to rise up from under the free-access floor to circulate outward into
the room. This is proceeded to enable the air thus circulated may cool the heat
penetrating the computer room, and heat generated by room lighting and by the
operators' bodies.
20 C120-H007-08EN
Page 39
2.3 Computer Room Structure
The number of floor panels with an airflow control damper or number of airflow
control panels required should be determined by the air conditioning facility or the
free-access floor construction designer on the basis of the concerned heat load in the
room.
Figure 2.2 Floor panels with an airflow control damper
Figure 2.3 Air flow control panel
b) When underfloor ventilation and room air conditioning are combined
When underfloor ventilation is used to cool the equipment, with room air
conditioning available to air condition the building in which the server system is
housed, floor panels for the building's air conditioning system are not required.
(5) Slopes and stairways
If there is a difference in levels between the base floor and the free-access floor, either
a slope or stairway must be built at the entrance of the computer room to facilitate
traffic or physical transportation.
C120-H007-08EN 21
Page 40
CHAPTER 2 Installation Sites
(6) Base floor and free-access floor cleaning
The base floor and the free-access floor require cleaning before the server system is
installed. The following cleaning procedures are recommended, including those for
cleaning the free-access floor surface periodically:
1 Remove dust on the surface of the panels. 2 Clean with a mop or cloth dipped in a solution having an anti-static agent,
then squeeze the mop tightly before proceeding with mopping.
Never use polishing powder or solid or water-soluble waxes to clean computer rooms.
They may become deposited in gaps in the floor surface or floor panels, then scattered
by underfloor ventilation, penetrating inside the computers and affecting equipment
adversely.

2.3.3 Interiors

Server rooms require more strict temperature and humidity control than common
office rooms. Essential things to consider with regard to such air conditioning include
insulation against heat, prevention from entry of outside air, and shielding from direct
sunlight. Cutting out heat from external sources would lessen the heat load of the
building on the air conditioning facilities, leading to savings on expenditures on
power required for air conditioning.
Other factors to consider with regard to computer room interiors include sounds
absorption and insulation to suppress room noise, room lighting, and maintenance
outlets.
(1) Heat insulation
The computer room should have a heat-insulating structure to cut heat penetrating
through the walls, ceiling, windows, and other locations and to facilitate air
conditioning. Heat insulation may be effected, for example, by the use of wind-free
double walls and by finishing the walls, ceiling, and the ceiling of the floor
immediately below with heat insulators of a noncombustible kind.
22 C120-H007-08EN
Page 41
2.3 Computer Room Structure
(2) Prevention of entry of outside air
Outside air penetrating through gaps in a window could threaten successful
temperature and humidity control of the air conditioning facilities.
Moreover, outside air might contain dust and harmful gases. From this standpoint, the
windows in the computer room should be made airtight or semi-airtight. Openings
that may allow the direct inflow of air from outside, from the floor right above or
below, from passages, and elsewhere should be sealed. Outside air that is taken in
must have its temperature and humidity regulated by an air conditioner before it can
be fed into the computer room.
(3) Shielding from direct sunlight
When direct sunlight enters the room through a window, it could produce local
temperature increases in the room or in the equipment, adversely affecting the
performance of such equipment. These windows must have blinds affixed to shield
the room from direct sunlight.
(4) Sound absorption and insulation
Appropriate sound absorption is recommended in the computer room to ease operator
fatigue that may be caused by various kinds of noises generated in the room. Among
all areas of the computer room, the ceiling and walls will make for the most effective
sound absorbers when modified to this end. The use of noncombustible sound
absorbers is recommended. The walls of the computer room should have a sound
insulation structure to prevent noise from traveling imparted to adjoining offices,
meeting rooms, etc.
If the floor is to be covered with carpeting as a sound absorber, such carpeting must be
free of static electricity and dust.
(5) Lighting
It is recommended that the computer room be illuminated to provide an illuminance
of 400 to 600 lx at a point 85 cm (33 in.) above the floor for server system operation
and maintenance purposes. Each lighting fixture should be furnished with a switch to
turn off the light when it is not necessary.
C120-H007-08EN 23
Page 42
CHAPTER 2 Installation Sites
(6) Maintenance outlets
The computer room requires maintenance outlets to power instruments for
maintaining the server system or to clean the floor. Maintenance outlets should be
provided on column or wall surfaces 5 to 7 m (16 to 23 ft) apart at a height of about 30
cm (12 in.) above the floor. An extension cord is required where the outlet spacing
exceeds 7 m (23 ft). Power leading to the outlets may be fed from a common general
power source.
(7) Dust
It is recommended to provide preventive action for generation of dust within the room
in which the equipment is installed, and for entering of dust from the windows and
entrances of the room. Most equipment applies mandatory cooling method. If dust
particles adhere over the vent to shut down the airflow, the temperature inside the
equipment ascends. Such conditions may cause equipment fault or system down. Dust
may become a cause of readout malfunction when dust covers over magnetic tapes,
optical disks, or such media. Planning of media warehousing is also important.
24 C120-H007-08EN
Page 43

CHAPTER 3 Equipment Layout

1
This chapter describes the items which considerations require for when laying out
equipment. Equipment layout deserves special consideration, because it has a
significant bearing on the efficiency of system operation and maintenance.

3.1 Proposed Computer Room Top View

A top view of the proposed computer room must be prepared.
(1) Top view
A precise top view of the proposed computer room must be prepared to aid
in reviewing the equipment layout.
(2) Scale
The top view of the proposed computer room prepared on a scale of one-fiftieth
is recommended.

3.2 Equipment Templates

Equipment templates at a scale of one-fiftieth are recommended. Prepare templates
for the following kinds of equipment:
Server system main unit
Console tables
Equipment installation shelves
Cabinets used to house small floor-mounted equipment
Air conditioners
Power supply facilities
C120-H007-08EN 25
Page 44
CHAPTER 3 Equipment Layout

3.3 Precautions in Preparation of an Equipment Layout

In preparing an equipment layout, take into account hardware constraints, operational
considerations, and installation equipment constraints.

3.3.1 Hardware constraints

(1) Cable length limitations
Each signal cable or power control cable has a limitation on its length. In laying out
equipment, be careful not to exceed these limitations.
(2) Wiring volumes and routes
a) Small systems
In small systems involving a relatively low volume of wiring, equipment may be
installed in an I, L or E-shaped layout to simplify the wiring routes on or under the
floor.
Cover any wires or connections that are laid on the floor so that they do not interfere
with traffic.
b) Larger systems
In larger systems with an increased volume of wiring, a free-access floor is required.
This is a raised floor structure in which the floor plates are removable.
(3) Heat dissipation from equipment
If devices that dissipate a high amount of heat are used, they must not be concentrated
within the same area considering air conditioning capability (1 or 2 kW/m2).

3.3.2 Operational considerations

(1) Equipment functionality and operability
The components that make up a server system each have a specific functional goal to
serve and should be grouped for ease of system operation.
26 C120-H007-08EN
Page 45
3.3 Precautions in Preparation of an Equipment Layout
File units
CPUs Line units
I/O devices
Consoles
Even if a single device has multiple functions, it should be grouped according to the
degree to which it can be run with or without manual intervention.
Generally, devices may be divided into the following groups:
Consoles for visual monitoring
I/O devices requiring interchangeable and portable storage media
Connection equipment that has a long service life and seldom requires replacement
Data processing devices (such as CPUs and file units) that normally do not require
manual operation
Figure 3.1 shows a conceptual view of grouping.
Figure 3.1 Concept of units operational grouping
(2) Concentration of small equipment
Concentrate small devices, such as modems and LAN units, on shelves.
For a large number of small, floor-mounted devices, such as display controllers, LAN
controllers, link adapters, and optical channel adapters, consider erecting a single
cabinet to house them all.
(3) Entrance and passage
Lay out the equipment to facilitate human traffic and the movement of supplies and
storage media through the entrance. Allow also for human traffic and the movement
of media, equipment, and instruments when locating the passages in the room.
(4) Maintainability
Provide service clearance around server systems, air conditioners, and power supply
facilities to allow access for inspection or maintenance.
C120-H007-08EN 27
Page 46
CHAPTER 3 Equipment Layout
(5) Acoustic noise
A general-purpose server system is generally made up of a mix of equipment, each of
which generates its own acoustic noise. Because the acoustic noises from individual
equipment may result in a very high noise-level, it is recommended that these
equipment be installed in an unattended zone.
a) Distinction between an attended zone and an unattended zone
Install consoles and I/O equipment in a single attended zone, and data processors and
file storage units in an unattended zone.
b) Attended zone
Make sure that an attended zone is not surrounded by equipment on all sides. A wall
may be erected on one side or it may be partitioned for sound insulation.
(6) Furniture and fixtures
Provide locations for furniture and fixtures that are needed during operations.
Furniture and fixtures include:
Cabinets used to store media
Lockers used to store spare parts and documentation
Forms storage stands
(7) Handling of vents
Keep the inlet and outlet for air circulation and cooling equipment free from clogging
up.
28 C120-H007-08EN
Page 47

3.4 Air Conditioners

3.4 Air Conditioners
Factors to be considered when laying out air conditioning are described below:

3.4.1 Air conditioning units

Do not simply install a single, high-capacity central air conditioning unit in the
computer room or an adjoining air-conditioning room. Considering possible device
failures and the need for regular maintenance of air conditioning units, Fujitsu
recommends installing multiple small-capacity air conditioning units (having a
cooling power between 15 kW and 50 kW) at locations throughout the computer
room. Ensure that the installation area, including maintenance space, is not
unnecessarily large.

3.4.2 Air conditioning piping

When installing an underfloor-ventilation air conditioning unit, be careful to keep the
piping from interfering with the underfloor ventilation or wiring. Construct the air
conditioning piping upright from the floor above, below the ceiling, or on the back of
the air conditioning unit.

3.4.3 Heat distribution

Devices that generate high heat should be installed at the place where the devices are
cooled sufficiently by cold air from an air conditioner. Install air conditioners matched
to the required heat dissipation in each area.

3.4.4 Air circulation

When installing air conditioners in the computer room, lay out the equipment to allow
the air blown out from the air conditioner to circulate all around the equipment and
then back to the air conditioner steadily so that stagnant air will not exist. Because
airflow tends to stop around tall equipment, pay special attention to the relation
between the location of tall equipment and the air outlet of the air conditioner.
In a system using underfloor ventilation for air conditioning, consider the paths of
both hot and cold airflow.
C120-H007-08EN 29
Page 48
CHAPTER 3 Equipment Layout

3.4.5 Dusting

Units that use paper or toner in operation, such as line printers and laser printers,
produce dust. The relation between dust-producing devices and device that should be
dust-free requires special consideration. For example, dust-free devices can be
installed near the air outlet, while the dust-producing devices can be near the air
intake.

3.5 Power Supply Facilities

This section describes power supply facilities.

3.5.1 Power supply facilities for server system

The power supply facilities required for a server system include transformers, voltage
regulators, and distribution panels. Some of these are installed in the server room.
Table 3.1 summarizes the kinds, uses, and locations of the power supply facilities.
Table 3.1 Kinds, uses, and locations of power supply facilities (1/2)
Power supply Use Location
High-voltage transformers (dedicated to server systems or shared by other facilities)
Voltage regulators such as an uninterruptible power supply (UPS)
Transforms a high transmission voltage into a commercial voltage.
Compensates for momentary interruptions or voltage variations in commercial power.
Installed in a power user's electrical facility room, in a power company's transformer room, or on a pole.
Installed in a power user's electrical facility room or computer room. Generally, a UPS is installed in a dedicated electrical facility. A UPS rated at less than 100 kVA may be installed in a computer room.
30 C120-H007-08EN
Page 49
3.5 Power Supply Facilities
Table 3.1 Kinds, uses, and locations of power supply facilities (2/2)
Power supply Use Location
Separate transformers Low-voltage transformers used
when:
The supply voltage available to
the building and the voltage required by the server system differ.
A voltage regulator, such as a
UPS, is installed in a separate building or at a remote location.
Power is fed from a high-
voltage transformer that is shared by other facilities, without using a voltage regulator.
Step-down transformers (200 V to 100 V)
Distribution panels Distributes power to server
Grounding facilities Used to ground server system. The grounding cable is led to the
Transforms 200 V, from a high­voltage transformer and voltage regulator, to suit certain equipment which operates at 100 V.
system.
Separator transformers, when used, are typically installed in a computer room.
Step-down transformers, when used, are typically installed in a computer room.
Installed in a computer room.
distribution panel for distribution.

3.5.2 Power supply facilities for air conditioners

Air conditioners or air conditioning control panels must be located for correct and
efficient operation of the computer room.

3.5.3 Facility control panels

Facility control panels, which are used to run facilities in auto mode or shut them off
immediately in an emergency, must be located to allow easy access.
C120-H007-08EN 31
Page 50
CHAPTER 3 Equipment Layout

3.6 Line and Signal Wiring Facilities

This section describes line and signal wiring facilities.

3.6.1 Line facilities

When line terminal boards and line terminals are installed, they must be located to
allow for easy connection with any line units in the computer room.

3.6.2 Signal wiring facilities

Signal cabling with devices that are installed outside the computer room requires
wiring facilities, such as pipelines, ducts, and cable racks. Even though these units are
located in an adjoining room, a through hole in the wall would still be necessary.
Examine these wiring facility requirements and the location of any through holes
during layout preparation and mark the top view of the proposed computer room
accordingly.
32 C120-H007-08EN
Page 51

CHAPTER 4 Air Conditioning

1
This chapter describes which items require considerations when laying out air
conditioning facilities.

4.1 Characteristics of Computer Room Air Conditioning

Computer room air conditioning is characterized by:
Constant temperatures and humidities
Air conditioning conditions and capacities
Service time and reliability
These are detailed as below:

4.1.1 Constant temperatures and humidities

While most server system has wide permissible temperature and humidity ranges as
described later, it is recommended that the computer room be maintained at a constant
temperature and humidity to provide operational stability, fewer media effects, and a
good operator environment. A stable environment is important because the computer
room houses semiconductor devices, which are easily affected by thermal shocks,
precision mechanical parts, which are liable to thermal expansion due to temperature
changes, and print forms, toner, OMR and OCR forms, paper tape and other kinds of
media, which are susceptible to the effects of humidity changes. A computer room
requires temperature and humidity regulation, while guarding against electrostatic
effects at low humidities and dew condensation caused by underfloor ventilation at
lower temperatures and humidities.
C120-H007-08EN 33
Page 52
CHAPTER 4 Air Conditioning

4.1.2 Air conditioning conditions and capacities

The air conditioning system must have the capacity to be able to process the amount
of heat dissipated from the computer equipment to cool the computer room. A server
system
rated or listed capacity of the air conditioning facilities may have been measured for a
general office for human beings as specified by the relevant industrial standards or the
like and may not be readily applicable to a server room environment. Consultation or
design by a professional engineer is required for determining the capacity of an air
conditioner to be used in a computer room.

4.1.3 Service time and reliability

The air conditioning facilities for a computer room must be kept operable at all times.
A large number of relatively low-capacity units are recommended. Maintain the room
air at a somewhat lower temperature, so that even if one unit fails, there would still be
time to take corrective action before a critical temperature is reached. The installation
of spare units to back up the primary units is also recommended.
generates heat from the Power Supply Unit, semiconductor devices, etc. The

4.2 Styles of Air Conditioner

Air conditioner installations for computer rooms can be grouped into four broad styles
as listed below. Choose from them to suit the user's architectural requirements, the
size of the system installation, layout constraints, etc.
Direct blowing
Duct blowing
Underfloor ventilation
Combined use of direct or duct blowing and underfloor ventilation
These methods are detailed as below:
34 C120-H007-08EN
Page 53
4.2 Styles of Air Conditioner

4.2.1 Direct blowing

In the direct blowing setup, air conditioner(s) are installed in the computer room to
blow air directly into the room.
This setup is economical, permits easy room temperature and humidity regulation,
and is less susceptible to dew condensation. Moreover, the air conditioner(s), free
from blowing temperature constraints, offer high working efficiency. However, while
this setup is easier to install, cold air could be poorly distributed. Hence, a facility
layout should be such as to ensure unrestricted flow of cold air. Another drawback is
that where a high cooling capacity is required, rapid drafts of cold air could chill
operators.
Generally, a unit installed in a direct blowing setup should include a draft fan, a
cooling coil, a heater for the winter time, a humidifier, and a filter.
Figure 4.1 shows a schematic view of the direct blowing setup.

4.2.2 Duct blowing

In the duct blowing setup, air duct is connected to an air conditioner so that cold air is
blown from grille or spot in the computer room.
Figure 4.1 Direct blowing setup
This setup features offering uniform blowing, permitting easy room temperature and
humidity regulation, and lessening operator health effects. Its drawbacks, however,
are the need for ducting in the ceiling, possible collision of air blowing from the
ceiling with upward exhaust from the equipment, restricted equipment layout, and the
difficulty of using centralized blowing against equipment which requires high heat
dissipation.
C120-H007-08EN 35
Page 54
CHAPTER 4 Air Conditioning
An air conditioner installed in the duct blowing setup should include a cooling coil, a
heater for the winter and temperature control, a humidifier, and a filter.
Figure 4.2 shows a schematic view of the duct blowing setup.
Figure 4.2 Duct blowing setup

4.2.3 Underfloor ventilation

In the underfloor ventilation setup, air blown out of the air conditioner is fed into the
clearance between the free-access floor and the base floor, and is blown through
openings in the free-access floor into the space at the bottom of the server system or
the surrounding space.
This setup is useful in the following cases:
Larger server systems including high heat dissipation volume unit(s)
Intricate layout including tall equipment
36 C120-H007-08EN
Page 55
4.2 Styles of Air Conditioner
This setup features the ability to keep operators less chilled because this lessens direct
exposure to drafts of air blown out of the air conditioner. Because underfloor
ventilation blows air directly against equipment, the air must be filtered for dust by
the air conditioner beforehand. The lower the air temperature is, the greater the
chance for dew condensation becomes because of increased humidity. Hence, the air
requires regulation of both its temperature and humidity. A special underfloor-
ventilation air conditioner dedicated to computer room use, which permits
temperature and humidity regulation, is usually used. An air handling unit that uses a
water-based cooling coil must be controlled to maintain the humidity, as well as the
temperature, within a prescribed range. Regulation of the temperature and humidity in
this setup is generally accomplished by cooling and dehumidifying the room air to a
temperature lower than the target temperature and then heating and humidifying it to
some degree to attain the target temperature and humidity. The cooling capacity of an
air conditioner installed in this setup will be lower than its rating because of the
internal heating process involved.
In the winter time, heating to a predetermined temperature is required.
Figure 4.3 shows a schematic view of the underfloor ventilation setup.
Figure 4.3 Underfloor ventilation setup

4.2.4 Combined use of direct or duct blowing and underfloor ventilation

If direct blowing or duct blowing is combined with underfloor ventilation, the server
system is cooled down by the air blown from under the floor, while the air in the room
is conditioned to a temperature suitable for the operator by room air conditioning.
The underfloor-ventilation air conditioner dehumidifies the air by overcooling before
regulating the temperature and humidity by heating and humidifying.
C120-H007-08EN 37
Page 56
CHAPTER 4 Air Conditioning
Sometimes the underfloor-ventilation air conditioner does not perform heating and
humidifying but only cools the room air to the target temperature. In this situation,
regulation of the temperature and humidity of the air in the room and under the floor
can be accomplished by heating and humidifying the room air and the outside air after
it has been dehumidified by overcooling by the underfloor air conditioner.
Figure 4.4 shows a schematic view of a combined system.
Figure 4.4 Schematic view of a combined system

4.3 Air Conditioning Conditions

This section describes air conditioning conditions.

4.3.1 Permissible temperature and humidity ranges for server systems

Each component of a server system has its own permissible temperature and humidity
ranges, within which its operability is guaranteed. The prescribed temperature and
humidity are those at the air vents of the component. For the permissible temperature
and humidity ranges, see the Installation Planning Manual for each device.
38 C120-H007-08EN
Page 57
4.3 Air Conditioning Conditions

4.3.2 Recommended temperatures and humidities for computer rooms

Keep the ambient temperature in the computer room at a level that feeds comfortable
to the human body or somewhat lower. This precaution will not only prevent local
temperature rises in the computer room, such as those caused by equipment which
requires high heat dissipation, or stagnant air circulation, but will also allow some
time before the upper-limit temperature is reached even if the air conditioner fails.
In underfloor ventilation, humidity considerations require special consideration.
Normal air contains vapor. The higher the temperature is, the lower the relative
humidity is; the lower the temperature is, the higher the relative humidity is. For
example, air at a temperature of 24C (75F) with a relative humidity of 45% would
have a relative humidity of 65% at a temperature of 18C (64F) and could have a
still higher relative humidity as the temperature falls.
Air conditioners are not designed to detect subtle changes in temperature and
humidity in the entire computer room space. Generally, air conditioning is controlled
by detecting and regulating the temperature and humidity at the main unit or at each
of multiple air outlets. An air conditioner installed for underfloor ventilation detects
and regulates the temperature and humidity at a point near each air outlet. As such, a
nonuniform distribution of temperature and humidity may occur in the computer
room.
Table 4.1 lists recommended temperatures and humidities for computer rooms.
C120-H007-08EN 39
Page 58
CHAPTER 4 Air Conditioning
Table 4.1 Recommended temperatures and humidities for computer rooms
Air
conditioning
setup
Direct blowing or duct blowing
Underfloor ventilation
Combined direct blowing or duct blowing and underfloor ventilation
Near the underfloor air outlet Detection and regulation point
Temperature
C F
181 C 642 F 655% Targeted
181 C 642 F655% 24 2 C754F455%
24 2 C754F455%
Humidity %
Temperature
C
at 24 C
F
Targeted at 75F
Humidity %
About 45% at 24C (75F)
The temperature and humidity depend on the thermal load.
Remarks

4.3.3 Temperature and humidity recommendations for computer rooms

Practical temperature and humidity recommendations that apply to changing the room
temperature from the basic recommendations or to lowering the underfloor
temperature in unattended areas where paper is not used are explained below.
(1) Changing the room temperature
Before changing the room temperature of a computer room from the basic
recommendations consider the following:
Keep the room humidity constant when direct blowing or duct blowing is used.
If underfloor ventilation and room air conditioning is combined, keep the absolute
temperature, which is a measure of the water content of the room air, equivalent to
a temperature of 24C (75F) and a humidity of 45%. Do not change the flow rate
even if the underfloor temperature is changed.
Table 4.2 summarizes the practical temperature and humidity recommendations that
apply to changing the temperature from the basic recommendations.
40 C120-H007-08EN
Page 59
4.3 Air Conditioning Conditions
Table 4.2 Temperature and humidity recommendations (changing the room
temperature)
Air conditioning
setup
Direct blow or duct blow
Underfloor ventilation
Combined use of direct blowing or duct blowing and underfloor ventilation
Near the underfloor air
outlet
Temperature
C F C F
Setting:
181 C 642 F655% Targeted at
191 C 662 F625% Targeted
20 1 C 682 F585% Targeted
181 C 642 F655% 242 C754F 40 to 50% Do not
191
C 662 F625% 252 C774F 40 to 48%
20 1 C 68 2 F585% 262 C794F 40 to 45%
Humidity
%
Detection and regulation
point
Temperature
Setting: Between 21 and 26 Width of variation: 2 C
24 C
between 24 and 25C
between 24 and 26 C
Between 70
and 79 Width
of variation:
4F
Targeted at
75F
Targeted
between
75 and 77F
Targeted
between
75 and 79F
Humidity
%
455%
About 45% at 24C (75F)
About 43% at 24C (75F)
About 40% at 26C (79F)
The temperature and humidity depend on the thermal load. Do not change the flow rate even if the underfloor temperature is changed.
change the flow rate even if the underfloor temperature is changed.
Remarks
Figure 4.5 is an air-line diagram depicting the relationships between the dry-bulb
temperature, relative humidity, and absolute temperature.
Figure 4.5 Psychrometric chart applicable to changing the room temperature
C120-H007-08EN 41
Page 60
CHAPTER 4 Air Conditioning
(2) Lowering the underfloor temperature
In unattended areas where paper is not used and where only those devices that have
broad permissible underfloor and room temperature and humidity ranges are installed,
the underfloor temperature may be lowered. As an example, in an unattended room
associated with a large system installation involving multiple computer rooms, hold
the underfloor relative humidity to 70% or below to keep the room humidity at a
lower level.
Table 4.3 summarizes the practical temperature and humidity recommendations that
apply to lowering the underfloor temperature.
Table 4.3 Temperature and humidity recommendations (lowering the underfloor
temperature)
Air
conditioning
setup
Underfloor ventilation
Combined use of direct blowing or duct blowing and underfloor ventilation
Figure 4.6 is an air-line diagram applicable to lowering the underfloor temperature.
Near the underfloor air outlet Detection and regulation point
Humidity
C F C F
171 C 632 F655% Targeted
161 C 612 F655% Targeted
171 C 632 F655% 242 C754F425%
161 C 612 F655% 242 C754F405%
%
Temperature Humidity
at 24 C
at 24 C
Targ eted at 75F
Targ eted at 75F
About 42% at 24C (75F)
About 40% at 24C (75F)
The temperature and humidity depend on the thermal load.
RemarksTemperature
Figure 4.6 Psychrometric chart applicable to lowering the underfloor temperature
42 C120-H007-08EN
Page 61
4.3 Air Conditioning Conditions

4.3.4 Dust

(1) Airborne dust
Ensure that airborne dust does not exceed 0.15 mg/m3 (0.004 mg/ft3). Most server
systems are designed to withstand this level of airborne dust. This is the same as the
permissible level for airborne dust in a general office and should be easily attainable
in a computer room where there is little inflow of outside air and smoke.
(2) Removing dust
Airborne dust is collected by air filters in the air conditioner. For air filter, see Section
4.5.2, "Air conditioner filters." The computer room must be periodically cleaned to
remove dust on and under the floor. For cleaning procedures, see (6), "Base floor and
free-access floor cleaning," in 2.3.2, "Free-access flooring."
Cleaning is required in the following situations:
When the construction of the computer room has just been completed, and it is
ready to house equipment.
When the computer room has been repaired.
When equipment already in position in the computer room has been relocated.
Areas surrounding printers and for forms handling require periodic cleaning.

4.3.5 Corrosive gases

Corrosive gases must be removed and kept out by using appropriate air cleaning
facilities. Maintaining positive pressure in the computer room with filtered air will
serve as a safeguard against the entry of corrosive gases or dust from an outside
source.
Table 4.4 lists the tolerable limits for different kinds of corrosive gases.
Table 4.4 Tolerable limits for corrosive gases (1/2)
Gas name Tolerable limit
Hydrogen sulfide (H
Sulfur dioxide (sulfur oxide) (SO
Hydrogen chloride (HCI) Up to 6.6 ppb
Chlorine (CI
Hydrogen fluoride (HF) Up to 3.6 ppb
C120-H007-08EN 43
) Up to 3.4 ppb
2
S) Up to 7.1 ppb
2
) Up to 37 ppb
2
Page 62
CHAPTER 4 Air Conditioning
Table 4.4 Tolerable limits for corrosive gases (2/2)
Gas name Tol er ab le li mi t
Nitrogen dioxide (nitrogen oxide) (NO2) Up to 52 ppb
Ammonia (NH
Ozone (O
Oil vapor
) Up to 420 ppb
3
) Up to 5 ppb
3

4.3.6 Seawater (salt damage)

The air in the vicinity of coastal areas contains large amounts of airborne sea salt
particles. If these particles remain inside computers, substances are formed by a
condensation reaction of chemicals. These substances and the humidity lead to
insulation failure and the corrosion and deterioration of components and materials.
Therefore, computers should be installed in locations at a distance from coastal areas.
The following outlines installation criteria for preventing salt water damage due to
airborne sea salt particles.
Criteria: The installation site shall not be within 0.5 km of the ocean or coastal areas
(unless the computer room uses air conditioners to filter out airborne sea salt particles
from outside air).
Up to 0.2 mg/m
3
44 C120-H007-08EN
Page 63

4.4 Thermal Load and Cooling Capacities

4.4 Thermal Load and Cooling Capacities
The thermal load imposed on an air conditioner must include those coming from the
power supply facilities and from the building, as well as heat from the server system
itself.
Air conditioning of computer rooms in comparison with normal offices is
characterized by the following:
Sensible heat accounts for a greater percentage of the heat which causes
temperature rises, with lesser latent heat relating to outside air and vapor from
human bodies. The flow rate of the air conditioner needs to be able to cool sensible
heat.
While the common room temperature and humidity requirements are 24C (75F)
(dry-bulb temperature) and 45% (relative humidity), the ratings of air conditioners
are usually stated at 27C (81F) and 50%.
Hence, it is more desirable to determine the cooling capacity of an air conditioner on
the basis of its test data, rather than its stated ratings. Possible sources of thermal load
that are imposed on air conditioners, examples of cooling capacity calculations, and
convenient formulas to work out air conditioning capacities are described below:

4.4.1 Thermal load imposed on air conditioner

The thermal load that is imposed on an air conditioner in a server room can generally
be calculated by summing up the amount of heat dissipation listed in Table 4.5.
Table 4.5 Sources of overload and amount of heat dissipation
Source of heat Amount of heat dissipation
Heat from the server system
Heat from the power supply facilities
Heat from outside the room (walls, partitions, windows, ceiling, floor, etc.)
Heat from outside air taken in, from natural ventilation, etc.
Heat from lighting fixtures
Heat from human bodies
Amount of heat dissipation calculated from the specification of the individual devices.
Amount of heat dissipation from the stepdown transformer, automatic voltage regulator (AVR), or uninterruptible power supply (UPS).
A computer room in a steel-framed reinforced concrete building built in Japan typically has a heat
dissipation of about 420 kJ/h per 1m
2
per 1 ft This approximate value depends on the district in which the building exists, its structure, the orientation of the room, and other relevant conditions.
).
2
(36.9 Btu/h
C120-H007-08EN 45
Page 64
CHAPTER 4 Air Conditioning

4.4.2 Example of cooling capacity calculations for room air conditioning

Examples of cooling capacity calculations for an air conditioner, flow rate 135 m3/min
(4770 ft3/min), running in a room air conditioning setup are given below.
The following values have been determined with respect to the rated capacity of 167.4
MJ/h (158,700 Btu/h):
The cooling capacity is 145.6 MJ/h (138,000 Btu/h), 87% of the capacity rating.
The sensible heat capacity is 124.4 MJ/h (117,900 Btu/h), 74% of the capacity
rating.
Figure 4.7 shows typical air conditioner characteristics, and Figure 4.8 shows the air
condition in a psychrometric chart.
Figure 4.7 Typical air conditioner characteristics
Figure 4.8 Air condition in a psychrometric chart (for a typical air conditioner)
Table 4.6 summarizes procedures that can be used to calculate the cooling capacities
of a typical air conditioner from its characteristics and psychrometric chart.
46 C120-H007-08EN
Page 65
4.4 Thermal Load and Cooling Capacities
The values in the table involve certain characteristic curve and air-line diagram read
errors.
Table 4.6 Examples of typical air conditioner cooling capacity calculations (1/2)
Item Calculated value Calculation method
Enthalpy of the air at the conditioner inlet
Enthalpy difference between the air conditioner coil inlet and the coil surface
Enthalpy on the air conditioner coil surface
Air conditioner bypass factor
Enthalpy of the air coming out of the air conditioner
Temperature and humidity at the inlet
Enthalpy on the air conditioner coil surface
Temperature and humidity of the air coming out of the air conditioner
Air conditioner cooling capacity
i
=45.4 kJ/kg
1
(19.6 Btu/lb)
i=16.7 kJ/kg
(7.2 Btu/lb)
i
=28.7 kJ/kg
2
(12.4 Btu/lb)
Determine the enthalpy at 24C (75.2F)and 45%RH from the air-line diagram
Determine the difference from typical air conditioner characteristics.
Determine the enthalpy from the air-line diagram.
BF=0.095 Determine the bypass factor from typical air
conditioner characteristics.
i
=30.3 kJ/kg
3
(13.1 Btu/lb)
Calculate the enthalpy by solving the bypass factor relation BF= (i
- i2) / (i1 - i2).
3
24C (75.2F) 45% Setup condition
9.7C (49.5F) 100%
Determine the temperature and humidity from the point of intersection between the enthalpy (i
) on the air conditioner coil
2
surface and 100% relative humidity in the air-line diagram.
11.1C (52F) 92% Determine the temperature and humidity from the point of intersection of a line segment, between the status point at the conditioner inlet and that on the air conditioner coil surface, and the enthalpy of the air coming out of the air conditioner in the air-line diagram.
145.6 MJ/h
(138,029 Btu/h)
(i
- i3) Flow rate/Specific volume
1
3
3
3
/kg)
/lb)
/min)
3
/min)
=15.1 (kJ/kg) 135 (m
60 (min/h) / 0.84 (m
=6.5 (Btu/lb) 4770 (ft
60 (min/h) / 13.5 (ft
C120-H007-08EN 47
Page 66
CHAPTER 4 Air Conditioning
Table 4.6 Examples of typical air conditioner cooling capacity calculations (2/2)
Item Calculated value Calculation method
Air conditioner sensible heat cooling capacity (when calculated on the basis of sensible heat enthalpy differences)
Air conditioner sensible heat cooling capacity (when calculated on the basis of temperature differences)
124.4 MJ/h (117,931 Btu/h)
124.4 MJ/h (117,931 Btu/h)
(i
- i3) Flow rate/Specific volume
4
3
=12.9 (kJ/kg) 135 (m
3
0.84 (m
/kg)
=5.5 (Btu/lb) 4770 (ft
60 (min/h) / 13.5 (ft
(T
- T3) Specific heat  Flow
1
/min) 60 (min/h) /
3
/min)
3
/lb)
rate/ Specific volume =(24-11.1)(C)  1[kJ/(kg  C)]
135 (m
/ 0.84 (m
3
/min) 60 (min/h)
3
/kg)
=(75.2-52)(F) 0.24[Btu/(lbF)] 4770
(ft3/min) 60 (min/h) / 13.5 (ft3/lb)
48 C120-H007-08EN
Page 67
4.4 Thermal Load and Cooling Capacities

4.4.3 Underfloor ventilation air conditioning

Figure 4.9 shows the air condition for underfloor ventilation in a psychrometric chart.
Table 4.7 summarizes procedures for calculating the cooling capacities of an
underfloor-ventilation air conditioner, flow rate 220 m3/min (7770ft3/min).
The values in the table involve certain characteristic curve and psychrometric chart
read errors.
Figure 4.9 Air condition in a psychrometric chart (underfloor-ventilation air)
Table 4.7 Examples of underfloor-ventilation air conditioner cooling capacity
calculations (1/2)
Item Calculated value Calculation method
Temperature and humidity at the inlet
Temperature and humidity of the air coming out of the air conditioner
Air conditioner sensible heat cooling capacity (when calculated on the basis of temperature differences)
Enthalpy of the air at the conditioner inlet
24C (75.2F) 45% Setup condition
18C (64.4F) 65% Setup condition
94.3 MJ/h (89400 Btu/h) at a flow
rate of 220 m
3
/min (7770ft3/min)
(T
- T5) Specific heat Flow rate/
1
Specific volume =(24-18)(C) 1[KJ/(kg C)]220 (m min) 60 (min/h) / 0.84 (m =(75.2-64.4)(F) [Btu/(lbF)] 
ft3/min) 60 (min/h) / 13.5 ft3/lb)
i
=45.4 kJ/kg
1
(19.5 Btu/lb)
Determine the enthalpy at 24C (75.2°F) and 45% RH from the air-line diagram.
3
/kg)
3
/
C120-H007-08EN 49
Page 68
CHAPTER 4 Air Conditioning
1.0/0.84 (24 C-11 C) 0.9 60
Thermal load (kJ/h)
0.24/13.5 (75.2 F-52 F) 0.9 60
Thermal load (Btu/h)
=
.
.
=
.
.
Flow rate (m /min)
3
Flow rate (ft /min)
3
1.0/0.84 (24 C-18 C) 60
Thermal load (kJ/h)
0.24/13.5 (75.2 F-64.4 F) 60
Thermal load (Btu/h)
=
.
.
=
.
.
Flow rate (m /min)
3
Flow rate (ft /min)
3
Table 4.7 Examples of underfloor-ventilation air conditioner cooling capacity
calculations (2/2)
Item Calculated value Calculation method
Enthalpy of the air coming out of the air
i5 =39.3 kJ/kg
(16.9 Btu/lb)
Determine the enthalpy at 18C (64.4°F)
and 65% RH from the air-line diagram. conditioner
Air conditioner sensible heat cooling capacity (when calculated on the basis of sensible heat enthalpy difference)
95.9 MJ/h(90900 Btu/h) at a flow
rate of 220 m
3
/min (7770ft3/min)
(i
- i5) Flow rate/Specific volume
1
=6.1(kJ/kg) 220 (m
 60 (min/h) / 0.84 (m
=2.6(Btu/lb)  ft
60 (min/h) / 13.5 ft
3
/min)
3
/kg)
3
/min)
3
/lb)

4.4.4 Convenient formulas for air conditioning capacities

Table 4.8 lists convenient formulas for the capacity of air conditioners installed in a
computer room. Because a proportion of the thermal load comes from sensible heat,
the capacity and number of air conditioners required can be determined by calculating
the flow rate requirement relating to sensible heat. Actual air conditioning design
should allow for air conditioner characteristics, building thermal load calculations,
etc.
Table 4.8 Convenient formulas for air conditioner capacity
Air conditioning setup
Room air conditioning
Underfloor ventilation
Flow rate calculation formula
50 C120-H007-08EN
Page 69
4.4 Thermal Load and Cooling Capacities
Sensible heat from thermal load
Temperature difference
Specific
heat/Specific vol
----------------------------------------------------------------------------------------------------------------------------------------------------------
=
The formula terms are:
Flow rate: Sensible heat from the thermal load divided by the temperature
difference and the heat removed to cool a unit volume by 1C (34F).
Thermal load: While the thermal load is a sum of sensible heat and latent heat,
sensible heat accounts for such a large proportion of the thermal load in a computer
room that the thermal load is assumed to be equal to the sensible heat.
Thermal load = Sensible heat + Latent heat Sensible heat
• 1.0 or 0.24: Specific heat of the air [kJ/(kg  C )] or [Btu/(lb  F)]
• 0.84 or 1.35:
Specific volume of the air (m
3
/kg) or (ft
•24C or 75.2F: Air conditioner inlet air temperature
•11C or 52F: Approximate temperature of the air on the coil surface of a room air conditioner
• 0.9: Approximate bypass factor of a room air conditioner
• 60: Conversion to minutes (min/h)
•18C or 64.4F: Outlet air temperature of an underfloor-ventilation air conditioner
3
/lb)
C120-H007-08EN 51
Page 70
CHAPTER 4 Air Conditioning

4.5 Precautions Pertaining to the Installation of Air Conditioners

Air conditioners that are installed in computer rooms differ in many ways from those
installed in general offices. Precautions specific to installing air conditioners in a
computer room are summarized below.

4.5.1 Humidifier

The reason a humidifier is needed, types of humidifiers available, and humidifiers
used with underfloor-ventilation air conditioners are described below.
(1) Why a humidifier is needed?
In the winter time, drops in the relative humidity of the air in the computer room make
it more susceptible to the generation of static electricity. To prevent this, a humidifier
must be installed to raise the relative humidity of the room air.
(2) Types of humidifiers and replacement water
Use of a humidifier that generates steam by boiling water is recommended.
Using a boiling humidifier will cause impurities in the water to be precipitated and
should have automatic or periodic discharge and replacement of the water.
A spraying humidifier (for example, ultrasonic humidifier, water spray, or centrifugal
sprayer) discharges fine drops of water into the air in vapor form. With this type of
humidifier, impurities in the water could adhere to the equipment or supplies as white
powder. This white powder can be a source of numerous problems, including
defective insulation, rusting, clogged filters, or poor contact, and might also scratch
the surfaces of magnetic disks, resulting in loss of data.
When using spray humidifiers including ultrasonic humidifier, be sure to maintain the
purity of distilled water.
The following conditions must be considered when using purifiers.
Let distilled water pass the ion exchange resin of the purifier. The conductivity of
water after passing a purifier must not exceed 2 S/cm.
Use a purifier that detects problems in the ion exchange resin automatically to
sustain the performance of the purifier. When problems are detected, replace the
ion exchange resin.
52 C120-H007-08EN
Page 71
4.5 Precautions Pertaining to the Installation of Air Conditioners
(3) Humidifiers used with underfloor-ventilation air conditioners
Certain types of underfloor-ventilation air conditioners have a boiling humidifier and
a draft fan installed at adjacent locations such that drops of boiling water from the
humidifier can enter the draft fan for aerial dispersion. If this occurs, impurities in the
drops of water can adhere to the air inlet of the equipment as white powder or turn
into sandy particulate under the floor and cause corrosion.
Care should be taken in selecting or designing an air conditioner to prevent the
dispersion of drops of boiling water from a boiling humidifier. In scheduled facility
checkouts, check for white powder on the draft fan, sandy particulate under the floor,
and white powder on the air inlets of the equipment and any resultant corrosion to
ensure that the air conditioner is working correctly.

4.5.2 Air conditioner filters

Use filters that provide a high collection efficiency and that do not have any adverse
effects on the server system. Also install a filter at the outside air inlet to remove dust
from the outside air.
(1) Filter collection efficiency
Use of a filter with a collection efficiency of 95% or higher as measured by the
gravimetric method is recommended.
(2) Filter types
Filters must be mechanical ones made of a nonwoven cloth or similar material. Do not
use electrostatic dust collectors as they generate ozone gases, which could degrade
rubber parts.
C120-H007-08EN 53
Page 72
CHAPTER 4 Air Conditioning

4.5.3 Installing temperature/humidity sensors

Temperature/humidity sensors used to regulate the temperature and humidity of an air
conditioner are installed at different positions according to the ventilation method.
(1) Location of temperature/humidity sensors for a room air
conditioner
Location to install temperature/humidity sensors for a room air conditioner is:
At a height of about 1 to 1.5 m (3.3 to 4.9 ft) above the floor
Where measuring the mean temperature and humidity is available
Where they are not exposed to direct drafts of cold air from the air conditioner or
air emissions from the equipment
(2) Location of temperature/humidity sensors for an underfloor-
ventilation air conditioner
Location to install a temperature/humidity sensor for a underfloor-ventilation air
conditioner is:
Under the floor 1 to 1.5 m (3.3 to 4.9 ft) from the air outlets
Where they are readily accessible for inspection

4.5.4 Taking in fresh air

Fresh air needs to be drawn into the computer room for operators.
(1) Volume of fresh air
Fresh air should be taken in at a rate of about 30 m3/h (1100 ft3/h) per operator present.
Where outside air is taken in through a duct, and not by natural ventilation through
ventilation, dust must be removed and its temperature and humidity regulated before
it can be fed into the room or under the floor.
(2) Preventing natural inflow of outside air
Install a closing damper at the outside air intake duct. Keep it closed to prevent the
natural inflow of outside air while the air conditioner is shut down. Prevent natural
inflow of outside air through ventilation.
54 C120-H007-08EN
Page 73
4.5 Precautions Pertaining to the Installation of Air Conditioners

4.5.5 Preventing dew condensation in underfloor ventilation

In underfloor ventilation, provisions should be made to prevent dew condensation
inside and outside of devices installed in the computer room as they are exposed to
direct drafts of cold air from the air conditioner. Devices are susceptible to dew
condensation if they are at a low temperature while the room temperature is low and
also if the air inside and outside the room is at a high temperature and a high humidity.
Further, where both the temperature and humidity are regulated from the beginning,
the underfloor air could be dampened and cause dew condensation.
The air conditioning control scheme must be examined and established on the user's
own responsibility to meet their own needs. Typical air conditioning control schemes
are described below.
(1) If the room temperature is low
If the room is in low temperature, the devices installed in the computer room is also
cool. When this occurs, follow the procedure below to start the humidifiers.
1 Stop the humidifier of the air conditioner(s). 2 After reaching the target temperature only with the air conditioner in heating-drive
mode, turn on the server systems.
3 Change the drive mode of the air conditioner to cooling-drive. 4 When room temperature reaches stable circumstance, start operating the
humidifiers.
(2) If the room air is at a high temperature and a high humidity
If the room air is at a high temperature and a high humidity, the room humidity will
rise sharply when the air conditioner starts to deliver low-temperature air. When this
occurs, follow the procedure below to start operating the air conditioning.
1 Bring the room air to the target temperature and humidity points slowly while
dehumidifying the air with a high blow temperature setting and a low humidity setting. Keep the dehumidifier stopped in the meantime. If the room humidity does not fall below its target point before the dehumidifier is run, the following are conceivable:
Failing to dehumidify the air because reheater that regulates the temperature after
room air has been cooled may not operate.
Outside air penetrating the room through gaps.
In this case, the facilities and building must be checked.
C120-H007-08EN 55
Page 74
CHAPTER 4 Air Conditioning
2 When temperature reaches the target range, turn on the server system. The
humidifier may operate after the room temperature reaches a stable state.
(3) Example of stopping humidifier upon starting up of the server
system
In underfloor ventilation, if heat dissipation from server system during startup of the
equipment leads transition of drive condition of the air conditioners, and the room is
dampened heavily so that the room is brought to high humidity, dew condensation
may be caused in the server system. In such case, to prevent high humidity or dew
condensation, stop the humidifier before turning on the server system, restart the
humidifier when the temperature is stabilized after server system is turned on.

4.5.6 Preventing water leaks and installing detectors

Ensure that water leaks, resulting from failures in the air conditioner or water piping
or clogged drain pipes, will not spread to under the raised floor or over the floor
surface. When water leaks occur, they should be detected immediately. It is
recommended that dikes or similar fences be made around the air conditioner and that
leak detectors be installed inside the dike and around the water pipeline.
Figure 4.10 is a schematic view of a dike.
Figure 4.10 Dike
56 C120-H007-08EN
Page 75
4.5 Precautions Pertaining to the Installation of Air Conditioners

4.5.7 Installing a backup unit

It is recommended that the air conditioner be backed up. Without a backup unit, if the
air conditioner fails, the resultant rise in the computer room temperature would
demand a shutdown of the server system to correct the failure. A backup unit also
facilitates scheduled inspections.

4.5.8 Preventing freezing of cooling water

The air conditioner for a server system is generally run for cooling year round. If a
water-cooled air conditioner is used, care should be taken to prevent the water in the
cooling tower from freezing.
C120-H007-08EN 57
Page 76
Page 77
CHAPTER 5 Electromagnetic Environment
and Static Electricity
1
This chapter explains the electromagnetic environment conditions and electrostatic
effects relevant to server systems.

5.1 Magnetic Fields

CRT displays could be influenced by the magnetic fields generated by nearby power
transformers, electric wires carrying large current, or any magnetized metallic objects.

5.1.1 Allowable magnetic field intensities of displays

CRT displays vary in allowable magnetic field intensity depending on the size of the
CRT, resolution, etc.
Typical values are:
Allowable AC magnetic field intensity: About 1 
Allowable DC magnetic field intensity: About 50 to
C120-H007-08EN 59
Page 78
CHAPTER 5 Electromagnetic Environment and Static Electricity

5.1.2 Sources of magnetic fields and fault symptoms

Table 5.1 lists the possible sources of magnetic fields and the associated display
screen faults.
Table 5.1 Sources of magnetic fields and fault symptoms (1/2)
Magnetic field
component
AC magnetic field components
Source of magnetic field Fault symptom
1 Power supply facilities, such as an uninterruptible
power supply and a transformer, or any electrically driven equipment, such as a motor: Magnetic fields are generated by current flowing through the equipment. Example: AC magnetic field of 8.2 at a point 4 m (13 ft) away from a transformer rated at 100 kVA.
2 Indoor electrical connections: A separation of 2 m (7 ft)
from connections rated at 30 A or so will eliminate their effects. Example: AC magnetic field of 2.5 at a point 1 m (3 ft) away from a connection that is not enclosed in a steel pipe.
3 High-voltage transmission lines, electric car overhead
lines Example: A high-voltage transmission line rated at about 280 A will affect the display images of displays installed 5 m (16 ft) away with a magnetic field of 2.4 , but will not affect those of a display device installed 10 m (33 ft) away with only 0.6 
4 Adjacent equipment: Magnetic fields generated from
the adjacent equipment could exert adverse effects. Example: AC magnetic field of 3  at a point 200 mm (8 in.) away from a display device.
5 Mutual interference among display devices: Magnetic
fields generated from the deflection yoke in each device may have an interfering effect. Example: AC magnetic field of 3 at a point 200 mm (8 in.) away from a display device.
Fluctuating display images
60 C120-H007-08EN
Page 79
5.1 Magnetic Fields
Table 5.1 Sources of magnetic fields and fault symptoms (2/2)
Magnetic field
component
DC magnetic field components
1 Electrically welded metallic exterior sheets, etc.:
Magnetism may remain as a result of metallic magnetization.
2 Magnets used in acoustic equipment: Speaker magnets,
etc.
3 Steel-framed prefabricated columns, etc. moved by an
electromagnetic on a crane Example: DC magnetic field of 100 at a point 0.5 m (1.6 ft) away from the steel frame.
4 Equipment operating on a DC magnetic field principle,
a magnetic paper holder, etc. Example: DC magnetic field of 500 at a point 2 m (7 ft) away from a nuclear magnetic resonance unit
Source of magnetic field Fault symptom

5.1.3 Magnetic field control

Displays may require the following actions to control nearby magnetic fields in
Color misconvergence, display distortion
excess of their allowable magnetic field intensities:
(1) Separating the display
Keep the display farther away from sources of magnetic fields. Magnetic fields will
be lessened in a range between the value divided by separation to the third power and
the value divided by separation to the second power.
(2) Changing the display type
Change the display from a CRT display to a liquid-crystal or plasma display.
(3) Magnetic shielding
Special permalloy parts or cases can provide a shield against magnetic field effects.
Certain display models are available with internal fitting magnetic shied options.
For information on magnetic shielding of a display as a whole, consult a shielding
case manufacturer.
C120-H007-08EN 61
Page 80
CHAPTER 5 Electromagnetic Environment and Static Electricity

5.2 Electric Fields

This section describes electric fields.

5.2.1 Allowable electric field intensities for server systems

Each equipment has an allowable electric field intensity of 3 V/m, where 1 V/m is 120
dB/V.
An electric field intensity of 1 V/m is a typical level encountered in a low-level
electromagnetic radiation environment. For the example purpose:
In transmissions from a typical radio or TV station located 1 km (3000 ft) away or
farther
In transmissions from a low-power transceiver

5.2.2 Conditions for using mobile phones

Keep the main unit doors closed and stay 1.7 m (5 ft) away from the main unit before
using mobile phones.
Moreover, since mobile phones automatically emit electromagnetic waves in response
to incoming messages, Fujitsu recommends keeping mobile phones switched off near
the computing equipment.
62 C120-H007-08EN
Page 81

5.3 Static Electricity

5.3 Static Electricity
Static electricity may be charged and kept in a person's body by the following
conditions.
Through friction between shoes and floor as a result of his or her walking.
Through friction between clothes and body.
Also, carts may be charged as a result of their movement.
When this static electricity is discharged to server system at a high charge voltage, it
could cause a malfunction. Hence, take steps to make the computer room less
susceptible to electrostatic generation.

5.3.1 Recommended electrostatic voltage for a computer room

It is best if the static electricity charge on human bodies or carts be kept at such level
or lower that there is no discomfort to the people when there is a discharge. For
example it will not cause pain in the skin at discharge. This is variable from one
individual to another, but it is generally about 2.0 kV (kilovolt). An electrostatic
discharge of 2.0 kV or lower should not affect the server system.

5.3.2 Electrostatic control in the computer room

To inhibit the generation of static electricity, choose flooring that is rarely charged
with static electricity and use humidity control. For computer room flooring surface
materials, see Table 2.3 For suggested computer room humidities, see Table 4.1 and
Section 4.3.3, "Temperature and humidity recommendations for computer rooms."
C120-H007-08EN 63
Page 82
Page 83

CHAPTER 6 Power Supply Facilities

1
This chapter deals with input power requirements, power supply facilities,
uninterruptible power supplies (UPS), grounding, distribution panels, distribution
lines, and the share of responsibility for construction work.
Operational stability of a server system requires a good-quality power supply. Power
supply facilities that match the power requirements of the server system must be
selected to suit the importance of the server system's operation.

6.1 Input Power Requirements

This section describes input power requirements, power requirement, and a method
for calculating rush current.

6.1.1 Input power requirements

Input power at the input power terminals of equipment must satisfy the requirements
listed in Table 6.1. For unit-specific input voltage, power requirement, and rush
current specifications, refer to the relevant Installation Planning Manual.
C120-H007-08EN 65
Page 84
CHAPTER 6 Power Supply Facilities
Table 6.1 Input power requirement
Item Requirement
Input voltage Number of phases Abroad
Single-phase two-wire 100 V, 110 V, 115 V, 120 V
Single-phase two-wire 200 V, 208 V, 220 V, 230 V, 240 V
Three-phase three-wire 200 V, 208 V,220 V, 230 V, 240 V
Three-phase four-wire 380 V, 400 V, 415 V neutral conductor
connected to ground
Voltage regulation From +10% to -10% of the input voltage or less
Instantaneous input voltage variation
Instantaneous input interruption
Input frequency 50 Hz or 60 Hz
Frequency regulation +2% to -4% of the input frequency
Input voltage imbalance 5% or less (three-phase input)
Voltage waveform distortion 10% or less
Power capacitance Depends on each unit specifications
Rush current Depends on each unit specifications
+15% to -20% of the input voltage or less in 0.5 second or shorter
10ms or less

6.1.2 Calculating the power required

For the purpose of selecting the kind of power supply facilities required, calculate the
total power requirement of every unit in the system by consulting the relevant
Installation Planning Manual.

6.1.3 Calculating the rush current

The rush current calculation assists with selecting a UPS. Calculate the rush current in
the power-on sequence by consulting the documentation for each component. The
case that more than one device may turn on at the same time should also be
considered.
If the UPS is started up rapidly, the UPS startup could occur as rush current flows
from the server system line filter and before the server system power controller begins
to properly supply power to the server system. In this case, the UPS may detect
overcurrent. Try to use an UPS that allows for a slow startup.
66 C120-H007-08EN
Page 85

6.2 Power Supply Facilities

6.2 Power Supply Facilities
Select power supply facilities after considering the input power requirements of the
server system (see Section 6.1), the availability of a power source at the installation
site, and the operational importance of the server system.

6.2.1 Kinds and uses of power supply facilities

Power supply facilities are used for converting voltages, reducing leakage current,
keeping a server system free from power failures, shaping waveforms, converting
frequencies, and reducing harmonic currents.
Table 6.2 lists the kinds of power supply facilities available, and their fitness for
particular uses.
Table 6.2 Types of available power supply facilities and usage
Use
Type of power
supply facility
Commercial power source
Transformer 
UPS: Constant commercial type
UPS: Constant inverter type
Voltage
conversion



Freedom
from power
failures
Waveform
shaping
Reduction
of
harmonic
current
Note: means fit.
means not fit.
Among the uses of power supply facilities, the reduction in leakage current and
freedom from power failures are highlighted below.
C120-H007-08EN 67
Page 86
CHAPTER 6 Power Supply Facilities
(1) Reduction in leakage current
Computers are equipped with a line filter in their power input terminals to absorb both
external and internal electric noise. If a common commercial power source is
connected to a computer, leakage current will flow to the grounding cable of the
computer.
In a system built by connecting multiple computers with one another, the total leakage
current flowing to ground across the system must be compliant with IEC60435 and
IEC60364.
Notes:
Leakage current can be classified as follows:
Equipment leakage current:
This equipment-inherent current is observed at equipment grounding terminals
when power with the frequency/voltage characteristics of a commercial power
supply is applied. The values of the current must be in accordance with the
operating manuals for the respective equipment.
Ground leakage current:
This current flows to ground in actual system operation, and it differs from the
total equipment leakage current depending on the method of distribution line
grounding. The floating current of the system has an effect on this current.
The rules of ground leakage current in the system must meet the rules of each country
and be compliant with IEC60435 and IEC60364.
(2) Freedom from power failures
Use of a UPS is recommended to keep the server system safe from power failures,
instantaneous voltage drops, or instantaneous interruptions in the commercial power
supply.
68 C120-H007-08EN
Page 87
6.2 Power Supply Facilities

6.2.2 Selecting power supply facilities

Select power supply facilities to suit the available power source at the installation site,
and the operational importance of the server system.
(1) Systems that cannot tolerate service disruption
a) Power failure-free system
Use of a UPS is mandatory for server systems that cannot tolerate service disruption
at any time even the instantaneous interruption or power failure of commercial
power supply.
Figure 6.1 shows the configuration example of a server system which uses a UPS.
Note: Secondary side of UPS is isolated or neutral.
Figure 6.1 System based on a UPS
b) Long-duration power failure-free system
A UPS combined with an independent power generator provides a solution for
longer term power failures as shown in Figure 6.2.
Figure 6.2 System based on a UPS and an independent power generator
C120-H007-08EN 69
Page 88
CHAPTER 6 Power Supply Facilities
(2) Systems that can tolerate a service disruption
If a server system can tolerate a service disruption caused by power interruption or
voltage variation, install a transformer dedicated to that system, isolated from the
secondary terminals if the system runs at 200 V or grounded to a neutral phase wire if
it runs at 400 V.
a) Transformers dedicated to 200 V server systems
Table 6.3 contains descriptions of the types of transformers dedicated to 200 V
server systems and their schematic views.
Table 6.3 Transformers for 200 V server systems
Case
A dedicated high-to-low-voltage transformer can be installed.
High-to-low-voltage transformer that is shared with other power supplies.
Transformer dedicated
to a server system
Install a contact prevention transformer that has an output voltage of 200 V and is dedicated to the server system. The secondary terminal of the transformer shall be isolated.
Install a separate transformer that has an output voltage of 200 V and is dedicated to the server system near the distribution panel. The secondary terminal of the transformer shall be isolated.
Schematic view
High-voltage line
High-voltage line
70 C120-H007-08EN
Page 89
6.2 Power Supply Facilities
b) Transformers dedicated to 400 V server systems
Table 6.4 describes the types of high-to-low-voltage transformers that can be
dedicated to 400 V server systems and those that can be shared with other power
supplies.
Table 6.4 Transformers dedicated to 400 V server systems
Transformer
Case
A dedicated high-to-low-voltage transformer can be installed.
A high-to-low-voltage transformer that is shared with other power supplies.
dedicated to a server
system
Install a transformer in the power receiving/ transformer room. If the power receiving/ transformer room is not close to the computer room, install a separate transformer near the distribution panel in the computer room. The secondary terminal of the separate transformer shall be grounded to a neutral phase wire.
Install a separate transformer near the distribution panel in the computer room, with its secondary terminal grounded to a neutral phase wire.
Schematic view
High-voltage line
High-voltage line
C120-H007-08EN 71
Page 90
CHAPTER 6 Power Supply Facilities

6.3 UPS Requirements

An Uninterruptible Power Supply system (UPS) supplies power to server systems
constantly under power failures even in a huge magnitude of power failures.
Instantaneous voltage drop of commercial power generally occur by thunder. The
chance of occurrence of instantaneous voltage drop depends on the location of the site
(in Japan, three to four times in a year). The typical interruption time of power supply
is said between 0.07 to 2 seconds.
Generally, power distribution circuits of server systems can maintain the performance
under power interruption at magnitude of 0.01 second. When the lower power supply
or power interruption sustains over 0.01 seconds, operation of server systems is
disabled, and this may lead to system down. It is important to avoid instantaneous
system down since longer time must be spent to reactivate the server systems, and
applications may interrupt for long time accordingly. Not only that, important files
may be destructed. Use UPS to prevent such instantaneous power failures. UPS
distributes to components in the server system in operation by its built-in batteries
under such interruption of commercial power supply.
UPS examination items are explained below.
Note that if the UPS is installed regardless of the following requirements, the
requirements of the server system and the performance of the UPS mismatch, and the
user's server system may be damaged, or significant data may be destroyed.
UPS load specifications
Prediction of rush current and load variation of the equipment
UPS terminating requirements
Effect of high-frequency noise
Life-span of a UPS built-in battery
Discharge of UPS built in battery
Requirements for power interruption
Leakage current
Load rating
Power rating (for printer connection)
Checking the UPS environmental specifications and the warranty term
72 C120-H007-08EN
Page 91
6.3 UPS Requirements
(1) UPS load specifications
Some server systems adopt condenser-input type rectifier circuit (commutating load)
as shown in Figure 6.3.
Figure 6.3 Commutating load circuit
Rectifier of this type turns the current waveform of a server system into a distorted
waveform containing harmonics. The amplified crest (peak value) of distorted
waveform containing harmonics is about 2.8 times to the effective value.(It means
that if effective value is 10 A, the peak value is 28 A.) If the UPS is so designed that
output voltage is regulated by resistor, driving at 50% or less of the UPS's deliverable
output voltage is needed. Make sure that the rectifier has a mechanism that lowers the
distortion (peak value is about 2.8 times) current passing the rectifier to 10%
(distortion factor) at peak wave (crest factor). Also check this point for loads of
transformers and motors (linear amplifier).
As the conclusion, the recommendable UPS rectifier load specification is:
Linear load or Peak-to-valley ratio (at peak) must not exceed 2.8
(2) Prediction of rush current and load variation of the equipment
Turning on the power to connected devices generates rush current. For example, a
component operating at a steady-state current of 3 A may generate a current of
0-P
30 A
UPS output voltage fluctuation must stay within ±15%. Special attention must be
paid to cases where multiple devices are connected, since the rush current generated
by each connected device at its power-on time may cause a UPS voltage drop, and
other components in operation may stop operating. Therefore, the rush current and
load variability of the components must be reviewed together with the overcurrent
detection specifications of the UPS.
when it is turned on. Even when connected devices generate rush current, the
C120-H007-08EN 73
Page 92
CHAPTER 6 Power Supply Facilities
(3) UPS terminating requirements
UPS terminates when incorrect current is loaded (overload). When such circumstance
is made, the output cutoff circuit (which prevents distribution of current exceeding the
specification) activates to drop voltage, and the UPS stops. Some components may
generate higher load to stop UPS. If this occurs, input power to the components is
switched to direct commercial power since UPS stops when overloaded. As switching
back input power to UPS, rush current is generated, then UPS stops again. As such,
power supply can not be steady. To avoid this, review the specified overload value
that UPS activates the circuit (the mean and peak values), and make sure to operate
under the value.
(4) Effect of high-frequency noise
Normally, UPS uses microwave switching method. For this reason, output noise and
input noise around the components and reflection noise are generated. These noises
may cause components failure and data destruction of the nearby recording media.
Therefore, following must be reviewed when selecting a UPS.
Input and output noise around the component is 4 V
Reflection noise is 70 dB or less
Do not place magnetic tapes and floppy disks on the UPS
(5) Life-span of a UPS built-in battery
The main type of battery built into a UPS is a lead-acid battery. Lead-acid batteries
have their own life-spans, and therefore Fujitsu recommends a service support
agreement for immediate battery replacement.
(6) Discharge of UPS built in battery
Once a lead-acid battery is completely discharged, sufficient voltage cannot be
generated even when recharged. If this occurs, replace the battery. The battery in a
UPS that supplies its control power from the battery may be in the discharged state if
left on but not used for about five days because a power failure occurred or because it
P-P
or less
was in storage. To prevent this, the battery switch must be turned off when the UPS is
not in use. Some UPSs automatically turn off the battery switch when they stop
operating.
74 C120-H007-08EN
Page 93
6.3 UPS Requirements
8
kW
10
kVA
-------------------
0.8=
8
kW
power factor of load
------------------------------------------------------------
load kVA
=
(7) Requirements for power interruption
The following specifications must be checked for selection of a UPS.
Most of UPS cannot be started up under circumstance of power interruption. If
such startup is required, request the UPS manufacturer for modification.
When part of system components are connected to UPS, and the rest of the
components are connected directly to the commercial power, the components
connected to commercial power supply may generate incorrect signals, and the
components malfunction may occur.
(8) Leakage current
If commercial power supply facilities have leakage shut-off unit, leak current from a
UPS may activate the shut-off unit. In such case, the following actions must be
considered.
Increase the trigger voltage of the shut-off unit.
Use a shut-off unit which does not trip easily by microwave leakage current.
Install an insulation transformer between the UPS and the commercial power
outlet.
(9) Load rating
When operating UPS in higher power factor than its rated power factor, use the UPS
in reduced output voltage. For example, a rating power factor of a 10 kVA/8 kW rated
UPS is 0.8.
When connecting load lower than 0.8 power factor to the UPS, up to 10 kVA load can
be connected. When connecting load grater than 0.8 power factor, reduce the load to
the calculated value by the formula below.
C120-H007-08EN 75
Page 94
CHAPTER 6 Power Supply Facilities
(10)Power rating (for printer connection)
If a printer is connected to a UPS, selecting a UPS whose power capacitance is
sufficient to connect a printer is needed, by taking account of the following
precautions.
Input voltage variation of a printer depends on the printing mode.
Some laser printers requires few times higher than their rated power in toner
fixing.
(11)Checking the UPS environmental specifications and the warranty
term
Other precautions and requirements:
UPS environmental specification
- Input capacity
- Grounding phase in input one-line grounding
- External dimensions
- Mass
- Amount of heat dissipation
- Earthquake-proofing actions
- Noise level
- Input/output terminals (connector)
Warr anty term

6.4 Grounding

Grounding should be planned to suit the following:
Grounding equipment in the computer room
Grounding other equipment
Grounding LAN devices
Grounding-plate method
Grounding of surge absorbers
For the last, see Chapter 7, "Protection Against Lightning."
76 C120-H007-08EN
Page 95
6.4 Grounding

6.4.1 Grounding equipment in the computer room

For grounding equipment, connect a protective grounding conductor to the dedicated
grounding electrode.
Transformer
Protective grounding conductor
Secondary single wire ground of the transformer
Flow of leakage current
Line filter
Equipment
Figure 6.4 Method of grounding equipment
If possible, do not connect an equipment cabinet to the ground built into the floor of
the computer room (such as a mesh ground) through a separate wire. This could
cause stray current to flow into the system and cause a malfunction.
The grounding method for the server systems depends on whether the computer room
is in a building that conforms to the Grounding Regulation Types or the International
Electrotechnical Commission (IEC) standards.
(1) Grounding in the buildings in conformance with the Grounding
Type :
The grounding conditions for the server systems to be installed in the domestic or
others' buildings which are in conformance with the Grounding Type with A to D type
are as follows:
To run the server systems in the computer room stable, the dedicated grounding cable
facility must be prepared for each server system to prevent extraneous noise coming
from the distribution line or other grounding system lines.
The grounding cable facilities to be installed in the computer room must have
dedicated grounding electrode. Primarily, the wiring from the dedicated grounding
electrode through the distribution panel in the computer rooms must be implemented
by the metal conduit installation method using the special insulated cables. This
ground wiring facility must not be shared with other facilities.
The grounding resistance of the dedicated grounding electrode and the grounding
trunk cable must be as follows:
Grounding resistance of the dedicated grounding electrode: 10 or less
Size of the grounding trunk cable: 22 mm2 (AWG 4) or more
C120-H007-08EN 77
Page 96
CHAPTER 6 Power Supply Facilities
S 16 (AWG5)
16 (AWG5) < S 35 (AWG2)
S > 35 (AWG2)
S
16 (AWG5)
S/2
(2) Grounding in the buildings conforming with the IEC standards.
In the installation of server systems to the buildings based on the equal potential
bonding principal of the IEC standards, the server systems must be grounded using
grounding facility shared with other facilities.
Because the ground is not the dedicated one, the grounding trunk cables for the server
systems are preferably branched from the grounding box near the grounding electrode
(the main grounding terminal).
If there is no way other than branching from the omnibus grounding cable nearest to
the server systems, please consult with Fujitsu Facility section because noise
countermeasure which requires expertise is required in most cases.
Primarily, the wiring of grounding trunk cable must be implemented by the metal
conduit installation method using special insulated cables. Follow Table 6.5 for the
cable size.
Table 6.5 Specification of the grounding trunk cable for server systems
(in the buildings complying to the IEC standards)
Cross section of the phase
conductor of the facilities
S (mm2)
Minimum cross section of the
grounding trunk cable
Sp (mm2)
Note: The term "the phase conductor of the facilities"
represents a conductor of a phase of a power supply
cable which is led into the distribution panel.
78 C120-H007-08EN
Page 97
6.4 Grounding

6.4.2 Grounding other equipment

Table 6.6 summarizes the requirements for other equipment grounding facilities.
Table 6.6 Requirements for other equipment grounding facilities
Item Requirements
Grounding electrode • A dedicated grounding electrode for other equipment is recommended.
If a dedicated grounding electrode is not available, a grounding trunk cable may be branched from a shared grounding electrode.
• The grounding resistance must not exceed 100 .
• Keep the grounding electrode at least 10 m (33 ft) apart from the lightning arrester grounding electrode.
Grounding trunk cable
Distribution panel grounding terminal
• Use an insulated wire at least 5.5 mm
• Use the grounding trunk cable dedicated to other equipment. Do not share with other facilities.
• Isolate the primary grounding terminal and branch grounding terminals for other equipment from the distribution panel frame.
2
(AWG10).
C120-H007-08EN 79
Page 98
CHAPTER 6 Power Supply Facilities

6.4.3 Grounding LAN devices

Grounding LAN devices which share the same signal ground to the same grounding
system and those which have different signal ground to different grounding systems.
The method for grounding LAN devices, details of the separation of the LAN
transmission line signal ground from the connected devices, and typical modes of
LAN connection and grounding are described below.
(1) Grounding LAN devices
The signal ground of each device signal line is separated at the point of connection
with the LAN transmission line for both optical and metal cables.
A coaxial cable transmission line must be grounded at one point per segment.
LAN devices may be grounded to different grounding systems individually or in
groups.
A group of devices connected to the same transceiver must be grounded to the same
grounding system.
(2) Separation of the LAN transmission line signal ground from the
connected devices
The LAN transmission line signal ground is separated from the ground of the
connected devices. Table 6.7 details the separation of the signal ground.
Table 6.7 Details of the separation of the LAN transmission line signal ground (SG)
Transmission line Cable type Details
Fibre Optical fibre Separation by opto-electrical and
10Gigabit Ether Optical fibre
Gigabit Ether Optical fibre
FDDI Optical fibre
100BASE-T Paired Separation by transceiver's signal
Gigabit Ether Optical fibre
electrical-opto-signal converters
transformer
(3) Typical modes of LAN connection and grounding
Typical LAN connections and grounding are described below with regard to
100Base-T.
Figure 6.5 shows a typical 100Base-T connection. The transmission route of a twisted
pair cable is not to be grounded.
80 C120-H007-08EN
Page 99
6.4 Grounding
Figure 6.5 Typical 100 Base-T connection

6.4.4 Grounding-plate method

In shared ground facilities complying with the International Electrotechnical
Commission (IEC) standards, noise generated by other electronic facilities such as
electronic devices, air conditioning facilities and elevators may penetrate the server
systems through the shared ground facilities' cables. In some cases, this can be
prevented by the grounding-plate method. In the grounding-plate method, a
grounding plate (see note below) is laid under the raised floor near the power
distribution panel, as shown in Figure 6.6. This reduces electrical noise from other
equipment. For whether the site requires implementation of grounding-plate, consult
with the Facility section.
Note: Grounding-plate conducts by high-capacitance conductive sheet covering
over copper plate.
C120-H007-08EN 81
Page 100
CHAPTER 6 Power Supply Facilities
Figure 6.6 Grounding-plate method
82 C120-H007-08EN
Loading...