OPT/i TPS DoppelkopfUmschaltung WF
OPT/i TPS twin-head switchover WF
OPT/i TPS commutation double tête
WF
Installationsanleitung
DEENFR
MIG/MAG-Stromquelle
Installations instructions
MIG/MAG Power source
Instructions d'installation
Source de courant MIG/MAG
42,0410,2240003-27022017
2
Allgemeines
DE
Sicherheit
VoraussetzungFür den Betrieb des Einbau-Sets OPT/i TPS Doppelkopf-Umschaltung WF darf das Ein-
bau-Set OPT/i TPS 2. SpeedNet Connector (4,100,812) nicht an der Stromquelle vorhanden sein.
Der Betrieb des Einbau-Sets OPT/i TPS Doppelkopf-Umschaltung WF ist ausschließlich
für manuelle Anwendungen vorgesehen.
WARNUNG! Ein elektrischer Schlag kann tödlich sein. Vor Öffnen des Gerätes
-Netzschalter in Stellung - O - schalten
-Gerät vom Netz trennen
-ein verständliches Warnschild gegen Wiedereinschalten anbringen
-mit Hilfe eines geeigneten Messgerätes sicherstellen, dass elektrisch geladene Bauteile (z.B. Kondensatoren) entladen sind
WARNUNG! Fehlerhaft durchgeführte Arbeiten können schwerwiegende Personen- und Sachschäden verursachen. Nachfolgend beschriebene Tätigkeiten dürfen nur von geschultem Fachpersonal durchgeführt werden! Beachten Sie das
Kapitel „Sicherheitsvorschriften“ in der Bedienungsanleitung der Stromquelle und
der Systemkomponenten.
Lieferumfang
Erforderliche
Werkzeuge
OPT/i TPS Doppelkopf-Umschaltung WF
-Schraubendreher TX 25
-Schraubendreher TX 20
(5)
(1)
(2)
(3)
(4)
(6)
(1)1 Abdeckung
(2)2 Schrauben TX20 PT M4 x 12 mm
(3)2 Schrauben TX20 4 x 10 mm
(4)2 Spreizanker
(5)7 Kabelbinder
(6)1 Kabelbaum mit Schalter und
SpeedNet-Anschluss
ohne Abbildung:
1 Einbauanleitung
1 Schaltplan
Klebeetiketten
3
OPT/i TPS Doppelkopf-Umschaltung WF einbauen
VorbereitungStromquelle ausschalten und vom Netz trennen
1
Rechten Seitenteil der Stromquelle entfernen
2
HINWEIS! Für eine bessere Zugänglichkeit gegebenenfalls den Print NT601 ausbauen.
Der Aus/Einbau des Prints NT601 ist in der Serviceanleitung TPSi / WF / CU beschrieben:
-42,0426,0174,DE (deutsch)
-42,0426,0174,EN (englisch)
OPT/i TPS
Doppelkopf-Um-
(1)
1
schaltung WF einbauen
1
2
8-poliges Kabel (1) vom Stecker X2 am
Print NT241 abstecken
4-poliges Kabel (2) vom Stecker X1 am
Print NT601 abstecken
2
(2)
8-poliges Kabel (1) mit dem entspre-
(1)
3
chenden Gegenstück vom Kabelbaum
(3) zusammenstecken
4-poliges Kabel (2) mit dem entspre-
4
3
3
chenden Gegenstück vom Kabelbaum
(3) zusammenstecken
4
4
(3)
(2)
4
6
(5)
(4)
4-poligen Stecker (4) vom Kabelbaum
5
am Print NT601 an X1 anstecken
8-poligen Stecker (5) vom Kabelbaum
6
DE
am Print NT241 an X2 anstecken
5
Schwarzes Kabel (6) vom Kabelbaum
7
am Print SMB an X23 anstecken
(6)
7
“TOP“
(7)(8) (9)
Blindabdeckung an der Rückseite ent-
8
fernen
WICHTIG! Beim Einsetzen des SpeedNet-Anschlusses darauf achten, dass
die Markierung “TOP“ oben ist!
SpeedNet-Anschluss (8) vom Kabel-
9
baum von innen nach außen in die Öffnung einsetzen
SpeedNet-Anschluss (8) mit 2
10
Schrauben TX20 PT M4 x 12 mm aus
dem Lieferumfang fixieren
Anzugsmoment = 1,8 Nm
5
Abdeckung (10) über dem SpeedNet-
11
Anschluss anbringen
11
(10)
Blindabdeckung von innen nach außen
12
entfernen
12
13
WICHTIG! Beim Einsetzen des Schalters
darauf achten, dass die Spitze des Schalter-Drehknopfes nach unten zeigt.
Schalter des Kabelbaums von innen
13
nach außen in die Öffnung einsetzen
6
18
18
14
18
16
14
16
18
Schalter mit 2 Schrauben TX20 4 x 10
14
mm aus dem Lieferumfang an der
Stromquelle fixieren
Den Bereich unter dem Schalter fett-
15
und staubfrei reinigen
Klebeetiketten anbringen
16
2 Spreizanker anbringen
17
Kabelbaum verlegen und mit Kabelbin-
18
der fixieren
abschließend:
Rechten Seitenteil der Stromquelle
19
montieren
DE
17
17
7
Schalterpositionen mittels der
beiden Drahtvorschübe überprüfen
Drahtvorschübe an der Stromquelle anschließen
1
Schweißbrenner an den Drahtvorschüben anschließen
2
Netzkabel der Stromquelle am Netz anstecken
3
Stromquelle einschalten
4
Schalterpositionen überprüfen:
5
-Schweißparameter an einem Drahtvorschub einstellen
-Brennertaste drücken
der Drahtvorschub arbeitet:
die eingestellte Schalterposition steuert den aktuell ausgewählten Drahtvorschub
an
der Drahtvorschub arbeitet nicht:
Schalterposition verändern
Drahtvorschub-Umschaltzeit von 10 Sekunden abwarten
Brennertaste erneut drücken
je nach Schalterstellung die beiden SpeedNet-Anschlüsse an der Geräte-Rückseite
6
mit den entsprechenden Klebeetiketten kennzeichnen.
WICHTIG! Nach jedem Umschalten der Drahtvorschübe und vor jeder ersten Schweißung
müssen die für den jeweiligen Drahtvorschub passenden Schweißparameter eingestellt
werden.
Die Einstellung der Schweißparameter kann an der Stromquelle oder am Drahtvorschub
erfolgen.
VoraussetzungSoll die Option OPT/i TPS Doppelkopf-Umschaltung WF in eine Stromquelle mit vorhan-
dener Option OPT/i TPS 4x Switch SpeedNet eingebaut werden, muss an der Stromquelle
zusätzlich die Option OPT/i TPS SpeedNet Connector (4,100,910,CK) eingebaut sein.
WICHTIG!
-Schalter nur an der Geräte-Vorderseite
-SpeedNet-Anschluss nur an der Geräte-Rückseite
Reihenfolge:
1.OPT/i TPS SpeedNet Connector einbauen
2.OPT/i TPS Doppelkopf-Umschaltung WF einbauen
VorbereitungStromquelle ausschalten und vom Netz trennen
1
Rechten Seitenteil der Stromquelle entfernen
2
HINWEIS! Für eine bessere Zugänglichkeit gegebenenfalls den Print NT601 ausbauen.
Der Aus/Einbau des Prints NT601 ist in der Serviceanleitung TPSi / WF / CU beschrieben:
WICHTIG! Beim Einsetzen des SpeedNet-Anschlusses darauf achten, dass
die Markierung “TOP“ oben ist!
SpeedNet-Anschluss (2) vom Kabel-
2
baum von innen nach außen in die Öffnung einsetzen
SpeedNet-Anschluss (2) mit 2
3
Schrauben TX20 PT M4 x 12 mm (1)
und (3) aus dem Lieferumfang fixieren
Anzugsmoment = 1,8 Nm
9
Abdeckung (4) über dem SpeedNet-
4
Anschluss anbringen
4
(4)
Blindabdeckung von innen nach außen
5
entfernen
12
13
WICHTIG! Beim Einsetzen des Schalters
darauf achten, dass die Spitze des Schalter-Drehknopfes nach unten zeigt.
Schalter des Kabelbaums von innen
6
nach außen in die Öffnung einsetzen
10
10
14
16
14
16
Schalter mit 2 Schrauben TX20 4 x 10
7
mm aus dem Lieferumfang an der
Stromquelle fixieren
Den Bereich unter dem Schalter fett-
8
und staubfrei reinigen
Klebeetiketten anbringen
9
2-poligen Stiftkontakt vom Kabelbaum
10
oben an einem freien Steckplatz am
Print SCRATSW anstecken
DE
SCRATSW
11
11
1
1
11
SCRATSW
2-polige Kabel vom SpeedNet-An-
11
schluss an der Geräte-Rückseite mit
den 2 freien Steckern vom Schalter an
der Geräte-Vorderseite zusammenstecken
11
13
13
12
13
13
13
12
13
13
2 Spreizanker anbringen
12
Kabelbaum verlegen und mit Kabelbin-
13
der fixieren
abschließend:
Rechten Seitenteil der Stromquelle
14
montieren
Schalterpositionen mittels der
beiden Drahtvorschübe überprüfen
Drahtvorschübe an der Stromquelle anschließen
1
Schweißbrenner an den Drahtvorschüben anschließen
2
Netzkabel der Stromquelle am Netz anstecken
3
Stromquelle einschalten
4
Schalterpositionen überprüfen:
5
-Schweißparameter an einem Drahtvorschub einstellen
-Brennertaste drücken
der Drahtvorschub arbeitet:
die eingestellte Schalterposition steuert den aktuell ausgewählten Drahtvorschub
an
der Drahtvorschub arbeitet nicht:
Schalterposition verändern
Drahtvorschub-Umschaltzeit von 10 Sekunden abwarten
Brennertaste erneut drücken
je nach Schalterstellung die beiden SpeedNet-Anschlüsse an der Geräte-Rückseite
6
mit den entsprechenden Klebeetiketten kennzeichnen.
WICHTIG! Nach jedem Umschalten der Drahtvorschübe und vor jeder ersten Schweißung
müssen die für den jeweiligen Drahtvorschub passenden Schweißparameter eingestellt
werden.
Die Einstellung der Schweißparameter kann an der Stromquelle oder am Drahtvorschub
erfolgen.
12
General
Safety
RequirementsThe OPT/i TPS twin-head switchover WF installation set is not compatible with power
sources with the OPT/i TPS 2nd SpeedNet connector installation set (4,100,812) fitted.
The OPT/i TPS twin-head switchover WF installation set is only designed for manual applications.
Scope of supply
WARNING! An electric shock can be fatal. Before opening the device
-Turn the mains switch to the "O" position
-Unplug the machine from the mains
-Put up an easy-to-understand warning sign to stop anybody inadvertently
switching it back on again
-Using a suitable measuring instrument, check to make sure that electrically
charged components (e.g. capacitors) have discharged
WARNING! Work that is carried out incorrectly can cause serious injury and damage. The following activities must only be carried out by trained and qualified personnel. Read the "Safety rules" chapter in the power source and system
components operating instructions.
(1)
(2)
(3)
(4)
(5)
(1)One cover
(2)Two screws TX20 PT M4 x 12 mm
(3)Two screws TX20 4 x 10 mm
(4)Two expansion bolts
(5)Seven cable ties
(6)One cable harness with switch and
SpeedNet connector
EN
OPT/i TPS twin-head switchover WF
Tools required-TX 25 screwdriver
-TX 20 screwdriver
Not shown:
One set of Installation Instructions
One Circuit Diagram
Adhesive labels
(6)
13
Installing the OPT/i TPS twin-head switchover WF
Preparatory workSwitch off the power source and disconnect it from the mains
1
Remove the right side panel from the power source
2
NOTE! You may have to remove PC board NT601 for better accessibility.
See the TPSi / WF / CU Service Instructions for a guide on removing and installing
PC board NT601:
-42,0426,0174,DE (German)
-42,0426,0174,EN (English)
Installing the
OPT/i TPS
(1)
Unplug the 8-pin cable (1) from
1
connector X2 on PC board NT241
twin-head
Unplug the 4-pin cable (2) from
switchover WF
2
connector X1 on PC board NT601
1
2
(2)
Connect the 8-pin cable (1) to the res-
(1)
3
pective counterpart of the cable harness (3)
Connect the 4-pin cable (2) to the res-
4
3
3
pective counterpart of the cable harness (3)
4
4
(3)
(2)
14
6
(5)
Plug the 4-pin connector (4) from the
5
cable harness into X1 on PC board
NT601
Plug the 8-pin connector (5) from the
6
cable harness into X2 on PC board
NT241
(6)
5
EN
(4)
Plug the black cable (6) from the cable
7
harness into X23 on the SMB PC
board
7
“TOP“
(7)(8) (9)
Remove blanking cover on the rear
8
IMPORTANT! When inserting the
SpeedNet connector, ensure that the
side marked "TOP" is at the top.
Insert the SpeedNet connector (8) on
9
the cable harness into the opening
from the inside
Secure the SpeedNet connector (8)
10
using the two
TX20 PT M4 x 12 mm screws supplied
Tightening torque = 1.8 Nm
15
Fit the cover (10) over the SpeedNet
11
connector
11
(10)
Remove the blanking cover from the
12
inside
12
13
IMPORTANT! When inserting the switch,
ensure that the tip of the adjusting knob on
the switch points down.
Insert the cable harness switch into the
13
opening from the inside
16
18
18
14
18
16
14
16
18
Secure the switch to the power source
14
with the two TX20 4 x 10 mm screws
supplied
Clean the area under the switch to en-
15
sure it is free of dust and grease
Attach the adhesive labels
16
Attach the two expansion bolts
17
Route the cable harness and secure
18
using cable ties
Finally:
Attach the right side panel to the power
19
source
EN
17
17
17
Checking the
switch positions
using the two
wire feeders
Connect the wire feeders to the power source
1
Connect the welding torch to the wire feeders
2
Plug in the power source mains cable
3
Switch on the power source
4
Check the switch positions:
5
-Set the welding parameters on one of the wire feeders
-Press the torch trigger
The wire feeder is working:
The set switch position actuates the currently selected wire feeder
The wire feeder is not working:
Change the switch position
Wait for the wire feeder switchover time of 10 seconds
Press the torch trigger again
Depending on the switch position, label the two SpeedNet connectors on the rear of
6
the device with the corresponding adhesive labels.
IMPORTANT! Every time the wire feeders are switched over and before starting the first
welding operation the corresponding welding parameters for the respective wire feeder
must be set.
The welding parameters can either be set on the power source or the wire feeder.
18
Installing the OPT/i TPS twin-head switchover WF
with the OPT/i TPS 4x Switch SpeedNet option
RequirementsIf the OPT/i TPS twin-head switchover WF option should be installed on a power source
that has the OPT/i TPS 4x Switch SpeedNet option, the OPT/i TPS SpeedNet connector
(4,100,910,CK) option must also be installed on the power source.
IMPORTANT!
-Switch only on the front of the device
-SpeedNet connector only on the rear of the device
Sequence:
1.Install the OPT/i TPS SpeedNet connector
2.Install the OPT/i TPS twin-head switchover WF
Preparatory workSwitch off the power source and disconnect it from the mains
1
Remove the right side panel from the power source
2
NOTE! You may have to remove PC board NT601 for better accessibility.
See the TPSi / WF / CU Service Instructions for a guide on removing and installing
PC board NT601:
-42,0426,0174,DE (German)
-42,0426,0174,EN (English)
EN
Installing the
OPT/i TPS
twin-head
switchover WF
with the OPT/i
TPS 4x Switch
SpeedNet option
fitted
“TOP“
(1)(2) (3)
Remove blanking cover on the rear
1
IMPORTANT! When inserting the
SpeedNet connector, ensure that the
side marked "TOP" is at the top.
Insert the SpeedNet connector (2) on
2
the cable harness into the opening
from the inside
Secure the SpeedNet connector (2)
3
using the two
TX20 PT M4 x 12 mm screws (1) and
(3) supplied
Tightening torque = 1.8 Nm
19
Fit the cover (4) over the SpeedNet
4
connector
4
(4)
Remove the blanking cover from the
5
inside
12
13
IMPORTANT! When inserting the switch,
ensure that the tip of the adjusting knob on
the switch points down.
Insert the cable harness switch into the
6
opening from the inside
20
10
14
16
14
16
Secure the switch to the power source
7
with the two TX20 4 x 10 mm screws
supplied
Clean the area under the switch to en-
8
sure it is free of dust and grease
Attach the adhesive labels
9
Plug the pin contact (2-pin) at the top of
10
the cable harness into a free slot on the
SCRATSW PC board
EN
SCRATSW
11
11
1
1
11
SCRATSW
Connect the 2-pin cable on the Speed-
11
Net connector at the rear of the device
to the two free connectors on the
switch at the front of the device
21
13
13
12
13
13
13
12
13
13
Attach the two expansion bolts
12
Route the cable harness and secure
13
using cable ties
Finally:
Attach the right side panel to the power
14
source
Checking the
switch positions
using the two
wire feeders
Connect the wire feeders to the power source
1
Connect the welding torch to the wire feeders
2
Plug in the power source mains cable
3
Switch on the power source
4
Check the switch positions:
5
-Set the welding parameters on one of the wire feeders
-Press the torch trigger
The wire feeder is working:
The set switch position actuates the currently selected wire feeder
The wire feeder is not working:
Change the switch position
Wait for the wire feeder switchover time of 10 seconds
Press the torch trigger again
Depending on the switch position, label the two SpeedNet connectors on the rear of
6
the device with the corresponding adhesive labels.
IMPORTANT! Every time the wire feeders are switched over and before starting the first
welding operation the corresponding welding parameters for the respective wire feeder
must be set.
The welding parameters can either be set on the power source or the wire feeder.
22
Généralités
Sécurité
Condition préalable
AVERTISSEMENT ! Un choc électrique peut être mortel. Avant d'ouvrir l'appareil
-commuter l’interrupteur du secteur en position - O -
-débrancher l'appareil du secteur
-apposer un panneau d'avertissement compréhensible afin de prévenir toute
remise en marche
-s'assurer, à l'aide d'un appareil de mesure approprié, que les composants à
charge électrique (condensateurs par ex.) sont déchargés
AVERTISSEMENT ! Les erreurs en cours d'opération peuvent entraîner des
dommages corporels et matériels graves. Les opérations décrites ci-après
doivent être effectuées exclusivement par du personnel qualifié et formé ! Respecter les prescriptions du chapitre « Consignes de sécurité » figurant dans les
Instructions de service de la source de courant et des composants du système.
Pour l'utilisation du kit d'installation OPT/i TPS commutation double tête WF, le kit d'installation OPT/i TPS 2e SpeedNet Connector (4,100,812) ne doit pas se trouver sur la source
de courant.
Le kit d'installation OPT/i TPS commutation double tête WF est uniquement conçu pour
des applications manuelles.
FR
Contenu de la livraison
Outils nécessaires
OPT/i TPS commutation double tête WF
-Tournevis TX 25
-Tournevis TX 20
(5)
(1)
(2)
(3)
(4)
(6)
(1)1 cache
(2)2 vis TX20 PT M4 x 12 mm
(3)2 vis Tx20 4 x 10 mm
(4)2 chevilles d'ancrage
(5)7 attache-câbles
(6)1 faisceau de câbles avec com-
mutateur et connecteur SpeedNet
Non illustrés :
Instructions d'installation
1 schéma de connexions
Étiquettes collantes
23
Montage de l'OPT/i TPS commutation double tête
WF
PréparationDésactiver la source de courant et la débrancher du secteur
1
Retirer le panneau latéral droit de la source de courant
2
REMARQUE! Pour un meilleur accès, démonter le circuit imprimé NT601 le cas
échéant.
Le montage et le démontage du circuit imprimé NT601 sont décrits dans les instructions d'entretien TPSi/WF/CU :
-42,0426,0174,DE (allemand)
-42,0426,0174,EN (anglais)
Montage de
l'OPT/i TPS
(1)
Débrancher le câble à 8 pôles (1) de la
1
fiche X2 sur le circuit imprimé NT241
commutation
Débrancher le câble à 4 pôles (2) de la
double tête WF
2
fiche X1 sur le circuit imprimé NT601
1
2
(2)
Raccorder le câble à 8 pôles (1) à son
(1)
3
pendant sur le faisceau de câbles (3)
Raccorder le câble à 4 pôles (2) à son
4
pendant sur le faisceau de câbles (3)
3
3
4
4
(3)
(2)
24
6
(5)
Brancher la fiche 4 pôles (4) du fais-
5
ceau de câbles à X1 sur le circuit imprimé NT601
Brancher la fiche 8 pôles (5) du fais-
6
ceau de câbles à X2 sur le circuit imprimé NT241
5
(6)
7
“TOP“
(4)
Brancher le câble noir (6) du faisceau
7
de câbles à X23 sur le circuit imprimé
SMB
Retirer la fausse prise sur la face arriè-
8
re
FR
(7)(8) (9)
IMPORTANT ! Lors de la mise en place du connecteur SpeedNet, veiller à
ce que le marquage « TOP » se trouve
en haut !
Insérer le connecteur SpeedNet (8) du
9
faisceau de câbles de l'intérieur vers
l'extérieur dans l'ouverture
Fixer le connecteur SpeedNet (8) avec
10
les 2
vis TX20 PT M4 x 12 mm fournies
Couple de serrage = 1,8 Nm
25
Poser le cache (10) au-dessus du
11
connecteur SpeedNet
11
(10)
Retirer la fausse prise de l'intérieur
12
vers l'extérieur
12
13
IMPORTANT ! Lors de la mise en place du
commutateur, veiller à ce que la pointe du
bouton du commutateur soit dirigée vers le
bas.
Insérer le commutateur du faisceau de
13
câbles de l'intérieur vers l'extérieur
dans l'ouverture
26
18
18
14
18
16
14
16
18
Fixer le commutateur à la source de
14
courant à l'aide des 2 vis Tx20 4 x
10 mm fournies
Nettoyer la zone sous le commutateur
15
afin qu'elle soit exempte de graisses et
de poussières
Poser les étiquettes collantes
16
Poser les 2 chevilles d'ancrage
17
Poser le faisceau de câbles et le fixer
18
avec l'attache-câbles
Pour terminer :
Remonter le panneau latéral droit de la
19
source de courant
FR
17
17
27
Contrôler les positions du commutateur au
moyen des deux
dévidoirs
Raccorder les dévidoirs à la source de courant
1
Raccorder la torche de soudage aux dévidoirs
2
Brancher le câble secteur de la source de courant au secteur
3
Activer la source de courant
4
Contrôler les positions du commutateur :
5
-Définir les paramètres de soudage sur un dévidoir
-Appuyer sur la gâchette de torche
Le dévidoir fonctionne :
la position définie pour le commutateur commande le dévidoir actuellement sélectionné
Le dévidoir ne fonctionne pas :
modifier la position du commutateur
Patienter 10 secondes (temps de commutation du dévidoir)
Appuyer à nouveau sur la gâchette de torche
Poser les étiquettes collantes correspondantes sur les deux connecteurs SpeedNet
6
au dos de l'appareil, en fonction de la position du commutateur.
IMPORTANT ! Après chaque commutation des dévidoirs et avant chaque premier soudage, les paramètres de soudage correspondant aux dévidoirs respectifs doivent être définis.
Il est possible de définir les paramètres de soudage au niveau de la source de courant ou
du dévidoir.
28
Montage de l'OPT/i TPS commutation double tête
WF avec l'option OPT/i TPS 4x Switch SpeedNet
Condition préalable
PréparationDésactiver la source de courant et la débrancher du secteur
Si l'option OPT/i TPS commutation double tête WF doit être montée dans une source de
courant avec l'option OPT/i TPS 4x Switch SpeedNet, l'option OPT/i TPS SpeedNet
Connector (4,100,910,CK) doit également être montée.
IMPORTANT !
-Commutateur sur la face avant de l'appareil uniquement
-Connecteur SpeedNet sur la face arrière de l'appareil uniquement
Déroulement :
1.Monter l'OPT/i TPS SpeedNet Connector
2.Monter l'OPT/i TPS commutation double tête WF
1
Retirer le panneau latéral droit de la source de courant
2
REMARQUE! Pour un meilleur accès, démonter le circuit imprimé NT601 le cas
échéant.
Le montage et le démontage du circuit imprimé NT601 sont décrits dans les instructions d'entretien TPSi/WF/CU :
-42,0426,0174,DE (allemand)
-42,0426,0174,EN (anglais)
FR
Montage de
l'OPT/i TPS
commutation
double tête WF
avec l'option
OPT/i TPS 4x
Switch SpeedNet
“TOP“
(1)(2) (3)
Retirer la fausse prise sur la face arriè-
1
re
IMPORTANT ! Lors de la mise en place du connecteur SpeedNet, veiller à
ce que le marquage « TOP » se trouve
en haut !
Insérer le connecteur SpeedNet (2) du
2
faisceau de câbles de l'intérieur vers
l'extérieur dans l'ouverture
Fixer le connecteur SpeedNet (2) avec
3
les 2
vis TX20 PT M4 x 12 mm (1) et (3) fournies
Couple de serrage = 1,8 Nm
29
Poser le cache (4) au-dessus du
4
connecteur SpeedNet
4
(4)
Retirer la fausse prise de l'intérieur
5
vers l'extérieur
12
13
IMPORTANT ! Lors de la mise en place du
commutateur, veiller à ce que la pointe du
bouton du commutateur soit dirigée vers le
bas.
Insérer le commutateur du faisceau de
6
câbles de l'intérieur vers l'extérieur
dans l'ouverture
30
10
14
16
14
16
Fixer le commutateur à la source de
7
courant à l'aide des 2 vis Tx20 4 x
10 mm fournies
Nettoyer la zone sous le commutateur
8
afin qu'elle soit exempte de graisses et
de poussières
Poser les étiquettes collantes
9
Brancher la broche de contact à
10
2 pôles du faisceau de câbles en haut
sur un emplacement de connexion disponible sur le circuit imprimé
SCRATSW
FR
SCRATSW
11
11
1
1
11
SCRATSW
Raccorder le câble à 2 pôles du
11
connecteur SpeedNet à l'arrière de
l'appareil aux 2 fiches du commutateur
disponibles à l'avant de l'appareil
31
13
13
12
13
13
13
12
13
13
Poser les 2 chevilles d'ancrage
12
Poser le faisceau de câbles et le fixer
13
avec l'attache-câbles
Pour terminer :
Remonter le panneau latéral droit de la
14
source de courant
Contrôler les positions du commutateur au
moyen des deux
dévidoirs
Raccorder les dévidoirs à la source de courant
1
Raccorder la torche de soudage aux dévidoirs
2
Brancher le câble secteur de la source de courant au secteur
3
Activer la source de courant
4
Contrôler les positions du commutateur :
5
-Définir les paramètres de soudage sur un dévidoir
-Appuyer sur la gâchette de torche
Le dévidoir fonctionne :
la position définie pour le commutateur commande le dévidoir actuellement sélectionné
Le dévidoir ne fonctionne pas :
modifier la position du commutateur
Patienter 10 secondes (temps de commutation du dévidoir)
Appuyer à nouveau sur la gâchette de torche
Poser les étiquettes collantes correspondantes sur les deux connecteurs SpeedNet
6
au dos de l'appareil, en fonction de la position du commutateur.
IMPORTANT ! Après chaque commutation des dévidoirs et avant chaque premier soudage, les paramètres de soudage correspondant aux dévidoirs respectifs doivent être définis.
Il est possible de définir les paramètres de soudage au niveau de la source de courant ou
du dévidoir.
32
FR
33
34
FR
35
FRONIUS INTERNATIONAL GMBH
Froniusplatz 1, A-4600 Wels, Austria
Tel: +43 (0)7242 241-0, Fax: +43 (0)7242 241-3940
E-Mail: sales@fronius.com
www.fronius.com
www.fronius.com/addresses
Under http://www.fronius.com/addresses you will find all addresses
of our Sales & service partners and Locations
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.