Franke Foodservice M 2M H CF MUT4 Installation Manual

SINFONIA 1-STEP MUT
M 2M CF MUT4 M 2M H CF MUT4 M 2M HD ASP CF MUT4
1” minimum Clearance On Sides and Rear of Machine
MUT electrical box (6” box)
MUT electrical wires
Cabinet
Milk supply tubes
3/8” Braided Stainless Steel Cold water Supply Line
Water Filter Supplied with Espresso Machine
18” wide
10” of clearance recommended above grinder (5” minimum)
31” high
4” Diameter Hole for Utility Lines
7/8”
2.5”
1-
1.7”
Receptacle Within 3’ Plug is included with machine
110V 15amp for refrigerator
(plug is included)
1/8
9”
All Electrical and Plumbing Must meet Local Codes Please Refer to Specification Sheets for Your Machine
Receptacle Required
For Refrigerator
Receptacle Required
For Espresso
11.5”
Rev 8/10
16mm (3/8”)
Vented Drain
Water and Drain within 5’
5-15R
6-50R
Floor Drain
Unit Height Width Depth Ship weight Voltage/Phase/Cycle Wattage Amp Load Amp Circuit Plug Water line Water hardness Drain
Espresso
Refrigerator
Due to continuous product development, Franke Foodservice Systems, Inc., reserves the right to make changes in design and specifications without prior notice.
Franke Coffee Systems, N.A.
800 Aviation Par kway Smyrna, TN 37167 USA Tel +1 800 310 5710 Fax +1 615 793 5940 email: info.fcsna @franke.com
www.franke-cs.com
31”
780mm
34.5”
846mm
18”
450mm
19”
483mm
24”
600mm
29.25”
743mm
200 lbs
91 kg
176 lbs
80 kg
208/1/60 6900 33 A 50 A
110 /1/60 460 4 A 15 A
NEMA 6-50P
NEMA 5-15P
G 3/8” 1-5 gpg
n/a n/a n/a
16mm ID
vented
Loading...