READ BEFORE INSTALLING UNIT
For Low Profile Window Air Conditioner
Carefully read the installation manual before beginning.
Follow each step as shown.
Observe all local, state, and national electrical codes and by qualified, licensed, authorized personnel only.
Pay attention to danger and safety notices.
To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may
be exposed:
Air conditioners covered in this manual pose an excessive weight hazard. Two or more people are needed to move and install
the unit. Wear protective gloves whenever lifting or carrying the unit. AVOID the sharp metal fins of front and rear coils. To
prevent injury or strain, use proper lifting and carrying techniques when moving unit.
Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit overan extended
period of time.
Handle air conditioner with care.
Make sure air conditioner does not fall during installation.
• SAVE CARTON and these INSTALLATION INSTRUCTIONS for future reference. The carton is the best way to
store unit durin 9 winter, or when not in use.
o DO NOT USE ANY SCREWS OTHER THAN THOSE SPECIFIED IN THESE INSTRUCTIONS.
Tools Required
• SCREWDRIVER (Standard and Phillips and Flathead) • RULER
• KNIFE ® HAMMER
e PENCIL • LEVEL
Hardware ( in plastic bag)
Qty.
Hardware (in plastic bag)
SUPPORT BRACKET 1
LONG LEVELING BOLT 1
SHORT LEVELING BOLT 1
1/2" SCREW
SASH LOCK
WEATHER SEALS
(6"x3/4"x1/12")
WINDOW SASH SEAL
FOAM STRIP
Qty.
5
2020211A1554
How to install the unit
1. To prevent vibration and noise, make sure the unit is installed
securely and firmly.
2. Install the unit a little slanted so the back is slightly lower than the
front (about 1/4"). This will force condensed water to flow to the
outside.
CAUTION: All side louvers of the cabinet must remain exposed to
the outside of the structure.
About 1/4"
Install
Left + Right Filler Panel Assembly
Place unit on floor, a bench or a table. There is a Left and Right side Filler Panels - be sure to use the proper
panel for each side. When installed, the flange for securing the panel in place to the window sill will be facing
into the
A. Hold the side panel in one hand and gently pull back the center to free the open end. See FIG. 1.
B. Slide the free end "1" section of the panel into the cabinet as shown in FIG. 2. Slide the panel down. Be sure to
C. Once the panel has been installed on the side of the cabinet, make sure it sits securely inside the frame channel by
making slight adjustments. Slide the top and bottom ends of the frame into the top and bottom rails of the cabinet, see FIG.3.
D. Slide the panel all the way in and repeat on the other side.
room.
leave enough space to slip the top and bottom of the frame into the rails on the cabinet.
FIG.1 _,---_'r' section FIG.2
FIG.3
Your air conditioner is designed to install in standard double
hung windows with opening widths of 26.5 to 41.5 inches
(673 mm to 1054 mm) (FIG. 4),
Lower sash must open sufficiently to allow a clear vertical
opening of 12.4 inches (315 mm ). Side louvers and the rear
of the air conditioner must have clear air space to allow
enough airflow through the condenser, for heat removal.
The rear of the unit must be outdoors, not inside a building
or garage.
Fig. 4
i_ .......,, Top Rail
OFF ;ET
EXTERIOR
WALL
Wooden Windows