T3-AC2CP
INSTALLATION
INSTRUCTIONS
FSR
1.00" MIN. TO 2-1/2" MAX.
TABLE THICKNESS
PRE-CUT 3.50" DIA.
HOLE IN TABLE
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
T3-AC2CP
SUB-ASS'Y
ASSEMBLED VIEW
4.25
2.13
#6 / #8 MOUNTING
SCREW HOLES
(5) CABLE
TIE TAB
(6) #6 / #8 x 1/2"
WOOD SCREW
(2) LOCKING NYLON NUT
(2) #6-32 x 2.00" or 3.00" LONG
THREADED ROD
7.50
2.13
1.63
3.25
UNDERSIDE VIEW OF SHROUD
DROP THE 'T3-AC2CP' SUB-ASS'Y
2
INTO THE HOLE IN THE TABLE
(COVER ORIENTATION IS PRE-SET
BY THE SHROUD INSTALLATION).
INSTALL CLAMP SHROUD TO UNDERSIDE
1
OF TABLE HOLE WITH (6) WOOD SCREWS
AS SHOWN. ORIENT PER DESIRED
COVER SWING DIRECTION.
PASS THE DESIRED-LENGTH (2) LONG
3
THREADED ROD THRU THE SHROUD AND
THREAD INTO SHORT STANDOFFS IN THE
SUB-ASS'Y. TURN THE LOCKING NYLON NUT
UP SNUG AGAINST THE SHROUD BASEPLATE
TO PULL THE SUB-ASS'Y DOWN COMPLETELY
INTO PLACE IN THE PRE-CUT 3.50" DIA. HOLE.
MAKE ELECTRICAL CONNECTIONS AS
4
REQUIRED AND TIE-WRAP CABLES TO
TIE-TABS. ENSURE CONNECTORS IN THE
SUB-ASS'Y CAN BE PULLED OUT 3'-0"
PRIOR TO SECURING CABLES TO TIE TABS.
5.50
3.25
1.63
3.50" DIA. THRU
HOLE ON TABLE
43169 LIT1285A