Froling T4, TX, P4 Pellet Installation And Operating Instructions Manual

Installation and Operating Instructions
Ash discharge into a standard dustbin
for T4 / TX / P4 Pellet
Translation of the original German operating and installation instructions for technicians and operators
Read and follow the instructions and safety information!
Technical changes, typographical errors and omissions reserved!
M1590214_en | Edition 05/02/2015
Table of Contents
1 General 4
1.1 Product overview 5
2 Safety 6
2.1 Hazard levels of warnings 6
2.2 Permitted uses 7
2.2.1 Area of Application 7
2.2.2 Permitted fuels 7
2.3 General safety information 7
2.4 Qualification of staff 8
2.4.1 Qualification of assembly staff 8
2.4.2 Personal protective equipment for assembly staff 8
2.4.3 Qualification of operating staff 8
2.4.4 Protective equipment for operating staff 9
2.5 Design information 9
2.5.1 Standards 9
2.5.2 General information for installation room 9
3 Technology 10
3.1 Dimensions of ash transfer box for T4 / TX 10
3.2 Dimensions of ash transfer box for P4 Pellet 11
3.3 Technical specifications 12
4 Assembly 13
4.1 Materials supplied 14
4.2 Transport 14
4.3 Temporary storage 15
4.4 Installation site 15
4.5 Assembly overview 16
4.5.1 Ash transfer box for T4 / TX 16
4.5.2 Ash transfer box for P4 Pellet 17
4.5.3 Hose with screw, supporting post and gravity shaft 18
4.5.4 Standard dustbin 19
4.6 Assembling the ash discharge system 20
4.6.1 Modifying the ash transfer box for P4 Pellet (where required) 20
4.6.2 Modifying the ash transfer box for T4 / TX (where required) 21
4.6.3 Removing the boiler ash container 21
4.6.4 Assembling the ash transfer box on the T4 / TX 21
4.6.5 Assembling the ash transfer box on the P4 Pellet 22
4.6.6 Assembling the discharge pipe and supporting post 23
4.6.7 Assembling the coreless screw and drive unit with gravity shaft 24
4.6.8 Aligning the ash discharge system 26
4.6.9 Assembling the standard dustbin 27
4.7 Connecting the system 28
4.7.1 Connecting the ash discharge system to the TX 28
4.7.2 Connecting the safety switch on the standard dustbin to the TX 28
Table of Contents
2 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4.7.3 Connecting the ash discharge system to the T4 29
4.7.4 Connecting the safety switch on the standard dustbin to the T4 29
4.7.5 Connecting the ash discharge system to the P4 Pellet 30
4.7.6 Connecting the safety switch on the standard dustbin to the P4 Pellet 30
5 Servicing 31
5.1 Inspection and cleaning 31
5.1.1 Checking the ash level in the dustbin 32
5.1.2 Emptying the dustbin 33
5.1.3 Checking the geared motors 34
5.1.4 Maintenance agreement / Customer service 34
5.1.5 Replacement parts 34
5.1.6 Disposal information 35
Disposal of the ash
35
Disposal of system components
35
6 Troubleshooting 36
6.1 Blockage in ash discharge on the T4/TX 36
6.2 Blockage in ash discharge on the P4 Pellet 38
7 Appendix 40
7.1 Addresses 40
7.1.1 Address of manufacturer 40
7.1.2 Address of the installer 40
Table of Contents
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 3
1 General
Thank you for choosing a quality product from Froling. The product features a state-of­the-art design and conforms to all currently applicable standards and testing guidelines.
Please read and observe the documentation provided and always keep it close to the system for reference. Observing the requirements and safety information in the documentation makes a significant contribution to safe, appropriate, environmentally friendly and economical operation of the system.
The constant further development of our products means that there may be minor differences from the pictures and content. If you discover any errors, please let us know: doku@froeling.com.
Subject to technical change.
This is an incomplete machine as defined by the Machinery Directive. The incomplete machine must only be started up when it has been confirmed that the machine, in which the incomplete machine has been installed, conforms to the provisions of Directive 2006/42/EC.
Compliance with the open provisions and verification of the correct installation must be confirmed in the delivery certificate of the declaration of installation (included in documentation).
Warranty and Guarantee Conditions
Our sale and delivery conditions will be applicable. These conditions have been made available to customers, and customers have been made aware of them at the time of order completion.
You can also find the guarantee conditions on the enclosed guarantee certificate.
Issuing a delivery
certificate
1
General
4 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
1.1 Product overview
E
A Ash transfer box for T4 / TX
B Ash transfer box for P4 Pellet
C Cladding for P4 Pellet
(mounted onto the boiler instead of the insulated doors)
D Discharge pipe with coreless screw for transporting ash to the gravity shaft
E Supporting post for holding up and levelling the discharge pipe
F Drive unit with geared motor
G Gravity shaft with flexible high-temperature hose and safety switch
H 240 l standard dustbin with attachments
General
1
Product overview
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 5
2 Safety
2.1 Hazard levels of warnings
This documentation uses warnings with the following hazard levels to indicate direct hazards and important safety instructions:
DANGER
The dangerous situation is imminent and if measures are not observed it will lead to serious injury or death. You must follow the instructions!
WARNING
The dangerous situation may occur and if measures are not observed it will lead to serious injury or death. Work with extreme care.
CAUTION
The dangerous situation may occur and if measures are not observed it will lead to minor injuries or damage to property.
2
Safety
Hazard levels of warnings
6 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
2.2 Permitted uses
Froling’s ash discharge system is only applicable to the removal of combustion residue in the form of ash from the Froling boilers detailed in the section entitled “Area of Application”. The ash will be discharged into the provided standard dustbin or any other suitable recipient.
The unit should only be operated when it is in full working order. It must be operated in accordance with the instructions, observing safety precautions, and you should ensure you are aware of the potential hazards. The inspection and cleaning intervals in the operating instructions must be observed. Ensure that any faults which might impair safety are rectified immediately.
The manufacturer or supplier is not liable for any damage resulting from non-permitted uses.
Only original spare parts or specific alternative spare parts authorised by the manufacturer may be used. Any kind of change or modification made to the product will invalidate its manufacturer’s CE conformity. In such cases, the product will need to undergo new hazard evaluation procedures by the operator. The operator will then be fully responsible for the declaration of conformity according to the valid guideline(s) for the product and will need to attach the new CE label to the device. This person will then assume all of the rights and responsibilities of a manufacturer.
2.2.1 Area of Application
The Froling ash discharge system can be used in conjunction with the following Froling boilers:
T4 24 – 150 wood chip boiler ▪ TX 150 – 250 wood chip boiler ▪ P4 Pellet 45 – 105 pellet boiler
2.2.2 Permitted fuels
Only use the fuels permitted in the boiler. Please refer to the section entitled “Permitted fuels” in the boiler’s assembly and operating instructions.
2.3 General safety information
❒ Refer to the safety information, information on residual risks and design
information in the installation and operating instructions for the boiler in question.
NOTICE
In addition to these instructions, please also note all specifications, safety information and standards in the installation and operating instructions for the boiler in question.
Safety
2
Permitted uses
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 7
2.4 Qualification of staff
2.4.1 Qualification of assembly staff
CAUTION
Assembly and installation by unqualified persons:
Risk of personal injury and damage to property
During assembly and installation:
❒ Observe the instructions and information in the manuals ❒ Only allow appropriately qualified personnel to work on the system
Assembly, installation, initial startup and servicing must always be carried out by qualified personnel:
- Heating technician / building technician
- Electrical installation technician
- Froling customer services The assembly staff must have read and understood the instructions in the
documentation.
2.4.2 Personal protective equipment for assembly staff
You must ensure that staff have the protective equipment specified by accident prevention regulations.
▪ For transportation, setup and assembly:
- suitable work wear
- protective gloves
- sturdy shoes (min. protection class S1P)
2.4.3 Qualification of operating staff
CAUTION
If unauthorised persons enter the installation room / boiler room:
Risk of personal injury and damage to property
❒ The operator is responsible for keeping unauthorised persons, in particular
children, away from the system.
Only trained operators are permitted to operate the unit. The operator must also have read and understood the instructions in the documentation.
2
Safety
Qualification of staff
8 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
2.4.4 Protective equipment for operating staff
You must ensure that staff have the protective equipment specified by accident prevention regulations.
▪ For operation, inspection and cleaning:
- suitable work wear
- protective gloves
- sturdy shoes
2.5 Design information
Carrying out modifications to the system and changing or deactivating safety equipment is prohibited.
Always comply with all fire, building, and electrical regulations when installing or operating the system, in addition to following the operating instructions and mandatory regulations that apply in the country in which the tank is operated.
2.5.1 Standards
The system must be installed and commissioned in accordance with the local fire and building regulations. The following standards and regulations should be observed in any case:
ÖNORM / DIN EN 60204 Safety of machines; Electrical equipment of machines, Part 1:
General requirements
TRVB H 118 Technical directives for fire protection/prevention (Austria)
ÖNORM H 5170 Construction and fire protection requirements (Austria)
ÖNORM H 5190 Heating systems - Acoustic insulation
EN ISO 13857 Safety of machines; Safety distances for maintaining a safe
distance from hazardous areas
2.5.2 General information for installation room
▪ Danger of fire due to flammable materials.
No flammable materials should be stored near the ash discharge system. – Flammable objects (e.g. clothing) must not be put on the system to dry. – The floor under the system must be fire-resistant.
▪ There is a possibility of dust near the system.
Safety
2
Qualification of staff
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 9
3 Technology
3.1 Dimensions of ash transfer box for T4 / TX
Dimensi
on
Description Unit Ash discharge system for
T4 TX
H1 Total height of ash discharge system mm 1,725
H2 Height of standard dustbin mm 1,040
H3 Height of drive unit and gravity shaft
(excluding high-temperature hose)
mm 470
H4 Height of ash transfer box mm 305 325
W1 Total width of ash discharge system mm 2,700
W2 Width of ash transfer box
incl. connection flange
mm 430
W3 Width of ash transfer box
without connection flange
mm 330
W4 Width of standard dustbin mm 600
L1 Length of ash transfer box mm 430 340
L2 Length of standard dustbin mm 725
D Hose diameter mm 90
3
Technology
Dimensions of ash transfer box for T4 / TX
10 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
3.2 Dimensions of ash transfer box for P4 Pellet
Dimensi
on
Description Unit Ash transfer box for P4 Pellet
45-60 70-105
H1 Total height of ash discharge system mm 1,725
H2 Height of standard dustbin mm 1,040
H3 Height of drive unit and gravity shaft
(excluding high-temperature hose)
mm 470
H4 Height of cladding mm 615
H5 Height of ash transfer box mm 165
W1 Total width of ash discharge system mm 3,295 3,465
W2 Width of ash transfer box mm 1,020 1,110
W4 Width of standard dustbin mm 600
L1 Length of ash transfer box mm 370
L2 Length of standard dustbin mm 725
D Hose diameter mm 90
Technology
3
Dimensions of ash transfer box for P4 Pellet
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 11
3.3 Technical specifications
Ash discharge system
Description Unit Ash discharge system
T4 TX P4 Pellet
Power supply to geared motor 230 V/50 Hz
Power consumption of geared motor W 180
Speed of coreless screw rpm 29
Weight of ash transfer box kg 17 14 13
Weight of gravity shaft with motor kg 14
Weight of hoses with screw kg 24
Standard dustbin
Description Unit Value
Net weight kg 37
Net weight including components kg 40
Capacity l 240
Max. load according to EN 840 kg 96
Material - Hot-dip galvanised sheet metal
Thickness of back and cover mm 1.25
3
Technology
Technical specifications
12 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4 Assembly
CAUTION
Assembly and installation by unqualified persons:
Risk of personal injury and damage to property
During assembly and installation:
❒ Observe the instructions and information in the manuals ❒ Only allow appropriately qualified personnel to work on the system
WARNING
Working on a system which is operational/hot:
Risk of serious injuries from automatic start-up of the system and severe burns from hot parts and the flue gas pipe!
When working on the system:
❒ always wear protective gloves ❒ only operate the boiler using the handles provided ❒ switch off the boiler by tapping “Boiler off” at the mode icon
➥ The boiler follows the shutdown procedure and switches to “Boiler off”
status
❒ switch off the main switch and take precautions to prevent accidental
switching on ❒ allow the boiler to cool off for at least 1 hour ❒ once all of the tasks have been completed, turn the main switch back on and
switch the boiler on in the desired mode
Assembly
4
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 13
4.1 Materials supplied
T4
TX
P4 Pellet
E
A Ash transfer box incl. flange for T4 F Coreless screw
B Ash transfer box incl. flange for TX G Tension rings
C Cladding for P4 Pellet H 1 pipe bend, 1 straight pipe
D Ash transfer box incl. flange
for P4 Pellet
I Gravity shaft with geared motor and
flexible high-temperature hose
E Supporting post J 240 l standard dustbin with attachments
4.2 Transport
The product is delivered on pallet(s) in cardboard packaging.
NOTICE
Possibility of damage to components if handled incorrectly
Follow the transport instructions on the packaging ❒ Transport components with care to avoid damage ❒ Protect components against damp ❒ Pay attention to the pallet's centre of gravity when lifting
4
Assembly
Materials supplied
14 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4.3 Temporary storage
If the system is to be assembled at a later stage:
Store components at a protected location, which is dry and free from dust
➥ Damp conditions and frost can damage components, particularly electric ones!
4.4 Installation site
▪ In order to make it easier to empty the dustbin, the emptying point and the ash
discharge system should be located level to each other
The door opening at the installation site should be large enough to let the dustbin
pass easily
⇨ See "Dimensions of ash transfer box for T4 / TX" [page 10]
⇨ See "Dimensions of ash transfer box for P4 Pellet" [page 11]
▪ If the dustbin needs to be transported to the emptying point with a forklift, enough
room must be left at the installation site to let the forklift manoeuvre
Assembly
4
Temporary storage
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 15
4.5 Assembly overview
4.5.1 Ash transfer box for T4 / TX
15
15
T4
TX
1
2
3
3
3
3
3
4
4
4
5
6
6
6
7
9
1
0
11
12
13
14
8
1
8
9
10
11
12
13
14
2
3
3
3
3
3
4
4
4
5
6
6
6
7
Item Qty
[units]
Description Item Qty
[units]
Description
1 1 Complete ash transfer box 9 1 Cover, complete
2 1 Welded-assembly ash transfer
box
10 1 Silicone foam seal (left)
3 5 Silicone foam seal 11 1 Silicone foam seal (centre)
4 3 Cover plate 12 1 Silicone foam seal (right)
5 1 Connection flange with guide 13 1 Sticker, “Warning! Hot
surface!”
6 3 Adjustable foot 14 1 Chain
7 1 Cover plate with edge 15 1 Key plate
8 2 Ash flap (only T4)
4
Assembly
Assembly overview
16 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4.5.2 Ash transfer box for P4 Pellet
1
2
3
3
4
4
4
4
5
5
5
5
6
7
8
9
9
10
11
11
12
12
12
12
12
12
12
12
12
12
12
12
10
10
10
13
14
14
15
15
15
15
16
16
17
Item Qty
[units]
Description Item Qty
[units]
Description
1 1 Complete ash transfer box 10 4 Silicone foam seal
2 1 Welded-assembly ash transfer
box
11 2 Sticker, “Warning! Hot surface!”
3 2 Locking plate 12 12 Countersunk bolt
4 4 Pressure spring 13 1 Cladding (underneath, complete)
5 4 Flat-headed screw 14 2 Grip recess
6 1 Tension ring 15 4 Double ball catch
7 1 Ring seal 16 2 Key plate
8 1 Cover plate 17 1 Sticker, quick reference guide
9 2 Cover, complete
Assembly
4
Assembly overview
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 17
4.5.3 Hose with screw, supporting post and gravity shaft
15
16
17
18
17
18
19
20
19
21
22
23
24
25
26
1
2
3
4
2
3
3
2
5
6
7
8
9
10
11
12
12
13
13
14
Item Qty
[units]
Description Item Qty
[units]
Description
1 1 Hose with screw and supporting
post
14 1 Coreless screw
2 3 Ring seal 15 1 Gravity shaft unit, complete
3 3 Tension ring 16 1 Gravity shaft bracket
4 1 Pipe bend 17 2 Silicone foam seal
5 1 Straight pipe with flange 18 2 Inspection cover
6 1 Pipe clamp 19 2 Hose clamp
7 1 Attachment bracket 20 1 High-temperature hose
8 1 Swivelling supporting post 21 1 Gravity shaft connection flange
9 1 Upper bracket 22 1 Safety switch
10 1 Support plate with rotary disc 23 1 Silicone foam seal
11 1 Ground section for supporting
post
24 1 Adapter flange
12 2 Dowel 25 1 Offset geared motor
13 2 Frame screw 26 1 Counter plate
4
Assembly
Assembly overview
18 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4.5.4 Standard dustbin
1
2
4
3
5
6
7
8
8
9
1
0
11
11
12
13
13
13
13
14
15
16
Item Qty
[units]
Description Item Qty
[units]
Description
1 1 Standard dustbin with
attachments
9 1 Silicone foam seal
2 1 240 l standard dustbin 10 1 Locking plate
3 1 Rubber seal for profile 11 2 Star knob
4 1 Silicone foam seal 12 1 Bracket
5 1 Flange bracket 13 4 M6x9 flat-headed screw
6 1 Spacer plate 14 1 Clamping plate
7 1 Key plate 15 1 Bearing pin
8 2 Bush 16 1 Hooked bracket
Assembly
4
Assembly overview
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 19
4.6 Assembling the ash discharge system
WARNING
Working on a system which is operational/hot:
Risk of serious injuries from automatic start-up of the system and severe burns from hot parts and the flue gas pipe!
When working on the system:
❒ always wear protective gloves ❒ only operate the boiler using the handles provided ❒ switch off the boiler by tapping “Boiler off” at the mode icon
➥ The boiler follows the shutdown procedure and switches to “Boiler off”
status
❒ switch off the main switch and take precautions to prevent accidental
switching on ❒ allow the boiler to cool off for at least 1 hour ❒ once all of the tasks have been completed, turn the main switch back on and
switch the boiler on in the desired mode
NOTICE! These instructions show how to install the ash discharge system to the right of the boiler (when looking at it from the front). To install the system in a different position, modify the ash transfer box and follow the same steps but to the other side of the boiler.
4.6.1 Modifying the ash transfer box for P4 Pellet (where required)
When delivered, the cover plate is mounted to the left-hand side of the ash transfer box (so that the ash discharge system can be mounted to the right of the boiler). Where necessary, the ash discharge system can also be installed to the left of the P4 Pellet boiler. Carry out the following steps to modify the ash transfer box:
❒ Remove the tension ring and the cover plate with the seal and then reassemble on
the other side
NOTICE! Make sure to complete the following steps on the opposite side!
4
Assembly
Assembling the ash discharge system
20 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4.6.2 Modifying the ash transfer box for T4 / TX (where required)
When delivered, the connection flange is mounted to the right-hand side of the ash transfer box (so that the ash discharge system can be mounted to the right of the boiler). Where necessary, the ash discharge system can also be installed in a different position on the T4 and TX. Carry out the following steps to modify the ash transfer box:
❒ Remove the connection flange to the right-hand side of the ash transfer box ❒
Remove the desired cover plate ❒ Connect the connection flange in the desired position ❒ Replace the missing cover plate from where you just removed the connection
flange ❒ The cover plate with the adjustable foot (A) needs to be placed in a suitable
position so that the weight is distributed evenly across the ash transfer box
➥ Where required, swap the cover plate without the adjustable foot for the cover
plate with the adjustable foot
NOTICE! Make sure to complete the following steps on the opposite side!
4.6.3 Removing the boiler ash container
❒ Remove the ash container from the boiler according to the boiler instructions and
empty if necessary
NOTICE! Please refer to the specific instructions for the boiler in question
4.6.4 Assembling the ash transfer box on the T4 / TX
T4
❒ Replace the ash container on the boiler with the ash transfer box
➥ Push the lever to one side of the boiler to lock the ash transfer box in place ❒
Push the key plate into the safety switch on the boiler
Assembly
4
Assembling the ash discharge system
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 21
4.6.5 Assembling the ash transfer box on the P4 Pellet
❒ Remove the insulating cover ❒
Remove the two screws and contact washers from the flaps of the controller cover ➥ Caution: do not lose the contact washers!
❒ Remove the screws and contact washers on the bottom of the controller cover
❒ Remove the controller cover ❒
Remove the bolts and insulated doors
❒ Open both ash doors ❒
Loosen the retainer plates on the upper hinge pins on both doors
➥ to do so, we recommend using two screwdrivers ❒ Remove both upper hinge pins ❒ Insert 1 spacer washer between the hinge and each door ❒ Reinsert both hinge pins and fix in place using the retainer plates ❒ Reassemble the controller cover and replace the insulating cover
4
Assembly
Assembling the ash discharge system
22 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
❒ Replace the ash container with the ash transfer box ❒
Push the lever down to lock the ash transfer box in place
❒ Secure 2 double ball catches to the left and right of the boiler insulation using blind
rivets in the pre-drilled holes.
❒ Replace the insulated doors with the cladding (provided)
➥ Ensure that the tabs are placed correctly in the safety switch on the boiler
4.6.6 Assembling the discharge pipe and supporting post
❒ Slide the ring seal over the flange on the pipe bend (A) ❒
Using the tension ring, attach the straight pipe to the pipe bend (B) ➥ Take the tension ring apart and attach the lower part ➥ Then place the upper part of the tension ring and screw the two parts together
❒ Attach the supporting post to the straight pipe using the pipe clamp
➥ Optimum height: the pipe clamp should be fixed approx. 500 mm above the
tension ring
Assembly
4
Assembling the ash discharge system
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 23
4.6.7 Assembling the coreless screw and drive unit with gravity shaft
❒ Remove the screw, spacer washer and key from the end of the screw ❒
Grease the stub shaft ❒ Push the screw through the pipe from the top ❒ Assemble the drive unit and seal onto the hose with the tension ring
❒ Remove the inspection cover and seal from one side of the gravity shaft bracket
➥ this makes it easier to install the screw ❒
Insert the key between the gears and screw
➥ Ensure that the key groove the stub shaft is aligned with the key groove in the
gears - where required, rotate the screw in the ash transfer box or through the
inspection opening ❒ Attach the screw to the gears with the shaft retainer washer ❒ Replace the inspection cover and seal on the gravity shaft bracket
4
Assembly
Assembling the ash discharge system
24 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
❒ Attach the high-temperature hose and connection flange to the gravity shaft using
the hose clamp
T4/TX:
P4 Pellet:
❒ Push the screw with the hose and drive unit as far as it will go into the ash transfer
box flange and then fix it in place using a tension ring.
Assembly
4
Assembling the ash discharge system
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 25
4.6.8 Aligning the ash discharge system
❒ Straighten up the ash transfer box
➥ Adjust the supporting posts as required
❒ Loosen the screws on the supporting post bracket
➥ Set the correct angle (A) ➥ Rotate the supporting post if necessary (B)
Loosen the screws on the supporting post stand ➥ Set the correct height
4 5 °
❒ Align the discharge pipe
➥ Angle of pipe: 45°
Tighten the screws on the bracket and supporting post stand
❒ Screw the supporting post into the floor
NOTICE! The material supplied for fixing the supporting post is just a guide. Ensure you use material best suited to the surface!
For the T4 / TX:
4
Assembly
Assembling the ash discharge system
26 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4.6.9 Assembling the standard dustbin
❒ Loosen the star shaped screws and remove the locking plate
➥ Store the locking plate in a suitable location - it will be needed when disposing
of the ash Tip: hang the locking plate on the hook of the gravity shaft bracket inspection cover
Position the dustbin underneath the gravity shaft
❒ Replace the locking plate with the flange on the end of the hose and attach to the
dustbin by tightening the star shaped screws
Push the key plate into the safety switch
Assembly
4
Assembling the ash discharge system
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 27
If the flexible tube on the gravity shaft is too long:
❒ Loosen the hose clamps at the top and bottom and remove the hose ❒
Cut to the required length
❒ Reattach the tube using the hose clamps
4.7 Connecting the system
4.7.1 Connecting the ash discharge system to the TX
❒ Insert the cables from the drive unit into the boiler controller
❒ Connect the cables to the “Vibration motor (12)” output on the wood chip
module ➥ From software version 50.04 – Build 05.10
4.7.2 Connecting the safety switch on the standard dustbin to the TX
NOTICE! Connect the safety switch cables to the terminals; see wood chip module circuit diagram!
4
Assembly
Connecting the system
28 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
4.7.3 Connecting the ash discharge system to the T4
❒ Insert the cables from the drive unit into the boiler controller
❒ Connect the cables to the free “Ash screw (10 / 11)” output on the wood
chip module
4.7.4 Connecting the safety switch on the standard dustbin to the T4
Kernmodul
(FRKEM 25)
Boiler
safetyswitch
Standarddustbin
safetyswitch
❒ Disconnect one cable from the boiler safety switch (A) on the core module and
connect to one of the cables on the standard dustbin safety switch via a terminal
(B)
Connect the second cable from the standard dustbin safety switch (C) to the
contact you just disconnected on the “Ash box contact switch (16)” output
Assembly
4
Connecting the system
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 29
4.7.5 Connecting the ash discharge system to the P4 Pellet
❒ Insert the cables from the drive unit into the boiler controller
❒ Connect a cable additionally to the “EOS drive M4 (2)” output on the pellet
module ➥ the ash discharge system runs simultaneously with the EOS ➥ no noise pollution during the set “off times”
4.7.6 Connecting the safety switch on the standard dustbin to the P4 Pellet
❒ Remove any of the boiler safety switches on the pellet module ❒ Connect the plug on the standard dustbin safety switch to the free input
TKS(17)
4
Assembly
Connecting the system
30 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
5 Servicing
5.1 Inspection and cleaning
WARNING
Incorrect inspection and cleaning:
Incorrect or insufficient inspection and cleaning of the boiler can cause serious faults in combustion (e.g. spontaneous combustion of carbonisation gases / flash fires) and this can lead to serious accidents and damage!
Take the following precautions:
❒ Clean the boiler following the instructions in the instruction manual. Follow the
boiler operating instructions.
WARNING
Inspection and cleaning work on a system which is operational:
Risk of serious injuries from automatic startup of the system and severe burns from hot parts and the flue gas pipe!
When working on the system:
❒ always wear protective gloves ❒ only operate the boiler using the handles provided ❒ switch off the boiler by tapping “Boiler off” at the mode icon
➥ The boiler follows the shutdown procedure and switches to “Boiler
off“ status
❒ switch off the main switch and take precautions to prevent accidental
switching on ❒ allow the boiler to cool off for at least 1 hour ❒ once all of the tasks have been completed, turn the main switch back on and
switch the boiler on in the desired mode
NOTICE
Overloading the dustbin
Please note there is no system for measuring the fill level!
Therefore:
❒ check the ash level in the dustbin on a regular basis
➥ Refer to the maximum load of the dustbin
⇨ See "Technical specifications" [page 12]
Servicing
5
Inspection and cleaning
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 31
NOTICE! The frequency at which the following work is carried out depends on energy requirements, fuel quality and number of operating hours.
5.1.1 Checking the ash level in the dustbin
NOTICE
Exceeding the dustbin’s maximum load may result in damage to the dustbin and serious difficulties in emptying it.
As a result:
❒ do not exceed the dustbin’s maximum load
⇨ See "Technical specifications" [page 12]
The fill level of the dustbin can also be checked while the system is in operation. However:
the coreless screw must not be in operation (listen for movement).
– Caution: if the dustbin is opened while the coreless screw is in motion, large
amounts of dust will be released!
1. Undo the quick lock
2.
Open the dustbin
3. Check the fill level – Refer to the maximum load of the dustbin ⇨ See "Technical specifications"
[page 12]
4. Quickly close and lock the dustbin again – Caution: if the dustbin is opened while the coreless screw is in motion, large
amounts of dust will be released!
5. Empty the dustbin whenever necessary
5
Servicing
Inspection and cleaning
32 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
5.1.2 Emptying the dustbin
1. Remove the key plate from the safety switch
2.
Loosen the star shaped screws
1. Remove the dustbin from the connection flange
2.
Hang the flange on the hook of the gravity shaft bracket inspection cover
3. Replace the flange with the locking plate
4. Fix the locking plate in place using the star shaped screws
5. Take the dustbin to the emptying point and empty it
6. Reassemble the dustbin ⇨ See "Assembling the standard dustbin" [page 27] – the boiler will start up automatically once the key plate has been reinserted
into the safety switch
Tip: for easier transport and emptying of the dustbin, attach forklift hooks to it (available in stores).
Servicing
5
Inspection and cleaning
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 33
5.1.3 Checking the geared motors
❒ Carry out a visual inspection of the seal on all the geared motors in the system
➥ There should be no significant leakage of lubricant.
NOTICE! The presence of a few drops of lubricant may be normal. If there is significant loss of lubricant, inform your installer or Froling customer services.
5.1.4 Maintenance agreement / Customer service
NOTICE! We recommend a yearly inspection by Froling customer services or an authorised partner (third party maintenance).
Regular maintenance and servicing by a heating specialist will ensure a long, trouble­free service life for your heating system. It will ensure that your system stays environmentally-friendly and operates efficiently and cost-effectively. In the course of this maintenance the entire system is inspected and optimised, particularly regulation and control of the boiler. The emission measurement carried out can also be used to draw conclusions about the combustion performance of the boiler. For this reason, FROLING offers a service agreement, which optimises operating safety. Please see the details in the accompanying guarantee certificate.
Your Froling customer service office will also be happy to advise you.
NOTICE
All national and regional regulations relating to regular testing of the system must be observed. Please be advised that, in Austria, commercial systems with a rated heat output of 50 kW or more must be regularly tested at yearly intervals in accordance with the Heating Plant Regulations (Feuerungsanlagen-Verordnung).
5.1.5 Replacement parts
With Froling original replacement parts in your boiler, you are using parts that match perfectly. As the parts fit together so well, installation times are shortened and a long service life is maintained.
NOTICE
Installing non-original parts will invalidate the guarantee.
❒ Only replace components or parts with original replacement parts
5
Servicing
Inspection and cleaning
34 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
5.1.6 Disposal information
Disposal of the ash
❒ dispose of ash in accordance with the Waste Management Act (AWG) ❒ dispose of ash in accordance with local regulations
Disposal of system components
❒ Ensure that they are disposed of in an environmentally friendly way in accordance
with waste management regulations in the country (e.g. AWG in Austria)
❒ You can separate and clean recyclable materials and send them to a recycling
centre.
Austria:
Other countries:
Servicing
5
Inspection and cleaning
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 35
6 Troubleshooting
NOTICE
For more information on dealing with error messages, also refer to the boiler and boiler controller instructions.
WARNING
Working on a system which is operational/hot:
Risk of serious injuries from automatic start-up of the system and severe burns from hot parts and the flue gas pipe!
When working on the system:
❒ always wear protective gloves ❒ only operate the boiler using the handles provided ❒ switch off the boiler by tapping “Boiler off” at the mode icon
➥ The boiler follows the shutdown procedure and switches to “Boiler off”
status
❒ switch off the main switch and take precautions to prevent accidental
switching on ❒ allow the boiler to cool off for at least 1 hour ❒ once all of the tasks have been completed, turn the main switch back on and
switch the boiler on in the desired mode
6.1 Blockage in ash discharge on the T4/TX
An error message is displayed on the boiler when the ash discharge system is blocked and the ash transfer box is full.
1.
Shut down the system
2. Remove the dustbin ⇨ See "Emptying the dustbin" [page 33]
1. Loosen the screws on the supporting post bracket (A) – The discharge pipe can now be rotated
6
Troubleshooting
Blockage in ash discharge on the T4/TX
36 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
T4
1. Remove the key plate from the boiler safety switch
2.
Push the lever to the side on the boiler up
3. Remove the ash transfer box from the boiler
1. Loosen the tension ring between the pipe bend and the ash transfer box
2.
Remove the ash transfer box from the coreless screw
3. Empty the ash transfer box and reassemble the components in reverse order
4. Switch on the system
5. Ensure the coreless screw is working (sound/visual inspection)
If the error message is still displayed on the boiler, check for a blockage of the ash screw inside the boiler.
Troubleshooting
6
Blockage in ash discharge on the T4/TX
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 37
6.2 Blockage in ash discharge on the P4 Pellet
1. Shut down the system
2.
Remove the dustbin ⇨ See "Emptying the dustbin" [page 33]
1. Loosen the screws on the supporting post bracket (A) –
The discharge pipe can now be rotated
1. Remove the cladding
2.
Push the lever to the side on the boiler up
3. Remove the ash transfer box from the boiler
6
Troubleshooting
Blockage in ash discharge on the P4 Pellet
38 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
1. Loosen the tension ring between the pipe bend and the ash transfer box
2. Remove the ash transfer box from the coreless screw
3. Empty the ash transfer box and reassemble the components in reverse order
4. Switch on the system
5. Ensure the coreless screw is working (sound/visual inspection)
Troubleshooting
6
Blockage in ash discharge on the P4 Pellet
Installation and Operating Instructions Ash discharge into a standard dustbin | M1590214_en 39
7 Appendix
7.1 Addresses
7.1.1 Address of manufacturer
FRÖLING Heizkessel- und Behälterbau GesmbH
Industriestraße 12 A-4710 Grieskirchen AUSTRIA
TEL 0043 (0)7248 606 0 FAX 0043 (0)7248 606 600 INTERNET www.froeling.com
7.1.2 Address of the installer
Stamp
7
Appendix
Addresses
40 Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Loading...