CHECKLIST - BACKUP POWER
Once installation, conguration, and commissioning have been successfully completed, this checklist must be worked through to ensure the back­up power changeover function and backup power mode are operating correctly.
TASK TEST CONFIRMATION
The inverter, battery, and all other necessary compo­nents have been installed and assembled correctly.
The backup power changeover unit has been installed and commissioned in accordance with the country-spe­cic installation guidelines and as outlined in the docu­mentation.
The software settings have been carried out in accor-
the documentation.
A warning notice has been put on the switch cabinet to warn that a backup power supply has been installed.
Start the inverter in grid power feed operation. Check whether the inverter starts in grid power feed
Disconnect the PV system from the public grid. This
can be e󰀨ected using a disconnecting device in the
upstream AC path or the disconnecting devices (e.g. NH fuse) of the building connection. The disconnection must occur before the Smart Meter (grid side).
Measure the voltage/frequency in the established stand­alone operation.
Reconnect the PV system to the public grid. The time taken from the end of stand-alone operation
operation and a power shift takes place. (Test duration 6 minutes).
Check whether the inverter starts in stand-alone opera­tion. The changeover can take more than 1 minute.
Set value: 230 V / ± 10 % / 53 Hz USA: 120 V / ± 10 % / 63 Hz
until the subsequent connection of the contactors in the backup power changeover unit must be at least 10 seconds. The changeover can take more than 1 minute.
Only then may the inverter resume grid power feed operation. This must be checked by the inverter (test duration 6 minutes).
I hereby conrm that the backup power changeover function and backup power mode are operating correctly.