Freenotes Harmony Park FEEH1004 Installation & Assembly

HARP
5
42
16
"
INSTALLATION GUIDE
3"
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F DURANGO CO 81303 TEL: (970) 375-7825 FAX: (970) 247-0856 WWW.FREENOTESHARMONYPARK.COM
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF FREENOTES HARMONY PARK. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF FREENOTES HARMONY PARK IS PROHIBITED.
68
7
"
16
Main Features:
• Powder Coated Steel Frame
• Anodized Aluminum Chimes
• Stainless Steel Hardware
Contents:
SHEET 2 - In Ground and Surface Mount
• Installation w/ Parts List
Weights:
Instrument Weight, 111lbs.
• Boxed Instrument Weight, 147lbs.
Harp - Installation Guide
TITLE:
REVISION: A
SCALE: 1:16
DATE: 2/8/2018
HRP-INSTALL
DWG. NO.
SHEET 1 OF 2
Parts List:
ITEM NO.
1
2
3
Step 1:
3/8"-16 Wedge Expansion Anchor, 3.75"lg. SS
Determine installation location. Verify concrete footing is a minimum of 36" long x 24" wide x 6" thick. If the concrete pad is at
PART DESCRIPTION
Harp Instrument Assembly
35/64" Hex Nut Cap
QTY.
1
6
6
an angle, steel washers are required to act as shims (Shims not provided). If there is not already an existing pad, approximately (5) 80lb. bags will be needed. Allow concrete to cure per concrete manufacturers guidelines. (
If a In-Ground appearance is desired recess the concrete pad 4" below finished grade)
Step 2:
With two people place the Instrument Assembly onto the concrete pad and mark the center of the holes on the surfacemount plate. After you have made your marks, set aside the Instrument in order to drill for anchor holes. With a hammer or rotary drill, drill through concrete at marked locations. Drill to a minimum depth of 4". A 3/8" masonry drill bit will be needed.
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F DURANGO CO 81303 TEL: (970) 375-7825 FAX: (970) 247-0856 WWW.FREENOTESHARMONYPARK.COM
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF FREENOTES HARMONY PARK. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF FREENOTES HARMONY PARK IS PROHIBITED.
Step 3:
Place the Instrument back over the drilled out holes. Insert provided anchor bolts into aligned holes. Position anchor nut so that it is flush with the top of the bolt. Pound anchor bolts into the hole until the anchor washer is flush with the steel base. Tighten anchor bolts until they are snug. Cover remaining bolt sections with provided nut caps.
Step 4:
Verify the correct placement, levelness, and finished height of the instrument. Also check for sufficient clearance around the instrument. A 36" perimeter around the instrument is recommended for wheelchair accessibility.
Step 5:
If installing onto wet concrete, us the wet set anchor manufacturers guidelines for installation procedures.
3
2
DETAIL A
SCALE 1 : 6
3/8" Drill Diameter
to a Depth of 4"
Concrete Pad
7"
36"
24"
1
HRP-INSTALL
7"
6"
In Ground and Surface Mount Installation
TITLE:
with Parts List
REVISION: A
SCALE: 1:16
DATE: 2/8/2018
SHEET 2 OF 2
DWG. NO.
Loading...