Fronius Symo 3, Fronius Eco Installation Instructions Manual

Page 1
/ Perfect Charging / Perfect Welding / Solar Energy
42,0426,0172,EN 009-21032016
Fronius Symo 3 - 8,2 kW Fronius Eco
Installations instructions
Grid-connected inverter
EN
Page 2
2
Page 3
3
EN
Contents
Installation location and position ................................................................................................................ 5
Explanation of safety symbols .............................................................................................................. 5
Reliability............................................................................................................................................... 5
Proper use ............................................................................................................................................ 6
Inverter installation location .................................................................................................................. 7
Explanation of symbols - installation position ....................................................................................... 8
General comments regarding inverter installation location................................................................... 9
Attaching the Wall Bracket......................................................................................................................... 10
Safety.................................................................................................................................................... 10
Selecting wall plugs and screws ........................................................................................................... 10
Recommended screws ......................................................................................................................... 10
Opening the inverter ............................................................................................................................. 10
Fixing the wall bracket to a wall ............................................................................................................ 11
Fitting the wall bracket to a mast or support ......................................................................................... 12
Fitting the wall bracket to metal supports.............................................................................................. 12
Do not warp or deform the wall bracket ................................................................................................ 12
Connecting the inverter to the public grid (AC) .......................................................................................... 13
Safety.................................................................................................................................................... 13
Monitoring the Grid ............................................................................................................................... 13
Type of AC cable .................................................................................................................................. 13
Connecting aluminum cables................................................................................................................ 13
AC terminals ......................................................................................................................................... 14
Cross-section of the AC cable .............................................................................................................. 14
Connecting the inverter to the public grid (AC)..................................................................................... 14
Maximum fuse rating on alternating current side.................................................................................. 16
Notes regarding inverters with single and multiple MPP trackers.............................................................. 17
Inverter with single MPP tracker ........................................................................................................... 17
Inverter with multiple MPP trackers ...................................................................................................... 17
Connecting solar module strings to the inverter (DC) ................................................................................ 19
Safety.................................................................................................................................................... 19
General comments regarding solar modules........................................................................................19
DC terminals ......................................................................................................................................... 20
Connecting aluminum cables................................................................................................................ 20
Connecting solar module strings to the inverter (DC)........................................................................... 21
Data communication .................................................................................................................................. 24
Routing data communication cables..................................................................................................... 24
Clipping the Inverter onto the Wall Bracket................................................................................................ 26
Attaching the inverter to the wall bracket.............................................................................................. 26
Starting for the first time............................................................................................................................. 28
Starting the inverter for the first time..................................................................................................... 28
Notes regarding software updates ............................................................................................................. 30
Notes regarding software updates........................................................................................................ 30
USB Stick as a Data Logger and for Updating Inverter Software .............................................................. 31
USB stick as a data logger.................................................................................................................... 31
Data on the USB stick........................................................................................................................... 31
Data volume and storage capacity........................................................................................................ 32
Buffer memory ...................................................................................................................................... 32
Suitable USB flash drives ..................................................................................................................... 33
USB stick for updating the inverter software......................................................................................... 33
Remove USB stick................................................................................................................................ 34
Notes regarding maintenance.................................................................................................................... 35
Maintenance ......................................................................................................................................... 35
Cleaning................................................................................................................................................ 35
Serial Number Sticker for Customer Use................................................................................................... 36
Serial number sticker for customer use ................................................................................................ 36
Page 4
4
Page 5
5
EN
Installation location and position
Explanation of safety symbols
If you see any of the symbols depicted in the "Safety rules" chapter, special care is re­quired.
Reliability
DANGER! Indicates immediate and real danger. If it is not avoided, death or se-
rious injury will result.
WARNING! Indicates a potentially dangerous situation. Death or serious injury may result if appropriate precautions are not taken.
CAUTION! Indicates a situation where damage or injury could occur. If it is not avoided, minor injury and/or damage to property may result.
NOTE! Indicates a risk of flawed results and possible damage to the equipment.
IMPORTANT! Indicates tips for correct operation and other particularly useful information.
It does not indicate a potentially damaging or dangerous situation.
WARNING! Incorrect operation or poorly executed work can cause serious injury or damage. Commissioning of the hybrid system may only be carried out by trained personnel in accordance with the technical regulations. Read the installa­tion and operating instructions before installing and commissioning the equip­ment.
WARNING! Shoddy workmanship can cause serious injury and material dam­age. Overvoltage protection must only ever be installed and connected by a qual­ified electrical engineer. Follow the safety rules! Make sure that both the AC side and the DC side of the inverter are de-energised before carrying out any installation or connection work.
Fire prevention
CAUTION! Risk of damage to inverters and other live photovoltaic system com-
ponents due to poor or unprofessional installation. Poor or unprofessional installation can cause overheating of cables and terminal connections and result in arcs. These can cause heat damage, which in turn may lead to fires.
Observe the following when connecting AC and DC cables:
- Tighten all terminals to the torque specified in the operating instructions
Page 6
6
Observe the manufacturer's connection, installation and operating instructions at all times. To reduce the hazard potential to a minimum, perform all installation and connection work carefully according to the instructions and regulations. Refer to the device operating instructions / installation instructions for the tightening tor­ques to be used at the relevant terminal connections.
Proper use The solar inverter is intended exclusively to convert direct current from solar modules into
alternating current and to feed this into the public grid. Utilisation not in accordance with the intended purpose comprises:
- utilisation for any other purpose or in any other manner
- making any modifications to the inverter that have not been expressly approved by Fronius
- the installation of parts that are not distributed or expressly approved by Fronius.
Fronius shall not be liable for any damage resulting from such action. No warranty claims will be entertained.
Proper use includes:
- carefully reading and obeying all the instructions and all the safety and danger notices in the operating instructions
- performing all stipulated inspection and maintenance work
- installation as specified in the operating instructions
When designing the photovoltaic system, ensure that all of its components are operated within their permitted operating ranges at all times.
Observe all the measures recommended by the solar module manufacturer to ensure the lasting maintenance of the properties of the solar module.
Obey the regulations of the energy supply company regarding feeding energy into the grid.
- Tighten all grounding terminals (PE / GND), including free ones, to the torque specified in the operating instructions
- Do not overload cables
- Check cables for damage and verify that they are laid correctly
- Take note of the safety instructions, op­erating instructions and any local con­nection regulations
Using fastening screws, always screw the in­verter firmly to the wall bracket to the torque specified in the operating instructions. Ensure that the fastening screws are tight be­fore starting the inverter!
NOTE! Fronius will not accept any costs associated with production downtimes, installer costs, etc., that may arise as the result of a detected arc and its conse­quences. Fronius accepts no liability for fires that can occur despite the presence of the in­tegrated arc detection/extinguishing system (e.g. fires caused by a parallel arc).
NOTE! After an arc has been detected, the entire photovoltaic system must be checked for possible damage before resetting the inverter.
3
2
2.5 Nm
1
Page 7
7
EN
Inverter installa­tion location
The inverter is suitable for installation indoors.
The inverter is suitable for installation outdoors.
Its IP 65 degree of protection means that the inverter is resistant to water jets from any direction and can also be used in damp environments.
In order to minimise the heating up of the inverter, do not expose it to di­rect insolation. Install the inverter in a protected location, e.g. in the vicin­ity of the solar modules or beneath the eaves.
U
DCmax
at an altitude of: 0 to 2000 m = 1000 V 2000 to 2500 m = 900 V 2500 to 3000 m = 815 V 3000 to 3400 m = 750 V
IMPORTANT! The inverter must not be installed or used at altitudes above 3400 m.
Do not install the inverter in:
- areas where ammonia, corrosive vapours, acids or salts are present
(e.g. fertiliser stores, ventilation openings from cattle sheds, chemi­cal plants, tanneries, etc.)
As the inverter generates low levels of noise under certain operating con­ditions, it should not be installed close to living areas.
Do not install the inverter in:
- places where there is an increased risk of damage from farm ani-
mals (horses, cattle, sheep, pigs, etc.)
- stables or adjoining areas
- storage areas for hay, straw, chaff, animal feed, fertilisers, etc. All inverters are design to be dust-tight. However, in areas with a heavy
build-up of dust, the thermal efficiency may still be impaired by dust form­ing on the cooling surfaces. Regular cleaning is necessary in such situa­tions. It is therefore not recommended to mount the device in rooms or areas in which a strong formation of dust is expected.
Do not install the inverter in:
- greenhouses
- storage or processing areas for fruit, vegetables or winegrowing
products
- places used to prepare grain, green fodder or animal feeds
IP 65
2000 m
2000 m
2500 m
UDCmax = 1000 V
U
DCmax =
900 V
3000 m
2500 m
3000 m
3400 m
UDCmax = 815 V
U
DCmax =
750 V
> 3400 m
NH
3
Page 8
8
Explanation of symbols - instal­lation position
The inverter is designed to be installed vertically on a vertical wall or pil­lar.
The inverter is suitable for horizontal installation.
The inverter is suitable for installation on a sloping surface.
Do not install the inverter on a sloping surface with its connection sockets facing upwards.
Do not install the inverter at an angle on a vertical wall or pillar.
Do not install the inverter horizontally on a vertical wall or pillar.
Do not install the inverter on a vertical wall or pillar with its connection sockets facing upwards.
Do not install the inverter such that it overhangs with its connection sock­ets facing upwards.
Page 9
9
EN
General com­ments regarding inverter installa­tion location
The following criteria should be taken into account when choosing a location for the invert­er:
Do not install the inverter such that it overhangs with its connection sock­ets facing downwards.
Do not install the inverter on the ceiling.
Install only on a solid surface
Max. ambient temperatures:
-25 °C/+60 °C Relative humidity:
0 - 100% The airflow within the inverter is from the
left to the top (cold air taken in from the left, hot air dissipated out of the top).
If the inverter is installed in a switch cabinet or a similar sealed area, then forced-air ven­tilation must be provided to ensure adequate heat dissipation.
If the inverter is to be installed on the outer wall of a cattle shed, maintain a minimum all­round clearance of 2 m between the inverter and all ventilation and other openings in the building. The installation location must not be exposed to ammonia, corrosive vapours, salts or ac­ids.
200 mm
100 mm
150 mm
-25 °C - +60 °C
0 - 100 %
Page 10
10
Attaching the Wall Bracket
Safety
Selecting wall plugs and screws
Recommended screws
To install the inverter, the manufacturer recommends the use of steel or aluminium screws with a diameter of 6 - 8 mm.
Opening the in­verter
1 2
WARNING! An electric shock can be fatal. Danger due to residual voltage in ca­pacitors. Wait for the capacitors to discharge. The discharge time is five minutes.
CAUTION! Risk of damage to the inverter from dirt or water on the terminals and contacts of the connection area.
- When drilling, ensure that terminals and contacts in the connection area do not become dirty or wet.
- Without a power stage set, the wall bracket does not conform to the protec­tion class of the inverter as a whole and so must not be installed without the power stage set. The wall bracket should be protected from dirt and moisture during installa­tion.
NOTE! Degree of protection IP 65 is only applicable if
- the inverter is permanently attached to the wall bracket with screws
- the cover for the data communication area is permanently attached to the in­verter with screws.
Degree of protection IP 20 applies to the wall bracket with no inverter.
IMPORTANT! Different fixings may be required to fit the wall bracket depending on the type of underlying surface. Fixings are therefore not included in the scope of supply of the inverter. The installer is responsible for selecting the right type of fixing.
WARNING! An inadequate ground conductor connection can cause serious inju­ry or damage. The housing screws provide a suitable ground conductor connec­tion for grounding the housing and must NOT be replaced by any other screws that do not provide a reliable ground conductor connection.
1
2
Page 11
11
EN
3 4
Fixing the wall bracket to a wall
1
Tip: Install the inverter such that its display is at eye le­vel
2
3
4
3 4
1
2
3
NOTE! When mounting the wall bracket on the wall, ensure that the wall bracket is not warped or deformed.
Page 12
12
Fitting the wall bracket to a mast or support
When installing the inverter on a mast or support, Fronius recommends the "Pole Clamp" kit from Rittal GmbH (order no. SZ
2584.000). This kit enables the inverter to be installed on round or rectangular masts with the fol­lowing diameters: from 40 to 190 mm (round mast), from 50 to 150 mm (rectan­gular mast)
Fitting the wall bracket to metal supports
The wall bracket must be fastened at a minimum of four points.
1
Do not warp or deform the wall bracket
1
NOTE! When fitting the wall bracket to the wall, ensure that the wall bracket does not become warped or deformed.
Page 13
13
EN
Connecting the inverter to the public grid (AC)
Safety
Monitoring the Grid
Type of AC cable The following types of AC cable can be connected to the AC terminals of the inverter:
Connecting alu­minum cables
The AC-side terminals are designed for connecting single-wire, round, aluminum cables. The following points must be taken into account when connecting aluminum cables due to the non-conducting oxide layer of aluminum:
- Reduced rated currents for aluminum cables
- The connection requirements listed below
Connection Requirements:
Carefully clean off the oxide layer of the stripped end of the cable, e.g., using a knife.
IMPORTANTDo not use brushes, files or sandpaper. Aluminum particles may get stuck and can transfer to other cables.
After removing the oxide layer of the cable end, rub in a neutral grease, e.g., acid- and alkali-free Vaseline.
Then immediately connect it to the terminal.
Repeat the steps above whenever the cable is disconnected and then reconnected.
WARNING! Incorrect operation or poorly executed work can cause serious injury or damage. Commissioning of the inverter may only be carried out by trained per­sonnel in accordance with the technical regulations. Read the installation and op­erating instructions before installing and commissioning the equipment.
WARNING! An electric shock can be fatal. Danger due to grid voltage and DC voltage from solar modules that are exposed to light.
- Ensure that both the AC side and the DC side of the inverter are de-ener­gised before carrying out any connection work.
- Only an authorised electrical engineer is permitted to connect this equipment to the public grid.
CAUTION! Risk of damage to the inverter as a result of incorrectly tightened ter­minals. Incorrectly tightened terminals can cause heat damage to the inverter and, in turn, lead to a fire. When connecting AC and DC cables, ensure that all the terminals are tightened to the specified torque.
IMPORTANT! The resistance in the leads to the AC-side connection terminals must be as low as possible for optimal functioning of grid monitoring.
- copper or aluminium: round, single wire
- Copper: round, finely stranded up to conductor category 4
Cu / Al Cu
NOTE! Take into account local specifications when configuring cable cross sec­tions.
1
2
3
Page 14
14
AC terminals
PE Ground conductor / grounding L1-L3 Phase conductor N Neutral conductor
Max. cross-section of each conductor cab­le: 16 mm²
Min. cross-section of each conductor cable: in accordance with the fuse rating on the AC side, but at least 2.5 mm²
The AC cables can be connected to the AC terminals without ferrules.
IMPORTANT! When using ferrules for AC cables with a cross-section of 16 mm², the fer­rules must be crimped with a right-angled cross-section. The use of ferrules with insulating collars is only permitted up to a max. cable cross-section of 10 mm².
Cross-section of the AC cable
When using a standard M32 metric screw joint with reducer: cable diameter 7 - 15 mm
When using an M32 metric screw joint (reducer removed): cable diameter 11 - 21 mm (with a cable diameter of 11 mm the strain-relief force is reduced from 100 N to a maximum of 80 N)
With cable diameters greater than 21 mm, the M32 screw joint must be replaced by an M32 screw joint with a larger clamping area - item number: 42,0407,0780 - strain-relief M32x15 KB 18-25.
Connecting the inverter to the public grid (AC)
IMPORTANT! The PE ground conductor of the AC cable must be laid in such a way that it
is the last to be disconnected in the event that the strain-relief device should fail. This can be ensured, for example, by making it somewhat longer and by laying it in a loop.
AC
PEPEPE
PE
N
M32
L1
L1
L3L3L2
L2
NOTE! Form loops with the AC cables when connecting them to the AC termi­nals! When securing the AC cables using a metric screw joint, ensure that the loops do not protrude beyond the connection area. Under certain circumstances it may oth­erwise no longer be possible to close the inverter.
NOTE!
- Ensure that the grid neutral conductor is grounded. In the case of IT networks (insulated networks with no grounding) this may not be the case; it will then not be possible to use the inverter.
- In order to use the inverter, the neutral conductor must be connected. A neutral conductor that is too small may adversely affect the grid power feed operation of the inverter. The neutral conductor must therefore be the same size as the other live conductors.
Page 15
15
EN
1 2
3
If AC cables are laid over the shaft of the DC main switch or across the connection block of the DC main switch, they may be damaged when the inverter is swung in, or they may even prevent the inverter from being swung in.
IMPORTANT! Do not lay AC cables over the shaft of the DC main switch or across the con­nection block of the DC main switch!
> 200 mm
15 mm
AC ~
PE
> 250 mm
PE
PE
Cu / Al Cu
max. Class 4
1
OFF
1
2
3
Page 16
16
If overlength AC or DC cables are to be laid in loops in the connection area, attach the cables with cable ties to the eyelets provi­ded on the top and bottom of the connecti­on block.
Maximum fuse rating on alternat­ing current side
Inverters Phases AC power Maximum
fuse rating
Recommend-
ed fuse rating
Fronius Symo 3.0-3-S / -M 3 3000 W C 25 A C 10 A Fronius Symo 3.7-3-S / -M 3 3700 W C 25 A C 13 A Fronius Symo 4.5-3-S / -M 3 4500 W C 25 A C 16 A Fronius Symo 5.0-3-M 3 5000 W C 25 A C 16 A Fronius Symo 6.0-3-M 3 6000 W C 25 A C 16 A Fronius Symo 7.0-3-M 3 7000 W C 25 A C 20 A Fronius Symo 8.2-3-M 3 8200 W C 25 A C 25 A
NOTE! Local regulations, the energy supply company or other factors may re­quire an earth-leakage circuit breaker in the grid line. For this situation, a type A earth-leakage circuit breaker with a tripping current of at least 100 mA is generally adequate. In particular cases, and depending on local factors, however, the type A earth-leakage circuit breaker may trip at the wrong time. For this reason, Froni­us recommends that an earth-leakage circuit breaker that is suitable for frequency converters should be used.
max. C 25 A
AC ~
RCD
National Standards
?
Type A
YES
IΔN 100 mA
§
Page 17
17
EN
Notes regarding inverters with single and multiple MPP trackers
Inverter with sin­gle MPP tracker
Fronius Symo 3.0-3-S / 3.7-3-S / 4.5-3-S
Connecting one solar module field to an inverter with a single MPP tracker
In the case of these inverters, there are three terminals available for each DC+ and DC-. The terminals are internally connected and are not fused. This means that a maxi­mum of three strings can be connected di­rectly to the inverter in parallel. In this case, the solar modules must be able to carry at least the single reverse current (for two strings) or twice the reverse current (for three strings) (see data safety sheet for solar module).
Where there are more than three strings, an external combiner box with string fuses must be used. In this case, the strings must contain the same number of solar modules.
Inverter with mul­tiple MPP track­ers
Fronius Symo 3.0-3-M - 8.2-3-M
Connecting two solar module fields to an inverter with multiple MPP trackers
In the case of inverters with multiple MPP trackers, there are two independent DC in­puts (MPP trackers) available. These can be connected to an unequal number of so­lar modules. There are two terminals for DC+ available per MPP tracker. In total there are four ter­minals for DC-.
Connecting two to four strings in multiple MPP tracker mode: divide the strings between the two MPP tra­cker inputs (DC+1/DC+2). The DC- termi­nals can be used however you wish, as they are internally connected. When starting for the first time, set MPP TRACKER 2 to "ON" (this can also be done later in the Basic menu)
1
DC+
DC-1
DC+1
DC-
2
123
3
PV 1
Fronius Symo
3.0-3-S / 3.7-3-S / 4.5-3-S
1
DC+1
DC-1
PV 1PV 1
PV 2
DC+1
DC-2
DC+2
DC+2
DC-
1
1234
22
Fronius Symo 3.0-3-M - 8.2-3-M
Page 18
18
Connecting multiple interconnected solar module fields to an inverter with multiple MPP trackers using one lead
Single MPP tracker mode on an inverter with multiple MPP trackers:
If the strings are connected using a string combiner box and only one bus is used for connection to the inverter, the connection DC+1 (pin 2) and DC+2 (pin 1) must be jumpered. The wire diameter of the DC connection lead and the jumpering must be the same. Jumpering of the DC terminal is not neces­sary, as these terminals are jumpered inter­nally.
When starting for the first time, set MPP TRACKER 2 to "OFF" (this can also be done later in the Basic menu)
If the inverter with multiple MPP trackers is operated in single MPP tracker mode, the currents from the DC leads connected are divided evenly across both inputs.
1
DC+1
DC-1
DC+1
DC+2
DC-
1
1234
22
PV 1
PV 2
D1
D1
=
*
*
Fronius Symo 3.0-3-M - 8.2-3-M
Page 19
19
EN
Connecting solar module strings to the inverter (DC)
Safety
General com­ments regarding solar modules
To enable suitable solar modules to be chosen and to use the inverter as efficiently as pos­sible, it is important to bear the following points in mind:
- If insolation is constant and the temperature is falling, the open circuit voltage of the solar modules will increase. The open circuit voltage must not exceed 1000 V. If the open circuit voltage exceeds the specified values, the inverter will be destroyed and no warranty claims will be entertained.
- The temperature coefficients on the solar modules data sheet must be observed
- More exact values for dimensioning the solar modules can be provided by suitable cal­culation programs, like the Fronius Solar.configurator (which can be downloaded from www.fronius.com).
WARNING! Incorrect operation or poorly executed work can cause serious injury or damage. Commissioning of the inverter may only be carried out by trained per­sonnel in accordance with the technical regulations. Read the installation and op­erating instructions before installing and commissioning the equipment.
WARNING! An electric shock can be fatal. Danger due to grid voltage and DC voltage from solar modules that are exposed to light.
- Ensure that both the AC side and the DC side of the inverter are de-ener­gised before carrying out any connection work.
- Only an authorised electrical engineer is permitted to connect this equipment to the public grid.
WARNING! An electric shock can be fatal. Danger due to grid voltage and DC voltage from solar modules.
- The DC main switch is only to be used to de-energise the power stage set. The connection area is still live when the DC main switch is switched off.
- Ensure that the power stage set and connection area are disconnected from one another before carrying out any maintenance or service tasks.
- The power stage set, which is enclosed in a separate housing, must only be disconnected from the connection area when in a de-energized state.
- Maintenance and servicing in the power stage set of the inverter must only be carried out by Fronius-trained service technicians.
CAUTION! Risk of damage to the inverter as a result of incorrectly tightened ter­minals. Incorrectly tightened terminals can cause heat damage to the inverter and, in turn, lead to a fire. When connecting AC and DC cables, ensure that all the terminals are tightened to the specified torque.
CAUTION! Risk of damage to inverter from overload.
- The maximum amperage when connecting to a single DC terminal is 33 A.
- Connect the DC+ and DC- cables to the DC+ and DC- terminals on the in­verter, taking care to ensure that the polarity is correct.
- Observe the maximum DC input voltage.
NOTE! The solar modules connected to the inverter must conform to the Class A requirements of the IEC 61730 standard.
NOTE! When photovoltaic modules are exposed to light they supply current to the inverter.
NOTE! Before you connect up the solar modules you should check that the volt­age specified by the manufacturer corresponds to the actual measured voltage.
Page 20
20
DC terminals
Max. cross-section of each DC cable: 16 mm²
Min. cross-section of each DC cable:
2.5 mm²
The DC cables can be connected to the DC terminals without ferrules.
IMPORTANT! When using ferrules for DC cables with a cross-section of 16 mm², the fer­rules must be crimped with a right-angled cross-section. The use of ferrules with insulating collars is only permitted up to a max. cable cross-section of 10 mm².
Connecting alu­minum cables
The DC-side terminals are designed for connecting single-wire, round aluminum cables. The following points must be taken into account when connecting aluminum cables due to the non-conducting oxide layer of aluminum:
- Reduced rated currents for aluminum cables
- The connection requirements listed below
Connection Requirements:
Carefully clean off the oxide layer of the stripped end of the cable, e.g., using a knife.
IMPORTANT Do not use brushes, files or sandpaper. Aluminum particles may get stuck and can transfer to other cables.
After removing the oxide layer of the cable end, rub in a neutral grease, e.g., acid- and alkali-free Vaseline.
Then immediately connect it to the terminal.
Repeat the steps above whenever the cable is disconnected and then reconnected.
min. 2,5 mm² - max. 26 mm² min. 1,5 Nm - max. 1,8 Nm
DC= (-)
DC= (+)
+
+
+
-
-
-
D1
D2
D1
D1
D1
D3
NOTE! To ensure effective strain relief of the solar module strings, only use cables with identical cross-sections.
NOTE! Take into account local specifications when configuring cable cross sec­tions.
1
2
3
Page 21
21
EN
Connecting solar module strings to the inverter (DC)
The difference between the individual solar module strings must not exceed 10 V.
1 2
3 4
900V 815V 750V
CAUTION! Risk of possible dam­age to the inverter! Check the po­larity and voltage of the solar module strings before making the connection. The voltage must not exceed the following values:
- when installed between 0 and 2000 m above sea level: 1000 V
- when installed between 2001 and 2500 m above sea level: 900 V
- when installed between 2501 and 3000 m above sea level: 815 V
- when installed between 3001 and 3400 m above sea level: 750 V
NOTE! Only break out as many break points as there are cables.
1
2
1
2
1
DC+DC-
2
3
15 mm
D1
D2
D3
D1
D1
D1
4
Page 22
22
5 6
7 8
9 10
5 6
PV1 PV1 PV2 PV2
PV PV PV
3.0-3-M
3.7-3-M
4.5-3-M
5.0-3-M
6.0-3-M
7.0-3-M
8.2-3-M
3.0-3-S
3.7-3-S
4.5-3-S
7 8
9
2
DC+DC-
2
1
1
DC=
10
Page 23
23
EN
If DC cables are laid over the shaft of the DC main switch or across the connection block of the DC main switch, they may be damaged when the inverter is swung in or they may even prevent the inverter from being swung in.
IMPORTANT! Do not lay DC cables over the shaft of the DC main switch or across the connection block of the DC main switch!
If overlength AC or DC cables are to be laid in loops in the connection area, attach the cables with cable ties to the eyelets provi­ded on the top and bottom of the connecti­on block.
Page 24
24
Data communication
Routing data communication cables
IMPORTANT! Operating the inverter with an option card and two broken-out option card
divisions is not permitted. To cater for this eventuality, a relevant blanking cover (42,0405,2020) is available from Fronius as an option.
IMPORTANT! Note the following if data communication cables are being introduced into the inverter:
- depending on the number and cross-section of the data communication cables that are being introduced, take the relevant blanking plugs out of the sealing insert and in­sert the data communication cable.
- insert without fail the relevant blanking plugs into the free openings on the sealing in­sert.
1 2
3 4
1
3
1
6
7
2
4
5
2
5 - 12 Nm
3 4
Page 25
25
EN
5 6
1
6
2
4
3
5
5 6
Page 26
26
Clipping the Inverter onto the Wall Bracket
Attaching the in­verter to the wall bracket
The side sections of the housing lid are designed to function as holding and carrying han­dles.
The fastening screws in the data communication area of the inverter are used for securing the inverter to the wall bracket. Correctly tightened fastening screws are a prerequisite if proper contact is to be established between inverter and wall bracket.
1 2
WARNING! An inadequate ground conductor connection can cause serious inju­ry or damage. The housing screws provide a suitable ground conductor connec­tion for grounding the housing and must NOT be replaced by any other screws that do not provide a reliable ground conductor connection.
NOTE! For safety reasons, the inverter is fitted with a latch that prevents the in­verter from being swung into the wall bracket unless the DC main switch is switched off.
- Never attach the inverter to the wall bracket or swing it in unless the DC main switch is switched off,
- Never use force to attach the inverter or swing it in.
CAUTION! If the fastening screws are not tightened correctly, then the inverter is at risk of being damaged. Fastening screws that are not correctly tightened can result in arcs occurring when the inverter is in operation, which in turn can cause fires. Always use the specified torque when tightening the fastening screws.
1
2
Page 27
27
EN
3 4
3 4
Page 28
28
Starting for the first time
Starting the in­verter for the first time
When starting the inverter for the first time, it is necessary to select various setup settings.
If setup is interrupted before it is complete, it can be restarted by means of an AC reset. An AC reset is performed by switching the automatic circuit breaker off and then on again.
The country setup can only be set when starting the inverter for the first time. If it becomes necessary to modify the country setup at a later date, please contact your Technical Sup­port team.
1
2 3
WARNING! Incorrect operation or poorly executed work can cause serious injury or damage. Commissioning of the inverter may only be carried out by trained per­sonnel in accordance with the technical regulations. Read the installation and op­erating instructions before installing and commissioning the equipment.
AC
ON
2
I
0
3
1
1
2
1
2
2
inst. EX V0.0.03 0x0001
new DE1 V0.0.08 0x0001
1
CONFIG
Country
*
3
* Country setups 50 Hz International 50 Hz GB Great Britain 60 Hz International 60 Hz GR Ελλάδα AT1 Österreich: Anlagengröße < 3,68 kVA HU Magyarország AT2 Österreich: Anlagengröße < 13,8 kVA IE Éire / Ireland; Malta AT3 Österreich: Anlagengröße > 13,8 kVA IL ﺇﺱﺭﺍﺉﻱﻝ / ישראל / Israel AU Australia IT2 Italia: Dimensioni impianto < 6 kVA (Multist-
ring)
BE Belgique / België IT3 Italia: Dimensioni impianto > 6 kVA (Multist-
ring) BR2 Brasil: > 3,6 kVA MG50 Microgrid 50 Hz BR3 Brasil: > 6 kVA (Multistring) MG60 Microgrid 60 Hz CH Schweiz / Suisse / Svizzera / Svizra NL Nederland
Page 29
29
EN
4 5
6 7
8 9
CY Cyprus PF1 Polynésie française CZ Česko PT Portugal DE1 Deutschland: Anlagengröße < 3,68 kVA RO România DE2 Deutschland: Anlagengröße < 13,8 kVA SE Sverige DE3 Deutschland: Anlagengröße > 13,8 kVA SI Slovenija DK Danmark SK Slovensko ES España TR Türkiye ESOS Territorios españoles en el extranjero
(Spanish Overseas Islands)
ZA South Africa
FR France FROS Territoire d’Outre-Mer (French Overseas Islands)
CONFIG
4
2
1
5
2
1
6
2
1
BASIC
MPP TRACKER 2
7
8 9
Page 30
30
Notes regarding software updates
Notes regarding software updates
If the inverter is supplied with a USB stick, the inverter software must be updated as soon as the inverter has been commissi­oned:
Plug the USB stick into the data com­munication area of the inverter
Open the Setup menu Select the "USB" menu item Select "Software Update" Update the software
USB
+
3
5
4
4
1
2
2
1
2
3
4
5
Page 31
31
EN
USB Stick as a Data Logger and for Updating Invert­er Software
USB stick as a data logger
A USB stick connected to the USB A socket can act as a data logger for an inverter.
Logging data saved to the USB stick can at any time
- be imported into the Fronius Solar.access software via the included FLD file,
- be viewed directly in third-party applications (e.g., Microsoft® Excel) via the included CSV file.
Older Excel versions (up to Excel 2007) have a row limit of 65536.
Data on the USB stick
If the USB stick is being used as a data logger, three files will be created automatically:
- FRONIUS.sys system file: This file stores information from the inverter that is irrelevant to the customer. The file must not be deleted separately. Only delete all of the files (sys, fld, csv) at one time.
- DALO.fld log file: A log file for reading the data in the Fronius Solar.access software.
Further details on the Fronius Solar.access software can be found in the "DATCOM Details" operating instructions at http://www.fronius.com
- DATA.csv log file: A log file for reading the data in a spreadsheet program (e.g.: Microsoft® Excel)
Data structure on the USB stick
(1) USB root directory (2) Fronius inverters (Fronius Galvo,
Fronius Symo, Fronius Primo or Fronius Eco)
(3) Inverter number - can be set in the
Setup menu under DATCOM
If there are several inverters with the same inverter number, the three files will be sa­ved in the same folder. A digit is added to the file name as a suffix (e.g.: DALO_02.fld)
Structure of the CSV file:
USB_Drive (1)
(2)
01 (3)
02
FRONIUS.sys DALO.fld DATA.csv
FRONIUS.sys DALO.fld DATA.csv
GALVO / SYMO / PRIMO / ECO
(1) (2) (3) (4) (5) (6) (7)
Page 32
32
(1) ID (2) Inverter no. (3) Inverter type (DATCOM code) (4) Logging interval in seconds (5) Energy in watts per second, relative to the logging interval (6) Inductive reactive power (7) Capacitive reactive power (8) Average values during the logging interval (AC voltage, AC current, DC voltage,
DC current)
(9) Additional information
Data volume and storage capacity
A USB stick with a storage capacity of 1 GB can record logging data for roughly seven years at a logging interval of five minutes.
CSV file CSV files can only store 65,535 lines (data records) (up to Microsoft® Excel 2007; there is no restriction from this version onwards). At a five-minute logging interval, the 65,535 lines will be written within approximately seven months (CSV data size of approx. 8 MB). In order to avoid data loss, the CSV file should be backed up to a PC and deleted from the USB stick within this seven-month period. If the logging interval is set to a longer period, this time frame will be increased accordingly.
FLD file The FLD file should not be larger than 16 MB. This will provide enough storage capacity for approximately six years at a logging interval of five minutes. If the file exceeds the 16 MB limit, it should be backed up to a PC and all of the data on the USB stick should be deleted.
After backing up and removing the data, the USB stick can be reconnected immediately to resume recording the logging data without any further steps being required.
Buffer memory If the USB stick is unplugged (e.g. for data backup purposes), the logging data is written to
a buffer memory in the inverter. As soon as the USB stick is plugged in again, the data is copied automatically from the buff­er memory to the stick.
The buffer memory can store a maximum of six logging points. Data is only logged while the inverter is running (output greater than 0 W). The logging interval is permanently set at 30 minutes. Data can be recorded on the buffer memory for a three-hour time period as a result.
(8) (9)
NOTE! Using a full USB stick can lead to data loss or data being overwritten. When using USB sticks, always ensure that there is sufficient storage capacity on the stick.
Page 33
33
EN
When the buffer memory is full, the oldest data in the memory will be overwritten by the next batch of data.
IMPORTANT! The buffer memory requires a permanent power supply. If there is a power failure while the inverter is in operation, all the data in the buffer memory will be lost. To avoid losing data during the night, the automatic night switch-off facility must be deactivated (switch the "Night Mode" setup parameter to ON - see the section "Setting and displaying the menu items", "Viewing and adjusting parameters in the DATCOM menu item"). On the Fronius Eco, the buffer memory also functions with just a DC supply
Suitable USB flash drives
Due to the variety of USB flash drives available on the market, it cannot be guaranteed that every USB flash drive will be detected by the inverter.
Fronius recommends that only certified USB flash drives suitable for building sites are used (look out for the USB-IF logo).
The inverter supports USB flash drives with the following file systems:
- FAT12
- FAT16
- FAT32
Fronius recommends that the USB flash drives employed should only be used for record­ing logging data or updating the inverter software. The USB flash drives should not contain any other data.
USB stick for up­dating the invert­er software
With the help of the USB stick, end customers can also update the inverter software via the USB item on the SETUP menu: the update file is first saved to the USB stick, from where it is then transferred to the inverter. The update file must be saved in the root directory on the USB stick.
USB symbol on the inverter display, e.g. in display mode 'NOW':
If the inverter detects a USB flash drive, the USB symbol will appear in the top right corner of the display.
When inserting a USB flash drive, check whether the USB symbol is displayed (it may also flash).
NOTE! Please note for outdoor applications that conventional USB flash drives are often only guaranteed to work within a restricted temperature range. For out­door applications ensure that the USB flash drive also functions, for example, at low temperatures.
AC Output Power
NOW
Page 34
34
Remove USB stick
Security note concerning the removal of a USB stick:
IMPORTANT! To avoid any loss of data, a USB stick may only be removed if the fol­lowing conditions are met:
- only remove a USB stick via the 'Safely remove USB / HW' item on the SETUP menu
- the 'Data transmission' LED has stopped flashing or comes on steady.
Do not disconnect
USB-Stick
while LED is flashing!
X
Page 35
35
EN
Notes regarding maintenance
Maintenance
Maintenance and repair work must only be carried out by authorised personnel.
Cleaning Clean the inverter and the display as required with a damp cloth.
Do not use cleaning agents, abrasives or solvents to clean the inverter.
NOTE! When installed outdoors in a horizontal position: once a year, check that all screw joints are tight!
Page 36
36
Serial Number Sticker for Customer Use
Serial number sticker for cus­tomer use
The serial number of the inverter is located on the rating plate on the bottom of the in­verter. Depending on the installation position of the inverter, the serial number can be difficult to access or read, e.g. if the inverter has been installed in a dark or shaded area.
Two serial number stickers are enclosed with the inverter's installation instructions:
* 57 x 20 mm ** 67 x 20 mm
These can be affixed by the customer in a visible location of his choosing, e.g. on the front of the inverter or on the operating ins­tructions.
Application example: Serial number sticker on the operating inst­ructions and on the front of the inverter
Serial No. on rating plate
?
+
Fronius Inverter Installation
*
**
1
2
Fronius Inverter Operating Instructions
***
Page 37
37
EN
Page 38
38
Fronius Worldwide - www.fronius.com/addresses
Under http://www.fronius.com/addresses you will find all addresses of our sales branches and partner firms!
Fronius International GmbH