Frigidaire FFRE153ZA1 Installation Manual

Installation Instructions
For BY Platform (15,000-18,500 BTU) + BN Platform (22,000-28,500 BTU) Air Conditioner
READ BEFORE INSTALLING UNIT
INSTALLATION WARNINGS AND CAUTION
Carefully read the installation manual before beginning. Follow each step as shown. Observe all local, state, and national electrical codes and by qualified, licensed, authorized personnel only.
Pay attention to danger and safety notices. To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
Air conditioners covered in this manual pose an excessive weight hazard. Two or more people are needed to move and install
the unit. Wear protective gloves whenever lifting or carrying the unit. AVOID the sharp metal fins of front and rear coils. To
prevent injury or strain, use proper lifting and carrying techniques when moving unit.
Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit overan extended
period of time.
Handle air conditioner with care.
Make sure air conditioner does not fall during installation.
If a new electrical outlet is required, have the outlet installed by a qualified electrician before installing unit.
Preliminary instructions:
Do the following before starting to install unit. See illustrations below. Check dimensions of your unit to determine model type:
BY Platform
Capacity:
Unit Height:
Unit Width:
Min. Window Opening:
Min. Window Width:
Max. Window Width:
15,000~18,500 BTU
17-25/32
"
23-5/8"
19-1/4"
29"
41"
1. Check window opening size: the mounting parts furnished with this air conditioner are made to install in a wooden sill double-hung window. The standard parts are for window dimensions listed above. Open sash to a minimum of 19-1/4"(489mm). (FIG.1)
2. Check condition of window: all wood parts of window must be in good shape and able to firmly hold the needed screws. If not, make repairs before installing unit.
3. Check your storm windows: If your storm window frame does not allow the clearance required, correct by adding a piece of wood as shown (FIG.2), or by removing storm window while room air conditioner is being installed.
FIG.1
sash
1/2" min
19-1/4" min
inner sill
outer sill
storm window frame or other obstruction
BN Platform
22,000~28,500 BTU
18-5/8
"
26-17/32"
19-1/4"
30"
41"
storm window frame or other obstruction
foam gasket
washer head locking screw
frame assembly (left)
side retainer
bottom rail seal to unit
FIG.2
1/2" min
outer sill
safety lock and
" long hex
1/2 head screw
1/2 screws and locknuts
locknut 3/4 long flat head bolt
1-1/2" min
window sash seal
insulation panel
top angle
" long
sill angle bracket
window support bracket
"
sash
19-1/4" min
inner sill
board thickness as required, along entire inner window sill; fasten to inner sill with two nails or screws.
frame assembly (right)
66129926911
1
Installation Instructions
4. Check for anything that could block airflow
Check area outside of window for things such as shrubs, trees, or awnings. Inside, be sure furniture, drapes, or blinds will not stop proper air flow.
5. Check the available electrical service Power supply must be the same as that shown on the unit serial
nameplate. (See Use & Care Guide for serial plate location.) Power cord is 48" long. Be sure you have an outlet near.
All models have a 3-prong service plug to provide proper service and safe positive grouding. Do not change plug in any way. Do not use an adapter plug. If your present wall outlet does not match your plug, call a qualified electrician to make the needed change.
6. Carefully unpack air conditioner
Remove all packing material. Protect floor or other stable flat surface with covering to prevent scratches from unit. With the aid of an assistant, remove unit from styrofoam base and rest on protected surface. Move and install unit with the aid of an assistant. Save packing and shipping box for future unit storage.
Accessory Kit includes
Hardware bag(shipped inside window support brackets)
Window support bracket (2)
Side retainer (2)
Window Filler Panel (2)
Top angle rail can be found in top packing foam (FIG.3)
Tools Required
a large flat blade screwdriver tape measure
adjustable wrench or pliers
level Socket wrenches
Phillips screwdriver
Foam gasket
Window sash seal
Insulation panel (2)
Ruler
Bottom rail seal
Top angle rail
pencil
TOP ANGLE RAIL
WARNING
Avoid fire hazard or electric shock. Do not use an extension cord or an adaptor plug. Do not remove any prong from the power cord.
115V
15A
230V
30A
230V
15A
Grounding Prong
Do not, under any circumstances, cut, remove or bypass the grounding prong.
230V
20A
FIG.3
Hardware ( in plastic bag)
7/16" Locking Screw and Flat Washer for window filler panels
1/2" Long hex head screw
Safety Lock
1/2" Long Screw and locknut
3/4" Long Flat Head Bolt and Locknut
foam insert (Only for BN Platform)
2
Qty.
2 ea
7
1
4 ea
2 ea
2
Hardware ( in plastic bag)
Sill Angle Bracket
Long hex-head locking screw for top angle rail, side retainer 5/16" long
Safety Lock (for Vinyl-Clad window)
Locking screw #10 X 1/4" panhead Phillips screws (for Vinyl-Clad window)
weather stripping
(6"X3/4"X1/12")
Qty.
2
10
2
2
5
Installation Instructions
Remove Air Conditioner from Cabinet
Window Mounting
1
NOTE: Remove any packaging material from cabinet exterior.
1. Pull down on front grille from upper edge. Lift front grille upwards and place to one side. (See FIG.1)
2. Remove filter. To remove, grasp in the middle on each side. Bow filter out to detach top edge from tabs. Once top is free, lift filter up and out.
FIG.1
3. Locate the four Front Panel screws and remove. These screws will be needed to re-install the Front Panel later (See FIG.2)
4. Push metal cabinet side inward to release plastic tabs on each side of Front Panel (see Fig. 3).
5. Rotate Front Panel up until top tabs are free. Pull panel straight out. Depress latch on electronics plug (on some models) to disconnect.
6. Remove Front Panel from unit (see Fig. 4). FIG.3
7. Remove shipping screws from top of unit and also on both sides by the base (See FIG.5). For BY model there
is only 1 shipping screw on the right side of the base.
8. With the aid of an assistant, hold the cabinet while pulling on the base pan handle (see FIG. 4), and carefully
remove the air conditioner from cabinet.
9. For BN models add two foam inserts to holes in top of cabinet where shipping screws were removed from. (See FIG.6)
10. BN models come with internal shipping packaging.
THIS PACKAGING AND PLASTIC TIES MUST BE REMOVED PRIOR TO INSTALLING THE AIR CONDITIONER BACK INTO THE CABINET. (See FIG.7)
11. Remove plastic wrapping from all points on power cord.
FIG.5
shipping screws
Front Grille
base pan handle
Shipping Packaging
FIG.2
FIG.4
FIG.7
FIG.6
Install Top Angle Rail
2
1. Remove adhesive strip coating from foam gasket. Attach adhesive side of gasket to bottom of top angle rail. Insert 4
screws from inside of cabinet and secure to top angle rail. (See FIG. 8)
Assemble Window Filler Panels
3
1. If the side retainer is not installed on the window filler panel, slide the “I” section at
the end of the window filler panel into side retainer. (See FIG. 9)
2. Place cabinit on floor, a bench or a table. Slide top and bottom legs of window filler
panels frame into channel in the top and botton angle rails.
3. From inside of cabinet insert 3 screws to attach each side retainer. (See FIG. 10)
Plastic tie
FIG.8
Foam Gasket
Top angle rail
3
Loading...
+ 6 hidden pages