CB-12P INSTALLATION INSTRUCTIONS
FSR
1.
PRIOR TO CEILING INSTALLATION, DETERMINE MOUNTING LOCATION OF THE FLANGE FOR THE PROJECTOR MOUNT. IF DEFAULT FACTORY LOCATION WILL BE USED, PROCEED TO STEP 2. IF CHANGING TO ALTERNATE LOCATION, FOLLOW STEPS 1a THRU 1b.
NOTE: FLANGE LOCATION CAN BE CHANGED AFTER CEILING INSTALLATION.
1a. 1b.
REMOVE POLE MOUNT PLATE COVER (COVER SCREWS LOCATED IN INTERIOR OF CEILING BOX).
PART OF
POLE MOUNT
PLATE COVER
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
COVER SCREWS LOCATED IN INTERIOR OF CEILING BOX
(2) PLUG
MAKE SURE PROJECTOR
MOUNT SET SCREW IS
ORIENTED TOWARDS THE
ACCESS HOLE IN THE POLE
SET SCREW ACCESS HOLE
POLE MOUNT PLATE COVER
REMOVE FLANGE AND MOVE TO ALTERNATE LOCATION. CHANGE PLUG LOCATION ON THE POLE MOUNT PLATE COVER AS REQUIRED, AND RE-INSTALL THE PLATE COVER WITH THE (2) ORIGINAL SCREWS.
(4) #10-32 x 3/4" LONG HEX SCREW
(4) #10 LOCK WASHERS
MOUNT PLATE
POLE MOUNT FLANGE
POLE MOUNT PLATE
2.
INSTALL CB-12P TO A STRUCTURAL CEILING ABLE TO SUPPORT FIVE TIMES THE NOTED GROSS WEIGHT. USE APPROPRIATE MOUNTING METHODS BASED ON LOCAL BUILDING CODES. INSTALL SAFETY CABLE AS REQUIRED BY LOCAL BUILDING CODES. ROUTE CONDUITS TO BOX AS REQUIRED.
NOTE: MAXIMUM GROSS WEIGHT - 110 LBS
NOTE: THREADED ROD IS THE RECOMMENDED CEILING BOX MOUNTING SUSPENSION (SHOWN), TO MINIMIZE FIXTURE TILTING DUE TO THE WEIGHT OF ANY SUSPENDED EQUIPMENT.
14 GA. STEEL TIE WIRE MAY BE USED
(SUPPLIED BY CUSTOMER OR USE FSR KIT)
AT 70,000 PSI TENSILE STRENGT H OR
BETTER AS REQUIRED BY BUILDING CODES.
AVAILABLE KITS (SOLD SEPARATELY): CB-MNT1 - CABLE INSTALLATION KIT CB-THRD - THREADED ROD INSTALLATION KIT
NOTE: WIRES SUPPORT CEILING
BOX, AND ARE NOT
THREADED ROD OR CABLE TO
BE PLUMB WITH CEILING AND FLOOR
SAFETY CABLES
ROUTE CONDUIT
(SUPPLIED BY
CUSTOMER) TO
KNOCKOUTS
AS REQUIRED
STRUCTURAL MEMBER
ALL MOUNTING HARDWARE SUPPLIED BY CUSTOMER
STRUCTURAL CHANNEL
BRACKET - FSR'S THREADED ROD INSTALLATION KIT (HARDWARE SUPPLIED BY CUSTOMER)
43189 LIT1317B
3.
INSTALL 10-3/4" x 15-1/4" DROP CEILING PANEL MATERIAL INTO DOOR OF CB-12P. BEND CAPTURE TABS OVER PANEL TO HOLD PANEL IN PLACE.
4.
REMOVE SHELF AND MOUNT ELECTRONICS TO SHELF. USE HOLE/SLOT PATTERN ON SHELF TO MOUNT EQUIPMENT. ADDITIONAL HOLES MAY BE REQUIRED. RE-INSTALL SHELF INTO CB-12P. MAKE ELECTRICAL CONNECTIONS AS REQUIRED.
NOTE: MAXIMUM LOAD PER SHELF - 20 LBS EACH
LOOSEN SCREWS (4 PER SHELF) TO REMOVE SHELVES
10-3/4" x 15-1/4"
DROP CEILING
PANEL MATERIAL
(SUPPLIED BY
CUSTOMER)
(4) CAPTURE TAB
TO OPEN CB-12P DOOR
LOOSEN SCREWS
NOTE: MAXIMUM PROJECTOR LOAD INCUDING MOUNTED ACCESSORIES - 50 LBS
b
a
DISCONNECT
SAFETY CABLE
TO COMPLETELY
REMOVE DOOR
5.
INSTALL PROJECTOR MOUNT PIPE INTO CB-12P. SECURE PIPE WITH SET SCREW. FINISH INSTALLATION PER MANUFACTURER'S PROJECTOR MOUNT INSTRUCTIONS.
DOOR IS
REMOVABLE.
(a) PUSH DOOR
UP TOWARDS
CEILING AND
(b) PUSH AWAY
FROM
PROJECTOR
PANEL MOUNT -
REVERSE
PROCEDURE
TO INSTALL
LOOSEN SHELF
SCREWS. (a) PUSH
SHELF TOWARDS
PROJECTOR
MOUNT AND (b) SHELF
WILL DROP DOWN OUT
OF CB-12P
(2) SHELF
a
b
NOTE: THE CENTER OF MASS OF SUSPENDED EQUIP­ MENT MUST BE WITHIN A 2.5" RADIUS OF THE CENTER LINE OF THE FLANGE MOUNT OF THE CEILING BOX.
PROJECTOR MOUNT PIPE
(SUPPLIED BY CUSTOMER)
PROJECTOR MOUNT SET SCREW ACCESS HOLE