
WARNING!!
· Remove hardware from box and sort by size.
· Please check to see that hardware and parts are
Attach the headboard post (P1)
.
1
to the headboard (P2).
You will need to use
hardware :
A = 4pcs
C = 4pcs
D = 4pcs
E = 20pcs
present prior start of assembly.
· Please follow attached instruction in the same
sequence numbered to ensure fast and easy
assembly.
· Do not use this bed if any part is broken, torn
or missing.
· The assembly of this product requires two
people.
· Do not use any power tools as this may damage
the frame and will invalidate any claim.
C
2.
3.
C
C
Attach the headboard (P2)
using hardware :
G = 5pcs
Attach the side rail (P3)
to the headboard (P2) and
footboard (P4) using
hardware :
A = 8pcs
C = 8pcs
D = 8pcs
E = 4pcs
P1
P2
P3
P4
P5
P6
P7
PART LIST
Headboard Post = 2pcs
Headboard = 1pcs
Side Rail = 2pcs
Footboard = 1pcs
Centre Rail = 1pcs
Support leg = 2pcs
Bed Slats (F) = 14pcs
Bed Slats (Q/K) = 15pcs
4.
5.
G
B
G
G
G
Fix the adjuster (F) to the
support leg (P6) using
hardware :
F = 2pcs
Attach the support legs (P6)
to the centre rail (P5)
using hardware :
B = 2pcs
Attach the centre rail (P5)
to the headboard (P2) and
footboard (P4) using
hardware :
G = 2pcs
Lay the slats (P7) between the
side rail (P3) using hardware :
G = 28pcs (F)
or
G = 30pcs (Q/K)
Attach the slats (P7) to the
centre rail (P5) using
hardware :
A
B
C
D
E
F
G
H
HARDWARE LIST
M6 x 90mm JCBC
M6 x 50mm JCBC
BARREL NUT
WOODEN PLUG
Ø8 x 35mm WOOD DOWEL
ADJUSTER
M4 X 25mm SCREW (F)
M4 X 25mm SCREW (Q/K)
ALLEN KEY
12pcs
2pcs
12pcs
12pcs
24pcs
2pcs
38pcs
40pcs
1pcs
G = 3pcs