Table of Contents
1 General 4
1.1 Product overview 5
2 Safety 6
2.1 Hazard levels of warnings 6
2.2 Permitted uses 7
2.2.1 Area of Application 7
2.2.2 Permitted fuels 7
2.3 General safety information 7
2.4 Qualification of staff 8
2.4.1 Qualification of assembly staff 8
2.4.2 Personal protective equipment for assembly staff 8
2.4.3 Qualification of operating staff 8
2.4.4 Protective equipment for operating staff 9
2.5 Design information 9
2.5.1 Standards 9
2.5.2 General information for installation room 9
3 Technology 10
3.1 Dimensions of ash transfer box for T4 / TX 10
3.2 Dimensions of ash transfer box for P4 Pellet 11
3.3 Technical specifications 12
4 Assembly 13
4.1 Materials supplied 14
4.2 Transport 14
4.3 Temporary storage 15
4.4 Installation site 15
4.5 Assembly overview 16
4.5.1 Ash transfer box for T4 / TX 16
4.5.2 Ash transfer box for P4 Pellet 17
4.5.3 Hose with screw, supporting post and gravity shaft 18
4.5.4 Standard dustbin 19
4.6 Assembling the ash discharge system 20
4.6.1 Modifying the ash transfer box for P4 Pellet (where required) 20
4.6.2 Modifying the ash transfer box for T4 / TX (where required) 21
4.6.3 Removing the boiler ash container 21
4.6.4 Assembling the ash transfer box on the T4 / TX 21
4.6.5 Assembling the ash transfer box on the P4 Pellet 22
4.6.6 Assembling the discharge pipe and supporting post 23
4.6.7 Assembling the coreless screw and drive unit with gravity shaft 24
4.6.8 Aligning the ash discharge system 26
4.6.9 Assembling the standard dustbin 27
4.7 Connecting the system 28
4.7.1 Connecting the ash discharge system to the TX 28
4.7.2 Connecting the safety switch on the standard dustbin to the TX 28
Table of Contents
2 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com