
WE-IPAD2/IPAD2NB INSTALLATION INSTRUCTIONS
FSR
1. 2.
REMOVE COVER FROM BASE AS SHOWN.
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
SECURE BASE TO WALL (SEE BACK OF THIS PAGE).
COVER
(WE-IPAD
SHOWN)
1
2
3.
INSTALL PROVIDED SILICON SLEEVE TO
IPAD (SUPPLIED BY CUSTOMER) AND
MAKE ELECTRICAL CONNECTIONS AS
REQUIRED. POSITION IPAD IN BASE AND
SUPPORT IPAD FROM FALLING.
BASE
COVER
BASE
IPAD INTERFACE
CABLE (SUPPLIED
BY CUSTOMER)
USE SHORT SHELL TYPE
4.
REINSTALL COVER AS SHOWN WHILE
SUPPORTING IPAD FROM FALLING.
SUPPORT IPAD WHILE
REINSTALLING COVER
FINISHED WALL
(8) CABLE
PASS-THRU
OPENING
5.
TIGHTEN (2) LOCKING SCREW
COMPLETELY WITH SUPPLIED
DRIVER. DO NOT OVER TIGHTEN.
LOCKING SCREW
ACCESS HOLE
2G BOX
2
1
IPAD (SUPPLIED
BY CUSTOMER)
WITH SILICON
SLEEVE (SUPPLIED)
43796 LIT1402
LOCKING SCREW
ACCESS HOLE

FSR
2G ELECTRICAL BOX (E.B.)
SHOWN FOR REFERENCE
(SUPPLIED BY CUSTOMER)
(8) CABLE PASS-THRU OPENING
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
ALTERNATE VESA
MOUNTING HOLES
ALTERNATE 2G E.B. MOUNTING HOLES
ALTERNATE 2G E.B. MOUNTING HOLES
(SUPPLIED BY CUSTOMER)
ALTERNATE VESA
MOUNTING HOLES
(8) CABLE
PASS-THRU
OPENING
2G ELECTRICAL BOX (E.B.)
SHOWN FOR REFERENCE
ALTERNATE 2G E.B. MOUNTING HOLE
OR
ALTERNATE 2G E.B. MOUNTING HOLES
ALTERNATE
2G E.B.
MOUNTING
HOLES
ALTERNATE 2G E.B. MOUNTING HOLE