READ BEFORE iNSTALLiNG UNiT
For Slider Casement Air Conditioners
Carefully read the installation manual before beginning. Follow each step as shown.
Observe all local, state, and national electrical codesand by qualified, licensed, authorized personnel only. Pay attention to danger and safety notices.
Toavoid risk of personal injury, propertydamage, or product damage due to the weight of this device and sharp edges that may be exposed:
period of time. Handle air conditioner with care.
Make sure air conditioner does not fall during installation.
® These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or
installation in a metal CASEMENT window. Modification may be necessary when installing in windows made differently than those shown in these instructions.
A high window accessory kit is available for window heights up to 62" (1575 mm). Part # EA103W.
Meeting Electrical Requirements
Electrical Shock and Personal Injury Hazard
Electrical ground is required on this appliance. o DO NOT ground to a gas line.
o If cold water pipe is interrupted by plastic, non-metallic gaskets, or other insulating materials, DO NOT use for
grounding.
Check with a qualified electrician if you are in doubt as to whether the appliance is properly grounded.
DO NOT modify power supply cord plug. If it does not fit outlet, have a proper outlet installed by a qualified electrician.
o DO NOT have a fuse in the neutral or grounding circuit. Afuse in the neutral, or grounding circuit could result in
an electrical shock.
® DO NOT use an extension cord with this appliance.
Failure to follow these instructions could result in electrical shock, serious injury, or death.
OBSERVE ALL LOCAL GOVERNING CODES AND ORDINANCES. DO NOT, UNDERANY CIRCUMSTANCES, REMOVE THE POWER SUPPLY CORD GROUNDING PRONG.
If codes permit, and a separate grounding wire is used, it is recommended that a qualified electrician determine that the grounding path is adequate and not interrupted by plastic, non-metallic gaskets, or other insulating
materials.
2020213A0931
Page 2
ReceptacleWiring: Receptaclewiringshouldbeaminimumof14gauge.Usecopperwireonly.Itisyourresponsibilitytoprovideproper andadequatereceptaclewiring,installedbyaqualifiedelectrician.
ElectricalRequirements:
A115volt(103.5minimum,126.5maximum),60Hertz,AConly,15amperefusedelectricalsupplyisrequired.Atime
delayfuseortimedelaycircuitbreakerisalsorequired.Aseparatecircuit,servingthisapplianceonly,MUSTbe
)rovided.
ElectricalConnection: Electricalgroundingisrequiredonthisappliance.
3-ProngGrounding TypeWallRece
Recommendedgroundingmethod: Foryourpersonalsafety,thisappliancemustbegrounded. Thisairconditionerincludesapowersupplycordwitha
3-Prong Groundingplug
3-pronggroundingplug.Tominimizepossibleelectricalshock hazard:
cordmustbepluggedintoamatching3-pronggroundingtype wallreceptacle.
mustbegroundedinaccordancewithNationalElectrical Code(ANSI/NFPA70-latestversion)andalllocalcodesand
Groundingprong
ordinances.
Ifa matching3-pronggroundingtypewallreceptacleisnotavailable, itistheresponsibilityoftheconsumertohavea properlygrounded 3-prongwallreceptacleinstalledbyaqualifiedelectrician.
Power Supply Cord (6 feet long)
FIG. 1
Preparing for installation
Installation Tips For wood=frame casement windows:
It may be necessary to construct a frame, using at least
1"thick wood, with a 15-1/2" wide opening.
For brick or cement building construction: It may be necessary to put a wood stool strip under air conditioner, for mounting purposes as shown FIG. 2.
Failure to adhere to the following precautions could result in personal injury and product damage. ® Because this unit weighs about 60 to 80 pounds, it is recommended that you have someone help you when
installing your new unit, and that you both use proper lifting techniques. Inspect the condition of the window where unit will be installed. Be sure it will support the weight of the unit.
This appliance must be installed according to all applicable codes and ordinances. Handle air conditioner with care. AVOID sharp metal fins on front and rear coils. Make sure your air conditioner does not fall during installation. Do not use water collected in the unit for drinking purposes. It is not sanitary.
Tools Required
wood strip Bottom Rail of
mounted on air conditioner
top of inner silt
inner st
;r silt
INDOOR
OUTDOOR FIG. 2
Flat-head screwdriver Carpenter's level Fine tooth saw _ Knife and scissors
Phillips-head screwdriver Tape measure _ Electric or hand drill Pencil
DO NOT USE ANY SCREWS OTHER THAN THOSE SPECIFIED IN THESE INSTRUCTIONS.
/
Page 3
II!1 Make sure you have all the necessary parts.
Installation kit contents (FIG.3):
FIG.3
9 or 10or 11
No.
1
Platform 1 10
2
Support brace 1 11
3
Adjustment bolt 1 12
4
Hex flange nut- 1/4 1 13
5
Track seal 1 14
6
Side channel seal 1 15
7
Window sash seat 1 16
8
Safety bracket 1 17
9
Screw #1 0 x 2-1/2" flat-head 2 18
Hardware Qty. No.
Hardware Qty.
Screw #10 x 1-3/4" flat-head 2
Screw #10 x 1" pan-head 2
Screw #8 x 314" pan-head 6
Screw #8 x 314" self-threading 7
Window locking bracket 1
Plastic window panel 1
Side channel 2
Screw-#8 x 318" truss head 6
Panel frame/seal assembly 1
Use scale below to measure length of your screws. The scale will come in handy when separating screws for installation.
(13mm) (25mm) (44mm) (63mm)
IDENTIFY SCREWS
1/2" 1" 1-3/4" 2-1/2"
BY LENGTH
ZIZI-
3/8" 3/4" 1-1/2" 2"
(10mm) (19mm) (38mm) (50mm)
I_ Choose a proper sized window, as shown (FIG.4).
15-1/2" minimum width 16-1/4" maximum width (for casement windows)
21-1/2" minimum height (with window panel retainer) 20-5/16" minimum height (window panel retainer removed)
40" maximum height
16-1/4"
maximum
width
(casement
windows)
FIG.4
15-1/2"
_-- minimum --
width
21-1/2"
minimum
height
maximum
height
40"
q
J
Height measurement must be of a clear opening above mounting platform. In some cases, due to a variety of stop and track arrangements, the above dimensions may vary slightly. If necessary, installation can be made by alternating window jambs. (See Alternate Window Jamb Applications.)
Page 4
B Choose the proper window location.
Choose a window that allows the cooled air to flow freely and directly into room(s) you wish to cool. Remember, it is difficult to move air
around corners. Also, choose a window that is within 6 feet of an electrical outlet as shown (FIG.5). (See Meeting Electrical
Requirements/Receptacle wiring needs.) Do not use an extension cord.
Installing Unit in a Sliding Window:
_ Attach support brace to p_atform as shown (FIG.6). Use adjustment
bolt and hex flange nut to complete assembly. Choose slot and adjustment bolt hole locations that will create a 45 degree angle between platform and
support brace. Try assembly in the window to determine if platform will rest
properly, and allow proper slope (3/16" lower on out side).
FIG.5
Platform Assembly
o If you are planning to use a siding-protection board (see Step 8)
on the outside of your house hold board in place when testing assembly in window.
_ Measure, and lightly mark a line 8-11/16" from window jamb:
If any sash stop protrudes more than 1"from the side window
jambs, the 8-11/16" measurement must be increased
require adjustments to the measurement.
accordingly (FIG.7). Screen and storm window frames may also
_ Center platform assembly on the line with inside platform tab
pressed against inside edge of window track as shown (FIG.8A, FIG.8B). Using the holes in the platform as a guide, mark and drill two 9/64" diameter
holes. Drill holes in either track or stool.
_Peel off protective backing from track seal. Apply seal to room side of window track (FIG.9). Center of seal strip should coincide with the line
marked in Step 5. The two screw holes drilled in Step 6 should be directly
above seal strip in the inner track.
_ Securely attach a siding-protection board to side of house (FIG.10).
NOTE: Siding-protection board should be long enough to span 2 wall studs.
1/4"(6mm) HEX
FLANGE NUT
8-11/16" inches FI6.7
FIG.8A
Center platform
assembly on the line
with platform tab pressed against window track
Alternate screw location
(depending on the inner sill depth)
Platform tab FIG.8B
window track window seal
FIG.10
FIG.9
Apply track seal
to window side
of track. _
_hde_'w_ n
Page 5
D Place platform assembly, with platform tab against inside of window
track, and attach it to window jamb (FIG. 11). Use appropriate length screws
mAs9-11 in preparing For Installation).
djust platform assembly so that outside edge is 3/16" lower than
inside edge, as shown (FIG.11). This ensures proper water drainage from
the air conditioner. _ Level platform assembly from side-to-side. Also, make sure window
track is level. Use leveling shims as necessary to ensure unit is level from
side-to-side.
_ Measure height of window opening from top of platform assembly as
shown (FIG.12). Subtract 20-5/8". Mark this measurement on plastic window panel, along the longer side.
_ Clamp plastic window panel between a board and a work table, and
cut along cutting line with a fine tooth saw. Remove any burrs with a file.
_ Fasten side channels to the sides of the air conditioner using 3 screws
(Item 17) per channel as shown (FIG.13). Start with first screw at top of channel. Make sure hook ends of channels face toward back of unit.
_ Slide plastic window panel into panel frame as shown (FIG.14), with the smooth side to the room. Slide panel frame assembly into side channels
of the AC cabinet. Make sure plastic window panel is firmly enclosed on all sides by the retainer grooves.
_Cut side channel seal into 2 equal lengths. Remove protective backing
and apply it to the rear side of cabinet side channels, starting just below panel
frame assembly (FIG.15). Pinch off excess length so seal is even with the bottom
of the cabinet side channel.
Fastening Side Channels
J>FFIG.13
FIG.11
Put platform tab against
inside of track.
FIG.12
FIG.15
Outside edge is 3/16" lower than inside\
_ame
,ast,
window panel _ _
E To remove front as shown (FIG.16)
1. Remove the two front retaining screws from the front frame.
2. Press firmly on each side of the metal case close to front, approximately 2/3 of the way down.
3. While pressing on the sides of the metal case, gently pull the front out and lift up to release it from the case.
4. Then release the electrical coupler plug. NOTE: DO NOT push or pull air direction louvers.
_ Place air conditioner in window opening. As shown (FIG.17), it should sit on platform assembly so that
window panel frame and cabinet side channels are against top and side window jambs.
Apply side channel seal
to side channels
just below edge
of panel frame
FIG.17
J
Slide inner
window sash
Front _//_ _/
Retaining/_ , _ Screw
firmly against
cabinet.
Page 6
II_ Slideinnerwindowsashfirmlyagainstsideofthecabinet.Makesurenottopeelthesealstripsfromthewindow trackandcabinetsidechannels.Ifthepanelframedoesnotfitsnuglytotheinnerwindowsash,securethepanelframe tothesashwith#8x3/4"self-threadingscrews.Usethepartiallypluggedholesinthepanelframe.Drill118"pilot
holesforthescrews.
_Hook thesafetybracketoverthebaseoftheunitandfastenittothefrontoftheplatformassembly(FIG.18).Use
a#8-32x3/4"self-threadingscrew. NOTE:Thebracketpreventsmovementoftheairconditioner(eitherinorout)aftercompletingtheinstallation.
_Stuff thewindowsashsealbetweentheverticalsashandthewindowglass,asshown(FIG.19). _Use thewindowlockingbrackettolocktheinnerwindowsashtothebaseoftheouterwindowsash(FIG.19).
Useone#8x 3/4"screw,or#8-32x3/4"self-threadingscrew.(Drill118"pilothole).
_To replacethefrontfirstreconnectthecouplerplugs,maketheexhaustcontrolpositionedthroughthefrontin theproperlocation.Gentlypushthefrontintopositiononthecabinet.Itshouldclickintoplace.Thenreplacethe
retainingscrewsthatholdsthepanelinplace.DONOTpushorpullthefrontpanellouvers.
Insttallsafetybracket
FIG.18
FIG.19
windowsashseal
Window locking
safetybracket bracket
Alternate Window Jamb Applications
To install in windows having no flanges or wood stops on the top and side jambs, the channels and panel frame must fit against a matching flange (or 1/16" max. thick angle) attached to the window jambs. FIG.20A shows this angle
installed. FIG.20B & FIG.20C show alternate treatments. On the sash side of the opening, the leading corner of the inner sash becomes the flange. You can purchase the angle strip locally.
FIG.20A FIG.20B FIG.20C
Add angle to wood stop Add wood as shown Add 16- or 18- gage angle
Installing the Unit in a Casement Window
Platform Assembly FIG.21
Open the window the maximum amount to allow for clearance of the cabinet. The crank handle should be removed to allow the platform to be fastened to
the jamb. If the window cannot open far enough (more than 15-1/2 ) for the cabinet to clear the window, remove the window entirely by drilling out the
rivets. Bolts can serve as the pivots in the feature.
o To avoid crank handle and window clearance problems, the unit can be
installed in a stationary sash section. However the horizontal mullion and
the 2 glass panels must be removed before installation.
_ Attach support brace to platform as shown (FIG.21). Use the adjustment bolt
and hex flange nut to complete the assembly. Choose the slot and adjustment bolt hole location that will create a 45 degree angle between the platform and support brace. Try the assembly in the window to determine if the platform will rest properly, and allow the proper slope (3/16" lower on outside).
1/4" (6mm) HEX FLANGE NUT
Page 7
Ifyou are planning to use a siding-protection board (see Step 29) on the outside of your house, hold the board in place when testing the assembly in the window.
_ Drill a 9/64" diameter pilot hole in the window jamb an equal distance from each side of the jamb (FIG.22),
and 3/16" up from the window sill. If the hole coincides with the window lever slot in the jamb bottom, an additional hole
will have to be drilled through the platform edge and the window jamb to miss this slot.
_Peel off the protective backing from the track seal, and stick the seal to the window sill on the outside of the
bottom jamb as shown (FIG.23).
_ Screw the platform assembly to the window jamb through the pilot hole you drilled in Step 25. Use a #8 x 3/4"
self-threading screw (FIG.24).
Equal distance from both sides Apply track seal to the outside Track seat
edge of the bottom window jamb. Screw /
_[_9/" ._._. Windowjam__b _ Y/_/F/_ pilot hole
FIG.22 _ FIG,24
_ Adjust the platform assembly so that the rear of the air conditioner will be 3/16" lower than the front. This
ensures proper water drainage from the air conditioner.
A projection below the base of the air conditioner will require the rear of the platform to be 7/16" lower than the front to create the 3/16" slant from front to rear (FIG.25).
_ Securely attach a siding-protection board to the side of the house where the platform assembly hit the house
as shown (FIG.26). The siding-protection board should be long enough to span 2 wall studs.
64 diameter
Rear is at least 7/16" lower than
front
FIG.25
Fasten siding protection board to
the house siding.
FIG,26
FIG.27
_ Measure the height of the window opening from the top of the platform
assembly as shown (FIG.27). Subtract 20-5/8". Mark this measurement on the plastic window panel, along the longer side.
W Clamp the plastic window panel between a board and a work table, and
cut along the cutting line with a fine tooth saw. Remove any burrs with a file.
_ Fasten the side channels to the sides of the unit using three screws
(Item 17) per channel. Make sure hook ends of channels face toward the back of unit.
_ Slide the plastic window panel into the panel frame with the smooth
side to the room. Slide the panel frame assembly into the side channels of the air conditioner cabinet. Make sure the plastic window panel is firmly enclosed on all sides by the retainer grooves (FIG.28).
F_anel frame
Plastic window panel
Page 8
_Cut side channel seal into 2 equal lengths. Remove the protective backing and apply it to the rear side of the
cabinet side channels, starting just below the panel frame assembly. Pinch off excess length so the seal is even with
the bottom of the cabinet side channel (FIG.29).
_To remove front as shown (FIG.30)
1. Remove the two front retaining screws from the front frame.
2. Press firmly on each side of the metal case close to the front, approximately 2/3 of the way down.
3. While pressing on the sides of the metal case, gently pull the front out and lift up to release it from the case.
4. Then release the electrical coupler plug. NOTE: DO NOT push or pull air direction louvers.
_ Place the air conditioner in the window opening as shown (FIG.31). It should sit on the platform assembly
so that the window panel frame and the cabinet side channels are against the top and side window jambs. Side channels should overlap side window jambs equally.
FIG.29
FIG.30
FIG.31
J
J
¢,
Apply side
channel seal to side
channels below edge of
panel frame.
Front
Retaining/_, /_--_.,-_J
Screw_
J
_ Drill two 9/64" diameter pilot holes in the top window jamb in line with the partially plugged holes in the panel
frame. Secure the panel frame to the window jamb with two #8-32 x 3/4" self-threading screws. If additional holding is
necessary, two screws may be used on the sides of the panel frame as well.
_ Drill two screw-clearance holes the cabinet side channels (near bottom) and two 9/64" diameter pilot holes
in
in the side window jambs. Secure the cabinet side channels to the window jambs with two #8-32 x 3/4" self-threading screws. When doing this, be careful not to twist the side channel seals with the screws.
NOTE: Inserting screws will prevent the air conditioner from being pushed into the room.
_To replace the front first reconnect the coupler plugs, make the exhaust control positioned through the front
in the proper location. Gently push the front into position on the cabinet. It should click into place. Then replace the retaining screws that holds the panel in place.
Do not push against or pull upon the front panel louvers.
Loading...