Frigidaire FFRA0611U1 Installation Manual

Installation Instructions
READ BEFORE INSTALLING UNIT
BK Window Mounting (6,000 - 8,000 BTU)
INSTALLATION WARNINGS AND CAUTION
Carefully read the installation manual before beginning.
be exposed:
Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit over an extended period of time.
NOTE:
the best way to store unit during winter, or when not in use.
Top Rail Hardware
Qty.
4
Before installing, the top rail must be assembled on the unit.
Top Rail
1
Fig. B
Fig. B
Mounting Hardware Qty.
(For Wooden windows)
(For Vinyl-Clad windows)
weather seals
window sash seal foam 1
Drill (If pilot holes are needed)
Fig. C
7
2
2
1
5
66129926562
1
Installation
LEFT + RIGHT FILLER PANEL ASSEMBLY
NOTE:
Top Rail and Side Panels at each side are offset to provide the proper pitch to the rear. This is necessary for proper condensed water utilization and drainage. If you are not using the Side Panels for any reason, this pitch to the rear must be maintained!
Place unit on floor, a bench or a table. There is a Left and Right side Filler Panels - be sure to use the proper panel for each side. When installed, the flange for securing the panel in place to the window sill will be facing into the room.
A. Hold the side Panel in one hand and gently pull back the center to free the open end. See FIG. 1. B. Slide the free end “T” section of the panel directly into the cabinet as shown in FIG. 2. Slide the panel down. Be
sure to leave enough space to slip the top and bottom of the frame into the rails on the cabinet. C. Once the panel has been installed on the side of the cabinet, make sure it sits securely inside the frame channel by
making slight adjustments. Slide the top and bottom ends of the frame into the top and bottom rails of the cabinet. See FIG. 3.
D. Slide the panel all the way in and repeat on the other side.
FIG. 2 FIG. 3FIG. 1
“T” section
Top Rail
Cut the seal foam(adherent type) into proper length. Then stick the seal foam at the lower part of the window frame. Your air conditioner is designed to install in standard double hung windows with opening widths of 22 to 36 inches (558 mm to 914 mm) (FIG. 4A & FIG. 4B) Lower sash must open sufficiently to allow a clear vertical opening of 13.25 inches (337 mm ). Side louvers and the rear of the air conditioner must have clear air space to allow enough airflow through the condenser, for heat removal. The rear of the unit must be outdoors, not inside a building or garage.
Fig. 4A
INNER WINDOW SILL
INTERIOR
WALL
SEAL FOAM
22" to 36"
(558 mm to 914mm)
13.25" min (337 mm)
Wooden Windows
Fig. 4B
INNER WINDOW SILL
Storm Window:
If the air conditioner is blocked by Storm Window, add wood as shown in FIG. 5, or remove storm window before air conditioner
is installed. If Storm Window Frame must remain, be sure the drain holes or
slots are not caulked or painted shut. Accumulated Rain Water or Condensation must be allowed to drain out.
Storm window frame or other obstruction.
Bottom Rail
SEAL FOAM
1-1/2” min
(38 mm)
22" to 36"
(558 mm to 914mm)
13.25" min (337 mm)
Vinyl-Clad Windows
SASH
FIG. 5
Board thickness as required, for proper pitch to rear, along entire sill. Fasten with nails or screws.
2
Installation
Keep a firm grip on the air conditioner, carefully place the unit into the window opening so the bottom of the air conditioner frame is against the window sill (FIG. 6A & FIG. 6B). Carefully close the window behind the top rail of the unit.
FIG. 6A
FIG. 6B
INSIDE
Extend the side panels out against the window frame (FIG. 7A for wooden windows), (FIG. 7B for Vinyl-Clad windows).
OUTSIDE
OUTSIDEINSIDE
Vinyl-Clad WindowsWooden Windows
FIG. 7BFIG. 7A
window frame
Place the frame lock between the frame extensions and the window sill as shown (FIG. 8A for wooden windows), (FIG. 8B for Vinyl-Clad windows).
FIG. 8A FIG. 8B
Vinyl-Clad windows:Wooden windows:
Drive locking screws:
A: For wooden windows:
NOTE:To prevent
B: For Vinyl-Clad windows:
Before driving the screws, use a drill to drill 5 holes through the holes in the frame lock and frame extensions
NOTE:
3
Installation
NOTE: It is difficult to lock the windows with the sash lock for Vinyl-Clad windows, so you can use lock by window itself.
Cut foam window seal and insert it into the space between the upper and lower sashes (FIG. 11).
FIG. 10
Check that air conditioner is tilted back about 1/4" to 1/2" (tilted about 2º to 4º downward to the outside, see FIG. 12A & FIG. 12B). After proper installation, condensate should not drain from the overflow drain hole during normal use, correct the slope otherwise.
FIG. 11
FOAM SEAL
2º to 4º
H
EDISTUOEDISNI
H
about
1/4" to 1/2"
Wooden Window
Trim the weather seal with a proper length, peel off the protective backing and plug any gaps if needed
Bottom Rail
H1
Removing the air conditioner From Window
Turn the air conditioner off, and disconnect power cord. Remove sash seal from between windows, and unscrew sash lock. Remove screws installed through frame and framelock. Close (slide) side panels into frame. Keeping a firm grip on air conditioner, raise sash and carefully remove. Be careful not to spill any condensate water while lifting unit from window. Store parts WITH air conditioner.
4
H
about
Vinyl-Clad Window
2º to 4º
OUTSIDEINSIDE
1/4" to 1/2"
Bottom Rail
Loading...