FSR TM-IPAD-TR User Manual

Page 1
6a.
PLACE IPAD ONTO FRONT PANEL AND CONNECT CONNECTOR.
FSR
TM-IPAD-TR / TM-IPAD-TRS / TM-IPMINI-TR / TM-IPMINI-TRS INSTALLATION INSTRUCTIONS
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
POSITION IPAD BETWEEN TABS OF FRONT COVER
FRONT
PANEL
REAR VIEW OF FRONT PANEL
INSTALL #6-32 NUT
DISABLE
IPAD (SUPPLIED
BY CUSTOMER)
IPAD
(SUPPLIED) TO
POWER
SWITCH LEVER
CONNECT TO IPAD BEFORE
REASSEMBLY OF FRONT PANEL
FRONT PANEL
1.
REMOVE BASE COVER.
2a.
STANDARD BASE MOUNTING:
IF REQUIRED DRILL 3/4 DIA. HOLE FOR CABLE PASS-THRU
9 POSSIBLE MOUNTING
HOLES (RECOMMEND
3 MINIMUM), TRANSFER
(RETAIN FOR
REASSEMBLY)
(2) COVER SCREW
(RETAIN FOR
REASSEMBLY)
PATTERN FROM BASE
DRILL 5/64 DIA. PILOT HOLES FOR
#8 SCREWS (SUPPLIED)
TO SURFACE.
6b.
REINSTALL FRONT PANEL AS SHOWN BELOW WHILE HOLDING IPAD IN PLACE. SECURE WITH ORIGINAL SCREWS.
(4) COVER SCREW
USE PENCIL
(ERASER END)
TO ACTIVATE
POWER SWITCH
REMOVE COVER FOR
HORIZONTAL / VERTICAL
LOCKING OPTION S
ENSURE SWITCHES ARE PROPERLY SET BEFORE REASSEMBLY OF FRONT PANEL
FOR VERTICAL
LOCK POSITION
COVER SHOWN REMOVED
FOR HORIZONTAL LOCK POSITION
HORIZONTAL / VERTICAL
LOCKING OPTIONS
(ALL MODELS)
ROTATE IPAD HORIZONTALLY
OR VERTICALLY AND INSTALL
#6-32 x 1/2 LG PAN-HEAD
SCREW (SUPPLIED) IN
CORRESPONDING HOLE
2b.
SWIVEL BASE MOUNTING:
BEFORE INSTALLING LOCK ING
SCREWS, CENTER IPAD ON
C
B
INSERT #6-32 x 1/4 LG
PAN-HEAD SCREW
(SUPPLIED) TO DISABLE
SWIVEL FEATURE
SWIVEL RANGE
NO SCREWS -
HOLE A ­HOLE B ­HOLE C -
BASE (AS SHOWN)
A
A
C
B
180° 140° 104° 90°
REMAINING HOLES FROM
DRILL 5/64 DIA. PILOT HOLES FOR #8 SCREWS (SUPPLIED)
INSERT #6-32 x 1/4 LG PAN-HEAD SCREWS (SUPPLIED) TO CORRESPONDING LETTERS TO CHANGE SWIVEL RANGE
MOUNTING HOLES ACCESSED
DRILL PILOT HOLES
FOR DIMENSIONED
HOLES AND TRANSFER
BASE TO SURFACE.
RECOMMEND DRILLING
3/4 DIA. HOLE FOR
CABLE PASS-THRU
SWIVEL UNIT
CLOCKWISE TO
ACCESS HOLE
HOLE ACCESSIBLE
WHEN UNIT IS
SWIVELED
BY SWIVELING UNIT
(SEE BELOW)
3.46 MIN.
1.50 1.50
COUNTER-
1.50 1.50
43036 LIT1452
Page 2
3.
SKIP TO STEP 4 IF NOT USING USB CHARGER SNAP-IN CONNECTOR OPTION.
3a.
REMOVE SNAP-IN BRACKET.
SNAP-IN BRACKET
(INCLUDED)
4.
REASSEMBLE BASE COVER.
(2) COVER SCREW
BASE COVER
5.
(4) COVER SCREW
(RETAIN FOR
REASSEMBLY)
REMOVE FRONT COVER.
FRONT COVER (RETAIN FOR REASSEMBLY)
#6 FLAT-HEAD SCREW
(RETAIN FOR REASSEMBLY)
3b.
INSTALL USB CHARGER SNAP-IN CONNECTOR ONTO SNAP-IN BRACKET. CONNECT USB END TO USB CHARGER.
INCLUDED APPLE
CORD, USB END
USB CHARGER
SNAP-IN CONNECTOR
(USB CHARGER KIT
SOLD SEPARATELY)
3c.
REINSTALL SNAP-IN BRACKET ASSEMBLY.
SNAP-IN BRACKET
WIRING STRAIN RELIEF TIE WRAP HOLE
ROUTE POWER SUPPLY WIRING THRU CABLE PASS-THRU (RECOMMENDED) AND MAKE NECESSARY TERMINAL CONNECTIONS (SEE KIT INSTALLATION INSTRUCTIONS)
HIGHLY RECOMMENDED WIRES BE ROUTED THRU CABLE ACCESS HOLE FOR SWIVEL UNITS
ROUTE USB CONNECTOR (OR POWER SUPPLY WIRING IF USING USB CHARGER KIT) THRU COVER OR CABLE ACCESS HOLE AS REQUIRED
6.
REASSEMBLE FRONT PANEL WITH IPAD. EXPLODED VIEW FOR REFERENCE. SEE BACK PAGE FOR FINAL ASSEMBLY.
IPAD (SUPPLIED BY CUSTOMER)
(4) COVER SCREW
SNAP-IN BRACKET
ASSEMBLY
#6 FLAT-HEAD SCREW
FRONT COVER
IPAD CONNECTOR (SUPPLIED)
Loading...