WARNING:
If the infor mation in the se instruct ions are not foll owed exactly, a fi re
or explosion may result c ausing proper ty damage, p ersonal injury or
loss of life.
FOR YOUR SAFETY
Do not store or use gasoline or other fl ammable vapors and liquids in the
vicinity of this or any other appliance.
Installation and service must be performed by a qualifi ed installer, service
agency or the gas supplier.
Tested by:
Installer: Please complete the details on the back cover
and leave this manual with the homeowner.
Homeowner: Please keep these instructions for future reference.
918-521c
FPI FIREPLACE PRODUCTS INTERNATIONAL LTD. 6988 Venture St., Delta, BC Canada, V4G 1H4
FOR YOUR SAFETY
What to do if you smell gas:
Do not try to light any appliance
Do not touch any electrical switch: do not
use any phone in your building.
Immediat ely call your ga s supplier f rom
a neighbour's phone. Follow the gas
supplier's instructions.
If you cannot rea ch your gas supplier,
call the fi re depart ment.
01/13/10
To the New Owner:
Congratulations!
You are the owner of a state-of-the-art Gas Fireplace by FPI FIREPLACE PRODUCTS
INTERNATIONAL LTD. The P36 has been designed to provide you with all the warmth and
charm of a wood fi replace at the fl ick of a switch. The model P36 has been approved by Warnock
Hersey for both safety and effi ciency. As it also bears our own mark, it promises to provide you
with economy, comfort and security for many trouble free years to follow. Please take a moment
now to acquaint yourself with these instructions and the many features of your FPI Fireplace.
2
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
INFORMATION FOR MOBILE/MANUFACTURED HOMES AFTER FIRST SALE
This FPI product has been tested and listed by Warnock Hersey as a Vented Gas Fireplace Heater to the following standards: CAN/CGA-2.17M91, and ANSI Z21.88a-2007/CSA 2.33a-2007.
This Direct Vent System Appliance must be installed in accordance with the manufacturer's installation instructions and the Manufactured Home
Construction and Safety Standard, Title 24 CFR, Part 3280, or the current Standard of Fire Safety Criteria for Manufactured Home Installations,
Sites, and Communities ANSI/NFPA 501A, and with CAN/CSA Z240-MH Mobile Home Standard in Canada.
This appliance installation must comply with the manufacturer's installation instructions and local codes, if any. In the absence of local codes follow
the current National Fuel Gas Code, ANSI Z223.1 and the current National Electrical Code ANSI/NFPA 70 in the U.S.A., and the current CAN/CGA
B149 Gas Installation Code and the current Canadian Electrical Code CSA C22.1 in Canada.
This FPI Mobile/Manufactured Home Listed appliance comes
factory equipped with a means to secure the unit.
This FPI Mobile/Manufactured Home listed appliance comes
equipped with a dedicated #8 ground lug to which an 18
gauge copper wire from the steel chassis ground must be
attached.
This appliance may only be installed in an aftermarket
permanently located, manufactured (mobile) home,
where not prohibited by local codes.
This appliance is only use with the type of gas indicated
on the rating plate. This appliance is not convertible for
use with other gases, unless a certifi ed kit is used.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace3
Double Screen Door ...................................................54
Bay Door......................................................................55
Bay Trim ......................................................................55
Bay Louvers.................................................................55
Finishing Trim ..............................................................56
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace5
DO NOT REMOVE THIS LABEL / NE PAS ENLEVER CETTE ÉTIQUETTE
294
294
DOOR SEAL: Please
check that the door is
properly sealed
Minimum Clearances to Combustibles /
Degagement Minimum De Materiaux Combustibles
Serial No./ No de serie
918-499a
The "Bay Louvers"be
used with the Bay Glass option
MUST
MAY BE INSTALLED IN MANUFACTURED (MOBILE) HOMES AFTER FIRST SALE.
Duplicate S/N
B
B
32"
Ceiling
Wall
Wall
A
0" Clearance to
combustibles from:
Mantel Clearances from Top:
Side Wall Clearance
from Side Facing
Alcove Clearances:
Minimum Vent Clearances:
Top, sides, bottom and rear of unit
(A) Min. 7" (177mm)
B) 6" with Flush or Bay Front
B) 8" with Barcelona Trim
Alcove approved for
Bay & Flush Louvers.
Max. Depth 36" (914mm)
Min. Width 48" (1219mm),
Min. Height 72" (1229mm)
Vertical Vent1-1/4" (32mm)
Horizontal Top2" (51mm)
Horizontal Side 1-1/2" (38mm)
Horizontal Bottom 1-1/2" (38mm)
(See Instruction Manual for
detailed instructions)
ÉÉQUIP A L'UISINE POUR GAZ PROPANE
PROPANE GAS: Model P36-LP4
12"WC/C.E. (3.00 kPa)
11"WC/C.E. (2.74 kPa)
2.9"WC/C.E. (0.72 kPa)
Minimum supply pressure
Manifold pressure High
Manifold pressure Low
Pression d'allimentation minimum
Pression la tubulure d' chappement lev e
Pression la tubulure d' chappement basse
àééé
àé
30,000 Btu for altitude 0 - 2000 ft.
Maximum Input
Minimum Input
Orifice size
Altitude
30,000 Btu/h(8.79 Kw/h)
15,000 Btu/h(4.40 Kw/h)
#52DMS(1.61mm)
0-2000 ft/pi(0-610m)
D bit Calorifique maximum
D bit Calorifique minimum
Dimensions de l'orifice
L'altitude
é
é
Convertible to 25,000 Btu for altitude 2000 - 4500 ft. with Orifice part #: 904-345
Maximum Input
Minimum Input
Orifice size
Altitude
25,000 Btu/h(7.33 Kw/h)
12,600 Btu/h(3.69 Kw/h)
#53DMS(1.51mm)
2000-4500 ft/pi (610-1372m)
D bit Calorifique maximum
D bit Calorifique minimum
Dimensions de l'orifice
L'altitude
é
é
Minimum supply pressure
Manifold pressure high
Manifold pressure low
Orifice size
Minimum input
Maximum input
Altitude
NATURAL GAS: Model P36-NG4
APPAREIL FONCTIONNANT AU NATURAL GAS
CONCU POUR ETRE POELE: Mod le P36-NG4
Pression d'allimentation minimum
Pression à la tubulure d' chappement lev e
Pression à la tubulure d' chappement basse
Grandeur de l'injecteur
D bitminimum selon
D bitmaximum selon
l'altitude
Calorifique
Calorifique
é
ééé
é
é
é
5"(1.25 kPa)
3.8"(0.95 kPa)
1.1"(0.27 kPa)
#37 DMS
0-4500 ft/pi(0-1372 m)
WC/C.E.
WC/C.E.
WC/C.E.
15,500 Btu/h (4.54 kW)
30,000 Btu/h (8.79 kW)
This appliance must be installed in accordance with local codes, if any; if none, follow the National Fuel Gas Code, ANSI Z223.1, or Natural Gas and Propane Installation Code, CSA B149.1.
This appliance must be installed in accordance with theStandard CAN/CSA Z240 MH, Mobile Housing, in Canada,or with the Manufactured Home Construction andSafety Standard, Title 24 CFR,Part 3280, in the United
States, orwhen sucha standard isnot applicable,ANSI/NCSBCS A225.1/NFPA 501A,Manufactured Home InstallationsStandard orANSI A119.2 ou NFPA 501CStandard for RecreationalVehicles
This applianceis only foruse with the typeofgasindicated on therating plate andmay be installedin an aftermarket,permanently located, manufactured(mobile)homewhere not prohibitedby local codes.See owner's manual
for details.
Installer l'appareilselon lescodes ou règlementslocaux, ou,en l'absence detels règlements,selon les codesd'installation ANSIZ223.1, NationalFuel Gas Codeou CSA-B149.1en vigueur.
Installer l'appareil selon la normeCAN/CSA-Z240, Série MM, Maison mobiles ou CAN/CSA-Z240 VC, Véhicules decamping, ou lanorme 24 CFR Part 3280, Manufactured Home Construction and SafetyStandard. Si ces
This ventedgas fireplaceheater is notfor usewith air filters.Ne pasutiliser de filtreà airavec ce foyerau gazà évacuation.
Fan (Part# 432-917) Optional Bay Window(Part #510-930)Option: HeatWaveKit # 946-556
Electrical supply/ Électrique115VAC,1.13A, 60Hz.
Cet appareil doitêtre utilize uniquement avec le typede gaz indiqué sur laplaque signalétique. Cet appareil peut êtreinstallé dans une maison préfabriquéeou mobile (É.-U. seulement) installée àdemeure si les règlements
locaux lepermettent. Voirla noticede l'utilisateur pourplus derenseignements. Cet appareilne peutpas être utiliséavec d'autresgaz sauf siune troussede conversion certifiéeest fournie.
Made in Canada/
Fabrique au Canada
FPI Fireplace Products International Ltd.Delta, BC, Canada
Listed:
Certified for/Certifi e pour:
Tested to:
WN# 16444
CANADA and U.S.A.
CGA-2-17-M91, ANSI Z21.88a-2007 / CSA 2.33a-2007
VENTED GAS FIREPLACE HEATER / FOYER AU GAZ À ÉVACUATION
é
VENTED GAS FIREPLACE HEATER - NOT FOR USE WITH SOLID FUELS.
NE PAS UTILISER AVEC DUCOMBUSTIBLE SOLIDE.FOYER AU GAZ À ÉVACUATION -
SAFETY LABEL
This is a copy of the label that accompanies
each P36 Zero Clearance Direct Vent Gas
Fireplace. We have printed a copy of the
contents here for your review. The safety
label is located on the front inside base of
the unit, visible when the bottom louver
is open.
NOTE: FPI units are constantly being
improved. Check the label on the unit and
if there is a difference, the label on the unit
is the correct one.
SAFETY LABEL
For the State of Massachusetts, installation
and repair must be done by a plumber or
gasfi tter licensed in the Commonwealth of
Massachusetts.
For the State of Massachusetts, fl exible
connectors shall not exceed 36 inches in
length.
For the State of Massachusetts, the appliances individual manual shut-off must be a
t-handle type valve.
The State of Massachusetts requires the
installation of a carbon monoxide alarm in
accordance with NFPA 720 and a CO alarm
with battery back up in the same room where
the gas appliance is installed.
6
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
REQUIREMENTS
MA Code - CO Detector
(for the State of Massachusetts only)
5.08: Modifications to NFPA-54, Chapter 10
(2) Revise 10.8.3 by adding the following additional requirements:
(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for
residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than
seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall
be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled
equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is
installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery
operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure
served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of
qualified licensed professionals for the installation of hard wired carbon monoxide detectors
a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon
monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.
b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of
thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon
monoxide detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions
shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight
(8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The
sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL
OBSTRUCTIONS".
4. INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation
unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR
5.08(2)(a)1 through 4.
(b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:
1. The equipment listed in Chapter 10 entitled "Equipment Not Required To Be Vented" in the most current edition of NFPA 54 as adopted by
the Board; and
2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or
structure used in whole or in part for residential purposes.
(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product
Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the
instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system.
(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a
Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies
"special venting systems", the following requirements shall be satisfied by the manufacturer:
1. The referenced "special venting system" instructions shall be included with the appliance or equipment installation instructions; and
2. The "special venting systems" shall be Product Approved by the Board, and the instructions for that system shall include a parts list and
detailed installation instructions.
(e) A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions,
all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of
the installation.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace7
UNIT DIMENSIONS
33-1/4” (838mm)
36” (914mm)
DIMENSIONS
36” (940mm)
30-1/2” (775mm)
36” (914mm)
12-3/4” (324mm)
HAMPTON FACEPLATE DIMENSIONS
43-1/4” (1099mm)
32-1/2” (826mm)
1-1/4” (32mm)
32-1/4” (819mm)
8
31-1/4” (794mm)
29-1/2” (749mm)
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
IMPORTANT MESSAGE
SAVE THESE
INSTRUCTIONS
The P36-NG or P36-LP Direct Vent Fireplace
must be installed in accordance with these
instructions. Carefully read all the instructions
in this manual fi rst. Consult the "authority
having jurisdiction" to determine the need for
a permit prior to starting the installation. It is
the responsibility of the installer to ensure
this fi replace is installed in compliance with
manufacturer's instructions and all applicable
codes.
BEFORE YOU ST ART
Safe installation and operation of this appliance
requires common sense, however, we are
required by the Canadian Safety Standards
and ANSI Standards to make you aware of
the following:
INSTALLATION AND REPAIR SHOULD
BE DONE BY AN AUTHORIZED
SERVICE PERSON. THE APPLIANCE
SHOULD BE INSPECTED BEFORE
USE AND AT LEAST ANNUALLY BY A
PROFESSIONAL SERVICE PERSON.
MORE FREQUENT CLEANING MAY
BE REQUIRED DUE TO EXCESSIVE
LINT FROM CARPETING, BEDDING
MATERIAL, ETC. IT IS IMPERATIVE THAT
CONTROL COMPARTMENTS, BURNERS
AND CIRCULATING AIR PASSAGEWAYS
OF THE APPLIANCE BE KEPT CLEAN.
DUE TO HIGH TEMPERATURES, THE
APPLIANCE SHOULD BE LOCATED
OUT OF TRAFFIC AND AWAY FROM
FURNITURE AND DRAPERIES.
WARNING: FAILURE TO INSTALL THIS
APPLIANCE CORRECTLY WILL VOID
YOUR WARRANTY AND MAY CAUSE A
SERIOUS HOUSE FIRE.
CHILDREN AND ADULTS SHOULD BE
ALERTED TO THE HAZARDS OF HIGH
SURFACE TEMPERATURES, ESPECIALLY THE FIREPLACE GLASS, AND
SHOULD STAY AWAY TO AVOID BURNS
OR CLOTHING IGNITION.
YOUNG CHILDREN SHOULD BE CAREFULLY SUPERVISED WHEN THEY ARE
IN THE SAME ROOM AS THE APPLIANCE.
CLOTHING OR OTHER FLAMMABLE
MATERIAL SHOULD NOT BE PLACED
ON OR NEAR THE APPLIANCE.
GENERAL SAFETY
INFORMATION
1) The appliance installation must conform
with local codes or, in the absence of local
codes, with the current Canadian or National
Gas Codes, CAN1-B149 or ANSI Z223.1
Installation Codes.
2) The appliance when installed, must be electrically grounded in accordance with local
codes, or in the absence of local codes with
the current National Electrical Code, ANSI/
NFPA 70 or CSA C22.1 Canadian Electrical
Code.
3) See general construction and assembly
instructions. The appliance and vent should
be enclosed.
4) This appliance must be connected to the
specifi ed vent and termination cap to the
outside of the building envelope. Never vent
to another room or inside a building. Make
sure that the vent is fi tted as per Venting
instructions.
5) Inspect the venting system annually for
blockage and any signs of deterioration.
6) Venting terminals shall not be recessed into
a wall or siding.
7) Any safety glass removed for servicing must
be replaced prior to operating the appliance.
8) To prevent injury, do not allow anyone who
is unfamiliar with the operation to use the
fi replace.
9) Wear gloves and safety glasses for protection while doing required maintenance.
10) Be aware of electrical wiring locations in
walls and ceilings when cutting holes for
termination.
11) Under no circumstances should this
appliance be modifi ed. Parts that have to be
removed for servicing should be replaced
prior to operating this appliance.
12) Installation and any repairs to this appliance
should be done by a qualifi ed service per-
son. A professional service person should
be called to inspect this appliance annually.
Make it a practice to have all of your gas
appliances checked annually.
13) Do not slam shut or strike the glass door.
14) Under no circumstances should any solid fuels
(wood, paper, cardboard, coal, etc.) be used
in this appliance.
15) The appliance area must be kept clear and
free of combustible materials, (gases and
other fl ammable vapours and liquids).
Emissions from burning wood or gas could
contain chemicals known to the State of
California to cause cancer, birth defects or
other reproductive harm.
INSTALLATION
CHECKLIST
1) Locate appliance. Refer to the following
sections:
a) Locating Your Gas Fireplace
b) Clearances
c) Combustible Mantel Clearances
d) Framing & Finishing
e) Venting
2) Assemble Top Standoffs and Top Facing
Support and Side Nailing Strips (Refer to the
"Unit Assembly Prior to Installation" section).
NOTE: Must be done before installing unit
into fi replace.
3) Install vent (Refer to the "Venting"
sections).
4) Make gas and electrical connections. Test
the pilot. Must be as per diagram (Refer to
the "Pilot Adjustment " section).
Convert to propane if desired (Refer to the
"SIT Valve Description" section).
5) Install standard and optional features.
Refer to the following sections where
applicable:
a. Optional Brick Panels
b. Log Set Installation
c. Standard Flush Door
d. Regency Flush or Bay Fronts
e. Hampton Cast Faceplate
f. Remote Control
g. Wall Switch
h. Wall Thermostat
i. Fan Installation
6) Final check.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace9
Before leaving this unit with the customer,
the installer must ensure that the appliance is
fi ring correctly and operation fully explained
to customer.
INSTALLATION
This includes:
1) Clocking the appliance to ensure the correct
fi ring rate (rate noted on label 30,000 Btu/h)
after burning appliance for 15 minutes.
2) If required, adjusting the primary air to
ensure that the fl ame does not carbon.
First allow the unit to burn for 15-20 min.
to stabilize.
CAUTION:
Any alteration to the product that causes
sooting or carboning that results in
damage is not the responsibility of the
manufacturer.
LOCATING YOUR
GAS FIREPLACE
1) When selecting a location for your fi replace,
ensure that the clearances outlined on this
page are met.
2) Provide adequate clearances for
servicing.
3) The appliance must be installed on a fl at,
solid, continuous surface (e.g. wood, metal,
concrete). This may be the fl oor, or raised up
on a platform to enhance its visual impact.
If the appliance is going to be installed
on carpeting, combustible linoleum tile or
other combustible material other than wood
fl ooring, the appliance must be installed on
a metal or wood panel extending the full
width and depth of the appliance.
4) The P36 Direct Vent Gas Fireplace can be
installed in a recessed position or framed
out into the room as in A, B, C, D. See
Diagram 1.
Diagram 1
A) Flat on Wall
B) Flat on Wall Corner
C) Recessed into Wall/Alcove
D) Corner
5) This appliance is Listed for bedroom
installations when used with a Listed Millivolt
Thermostat. Some areas may have further
requirements, check local codes before
installation.
6) The P36 Direct Vent Gas Fireplace is
approved for alcove installations, which
meet the clearances listed on this page.
7) We recommend that you plan your installation
on paper using exact measurements for
clearances and fl oor protection before
actually installing this appliance. Have a
qualifi ed inspector, dealer, or installer review
your plans before installation.
Note: For vent terminations see the
"Exterior Vent Termination
Locations" section.
MANUFACTURED
MOBILE HOME
ADDITIONAL
REQUIREMENTS
1) Ensure that structural members are not cut
or weakened during installation.
HEATWAVE
DUCT SYSTEM
OPTIONAL KIT #946-556
The HeatWave Air Duct Kit increases the
effectiveness of your fi replace by dispersing
warm air from the fi replace to remote locations in
the same room or other rooms in your home.
Up to two kits may be installed on the
fi replace.
Please Note: Only 1 HeatWave kit may be
operated at one time. This includes the internal
blower option as well.
The HeatWave Duct Kit has different
clearance and framing requirements, check
the HeatWave manual for details.
OPTIONAL
HEAT RELEASE KIT
#946-570
The Heat Release Kit expels warm air from
the fi replace to the outside of the building,
allowing the fi replace to be operated with less
heat entering the room. The kit may be used on
either the left or right side.
10
2) Ensure proper grounding using the #8
ground lug provided. See the "Alternate
Wiring Diagram for Wall Switch" section.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
CLEARANCES
The clearances listed below are Minimum distances unless otherwise stated:
A major cause of chimney related fi res is failure to maintain required clearances (air space) to combustible materials. It is of the greatest
importance that this fi replace and vent system be installed only in accordance with these instructions.
IMPORTANT: See the "Barcelona Series Framing Note" section for framing note on Barcelona Trim. See the "Regency
Clearance to Combustibles from:
Back 0" (0mm)
Side 0" (0mm)
Floor 0" (0mm)
NOTE: The minimum fl oor clearance must be maintained from the top surface of the carpeting, tile, etc.
Minimum Clearance from Top of Unit to:
Ceiling from top of unit. 32" (1016mm)
Side Wall Clearances:
Bay or Flush Front 6"* (152mm)
Barcelona Trim 6"* (152mm)
Cast Faceplate 6"* (152mm)
Kensington Front 6"* (152mm)
Balmoral 6"* (152mm)
Full Screen Doors 6"* (152mm)
* Measured from Surround or Front. See the "Regency Clearances for dimensions" section.
Horizontal Vent Clearances:
Top 2" (51mm)
Side 1-1/2" (38mm)
Bottom 1-1/2" (38mm)
Vertical Vent Clearances 1-1/4" (32mm)
Tripoli Screen Door Series Framing Note" section for framing note on Tripoli Screen Door.
Alcove Clearances**:
Max. Depth 36" (914mm)
Min. Width 48" (1219mm)
Min. Height 72" (1829mm)
**Approved for one sidewall installation only when using Barcelona Trim.
WARNING: Fire hazard is an extreme risk if these clearances are not adhered to.
The HeatWave Duct Kit and the Heat
Release Kit have different clearance
and framing requirements, check the
Heat Release Kit
HeatWave and Heat Release manual
for details.
T o install the combination of the Barcelona front and screen doors you
Barcelona & Double Screen Door Installations
must use non-combustible mantel in conjunction with the already
required framing specs for the Barcelona front. Steel studs and
non-combustible material on the facing must be adhered to.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace11
REGENCY® CLEARANCES
INSTALLATION
Clearances for Bay Front, Flush Front
& Full Screen Doors
TRIPOLI SCREEN
DOOR CLEARANCES
Clearances for Barcelona Trim
HAMPTON® CLEARANCES
12
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
Diagram 3
is made of metal studs covered with a non-combustible board.
Note: A non-combustible mantel may be installed at a lower height if the framing
SERIES COMBUSTIBLE MANTEL CLEARANCES
®
REGENCY
Diagram 2
Diagram 1
Because of the extreme heat this fi replace emits, the mantel clearances are critical.
Combustible mantel clearances from top of unit are shown in Diagrams 1, 2, & 3.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace13
These drawings are to scale at 1:6 (one inch = 6 inches)
Mantel can be installed anywhere in shaded area or higher using the above scale.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.
INSTALLATION
REGENCY® SERIES COMBUSTIBLE MANTEL CLEARANCES
Because of the extreme heat this fi replace emits, the mantel clearances are critical.
Combustible mantel clearances from top of unit are shown in the diagram below.
Note: A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible
board.
These drawings are to scale at 1:6 (one inch = 6 inches)
Mantel can be installed anywhere in shaded area or higher using
the above scale.
Note: Ensure the paint that is used on the mantel and the
facing is "heat resistant" or the paint may discolour.
HAMPTON® COMBUSTIBLE MANTEL CLEARANCES
Because of the extreme heat this fi replace emits, the mantel clearances are critical.
Combustible mantel clearances from top of unit are shown in the diagram below.
Note: A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible
board.
These drawings are to scale at 1:6 (one inch = 6 inches)
Mantel can be installed anywhere in shaded area or higher using
the above scale.
Note: Ensure the paint that is used on the mantel and the
facing is "heat resistant" or the paint may discolour.
Mantel Clearances with
Hampton Cast Faceplate
®
7"
14
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
MANTEL LEG CLEARANCES
Combustible mantel leg clearances as per diagram:
REGENCY®
Maximum 1-1/2" projection
at 2" minimum clearance.
HAMPTON® & BARCELONA FRONT
MANTEL LEG CLEARANCES
Combustible mantel leg clearances as per diagram:
Hampton Cast Faceplate Width: 43-1/4"
Barcelona Trim Width: 40"
Maximum 1-1/2" projection
at 2" minimum clearance.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace15
FRAMING AND FINISHING
INSTALLATION
IMPORTANT FINISHING DETAIL NOTE:
When installing tile, carpeting, or any other
fi nishing material in front of the unit, the
top of the surface of the tile, carpeting, etc.
must not be any higher than the base of
the fi replace. Any higher and the optional
accessories will not fi t (i.e. fi nishing trim,
surrounds, etc.)
Floor Finishing Material
NOTE: Floor Finishing Material
must not be any higher than the
base of the fi replace.
1) Determine the total thickness of facing
material (e.g. drywall plus ceramic tiles) to
allow the fi nished surface to be fl ush with
the front of the unit. Total facing thickness
can vary from 1/2" (13mm) to 1-1/4" (32mm)
thick.
2) Frame in the enclosure for the unit with
framing material. The framed opening is
36-1/4" high x 36-1/4" wide x 12-3/4" deep
(921mm high x 921mm wide x 324mm
deep).
Note: Header must be installed vertically. If
Header is installed horizontally, it must be
steel.
3) For exterior walls, insulate the enclosure to
the same degree as the rest of the house,
apply vapour barrier and drywall, as per
local installation codes. (Do not insulate
the fi replace itself.)
4) The top of the unit must not be closer than
32" (813mm) to the ceiling.
Top Header
10" dia. hole
1/2"
Drywall
2"
3-1/2"
Opening for gas
connection
4"
through wall
for Flex
or for DuraVent
12-3/4"
36"
32-1/2"
40-1/2"
Top Facing
Drywall
Support
(or other
facing)
Install Side Nailing Strips, Top Facing
Support, and Top Standoffs before unit
is slipped into position. See the "Unit
Assembly Prior to Installation" section for
assembly details.
6” (152mm)
Standoff
Top of unit
NOTE: See next page for important
Barcelona Series framing note.
Framing Dimensions
A B C D
36-1/4" 36-1/4" 12-3/4" 46"*
921mm 921mm 324mm 1168mm*
* 'D' is Minimum height to combustible materials including the Minimum 2" (51mm) Top
clearance to the Horizontal Vent.
Note: 40-1/2" (1029mm) is the minimum
height for both fl ex termination or
rigid pipe venting.
Note: The unit does not have to be
completely enclosed in a chase. The
clearance on top of the unit is 0" to
the standoffs so combustible building
materials can be laid directly on top
of the standoffs. You must maintain
1-1/2" (38mm) clearance from the
vent to combustible materials for fl ex
(1-1/4" for Rigid Pipe).
5) Use steel studs for framing where the 1-
1/2" (38mm) clearance from the vent to
combustible material cannot be maintained,
e.g. front top header.
16
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
Steel
Stud
Steel
Stud
Min. 12"
(305mm)
Min. 6"
(153mm)
Min. 6"
(153mm)
36-1/4"
(920mm)
30-1/2"
(775mm)
36-1/4"
(921mm)
Front Framing Dimensions using the
Barcelona Series Option
Non-combustible
Material
INSTALLATION
BARCELONA SERIES FRAMING NOTE
When installing the optional Barcelona Front a non-combustible material 12" (305mm) above the unit and 6" (153mm) on each side must be used.
See Diagram 1.
The Barcelona Front also requires steel stud framing above and on each side of the unit. See Diagram 1.
Diagram 1
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace17
INSTALLATION
REGENCY® TRIPOLI SCREEN DOOR SERIES FRAMING NOTE
When installing the optional Tripoli Screen Door Series, a non-combustible material 12" (305mm) above the unit and 6" (153mm) on each side
must be used (see Diagram 2). For complete framing details see page 57.
The Tripoli Screen Door Series also requires steel stud framing above and on each side of the unit (refer to Diagram 2).
18
Diagram 2
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
Side
Nailing Strips
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The T op Facing Support, the Side Nailing Strips
and the 2 Top Standoffs must be correctly
positioned and attached to the top before unit
is slipped into position.
Top Standoff Assembly
The top standoffs are shipped in a fl at position
and must be folded into shape and attached.
1) Remove the standoffs from the fi replace top.
2) T ake each standoff and bend into the correct
shape. Bend up at the bend lines until the
screw holes in the standoff and the prepunched screw holes on the fi replace top
line up.
3) Attach the standoff securely to the top with
2 screws per standoff (on opposite corners).
Top Facing Support &
Side Nailing Strips
Determine the total thickness of facing material
(e.g. drywall plus ceramic tiles) to allow the
fi nished surface to be fl ush with the front of the
unit. Total facing thickness can vary from 1/2"
(13mm) to 1-1/4" (32mm) thick.
The Top Facing Support can be mounted in 3
different positions depending on the thickness
of the facing material.
Screw
Position
A 1/2" / 13mm
B7/8" / 22mm
C* 1-1/4" / 32mm
* For "C" screw position the top facing
support is reversed.
1) Mount Top Facing Support using the
3 supplied screws into the three prepunched screw holes on the top front of
the unit. Use hole positions A, B, or C
depending on your facing depth.
Facing Material
Depth
"C" Screw Position:
For a facing material depth of 1-1/4" (32mm),
the top facing support must be reversed.
2) Fold out the two nailing strips on each side.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace19
VENTING
INTRODUCTION
The P36-1 uses the "balanced fl ue" technology
Co-Axial system. The inner liner vents products
of combustion to the outside while the outer
liner draws outside combustion air into the
combustion chamber thereby eliminating the
need to use heated room air for combustion and
losing warm room air up the chimney.
Note: These flue pipes must not be
connected to any other appliance.
The gas appliance and vent system must be
vented directly to the outside of the building,
and never be attached to a chimney serving a
separate solid fuel or gas burning appliance.
Each direct vent gas appliance must use it's own
separate vent system. Common vent systems
are prohibited.
INSTALLATION
EXTERIOR VENT TERMINATION LOCATIONS
1
Minimum Clearance Requirements
A
Clearance above grade, veranda, porch, deck, or balcony12"(30cm)12"(30cm)
B
Clearance to window or door that may be opened 12"(30cm)9" (23cm)
C
Clearance to permanently closed window**
D
Vertical clearance to ventilated soffi t located above the terminal within a horizontal distance of 2 feet (61cm)
from the center line of the terminal (check with the local code)
E
Clearance to unventilated soffi t15"(38cm)15"(38cm)
F
Clearance to outside corner: with AstroCap Termination Cap. 6"(15cm)6"(15cm)
Clearance to outside corner: with all other approved Termination Caps.14"(36cm)14"(36cm)
G
Clearance to inside corner: with AstroCap Termination Cap 6"(15cm) 6"(15cm)
Clearance to inside corner: with all other approved Termination Caps.12"(30cm)12"(30cm)
H
Clearance to each side of center line extended above meter/regulator assembly 36"(90cm)
J
Clearance to service regulator vent outlet36"(90cm)*
K
Clearance to non-mechanical air supply inlet to building or the combustion air inlet to any other appliance12"(30cm)9" (23cm)
L
Clearance to a mechanical air supply inlet
#3' (91cm) above if within 10' (3m) horizontally.
M
Clearance above paved sidewalk or a paved driveway located on public property 84"(2.1m)
N
Clearance under veranda, porch, deck, or balcony 12"(30cm)
1
In accordance with current CSA B149.1, Natural Gas and Propane Installation Code
2
In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code
┼
A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.
‡ Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the fl oor.
Clearance in accordance with local installation codes and the requirements of the gas supplier
*
a
3 feet (91cm) within a height of 15 feet (4.5m) above the meter / regulator assembly
b
3 feet (91cm) above - if within 10 feet (3m) horizontally
Canada
18"(46cm)18"(46cm)
a
72"(1.8m)36"(90cm)
┼
‡
USA
*
*
*
2
b
20
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
VENTING
DIRECT VENT SYSTEM (FLEX)
HORIZONTAL TERMINATIONS ONLY
These venting systems, in combination with the P36 Direct Vent Gas Fireplace, have been tested and listed as a direct vent heater system by
Warnock Hersey . The location of the termination cap must conform to the requirements in the V ent Terminal Locations diagram in the "Exterior Vent
Termination Locations" section.
FPI Direct Vent (Flex) System T ermination Kit (Part # 946-515) includes all the parts needed to install the P36 with a maximum run of 4 feet.
1)6-7/8" dia. fl exible liner (4 ft. length)
2)4" dia. fl exible liner (4 ft. length)
3)spring spacers (4)
4)thimble (2)
5)AstroCap termination cap (1)
6)screws (12)
7)tube of Mill Pac (1)
8)plated screws (8)
9)screws #8 x 1-1/2" Drill Point, Stainless
Steel (4)
If longer runs are needed, the FPI Direct
Vent system (Flex) # 946-516 includes all
the parts needed to install the P36 with a
maximum 10' run.
1)6-7/8" dia. fl exible liner (10 ft. length)
2)4" dia. fl exible liner (10 ft. length)
3)spring spacers (7)
4)thimble (2)
5)AstroCap termination cap (1)
6)screws (12)
7)tube of Mill Pac (1)
8)plated screws (8)
9) screws #8 x 1-1/2" Drill Point, Stainless
Steel (4)
Notes:
1) Liner sections should be continuous without any joints or seams.
2) Only Flex pipe purchased from FPI may be used for Flex installations.
3) If you are installing the P36 into a FPI Cabinet Mantel Kit, use the minimum horizontal vent height (centre-line of 40-1/2"). Remember
to include the mantel base (3" in height) in your calculations and to maintain the 2" clearance to the underside of the mantel top.
FPI P36-4 Zero Clearance Direct Vent Gas Fireplace21
Loading...
+ 48 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.