Page 1

INSTALLATION INSTRUCTIONS
Page 2

The Ultra Changing Station Makes One Person
Installation Ultra Simple!
When selecting your installation location be aware of ADA guidelines if applicable. Specic ADA
compliant sections can be found listed in the changing station instructions
Before we begin, unseal the box and remove the contents. Enclosed is the Changing Station and
The EZ Mount Backer Plate, along with all of the screws, anchors, washers, and screw caps
needed for installation. Also included is a set of keys and a Liner Starter Kit, including a small
stack of liners, for the built-in liner dispenser.
2
Page 3

Step One
First we will install the EZ Mount Backer Plate
onto the wall. The backer plate will be taped to
the back of the unit and looks similar to
a metal bar.
Using a studnder and pencil, mark the area
where the studs are on the wall.
Place the EZ Mount Backer Plate ush against
the wall where you’ve marked the studs and
make sure it is level.
Note that wood, metal, tile, and concrete block
walls have different installation instructions for
each type of wall. Use the instructions and
diagrams in the packet to determine
installation steps for your specic wall type
before drilling into the wall.
Step Two
Drill the holes into the areas on the wall
that you marked with the pencil using the
designated drill bit size. Depending on the
type of wall you have, you may need to
use an anchor.
3
Page 4

Step Three
Line up the Mounting Bracket with the holes
you have drilled. You will be screwing the
Mounting Bracket into the wall using the
Mounting Screws that were included.
Step Four
Place the Screw into the Mounting Bracket and
align it with the holes you drilled into the wall.
Screw the Mounting Bracket into the wall.
Step Five
Next, hang the lip that’s located on the back
side of the Changing Station onto the
Mounting Bracket making sure that the
changing station is secure.
Now that the lip of the Changing Station is
securely resting on the Mounting Bracket, you
can open the Changing Station.
4
Page 5

Step Six
Use a pencil to mark the holes in each corner
of the Changing Station. This marks where
you’ll be drilling holes into the wall for the
Changing Station. Take the unit off the bracket
and set it aside.
Step Seven
Drill the 4 holes into the wall on the areas
that you marked with pencil. Drill the holes
into the wall using the appropriate drill bit and
mounting hardware for your substrate. You
will now be able to put the changing station
back on the wall.
Step Eight
You will be using a combination of the washers,
screws, and anchors (if necessary) to screw the
changing station into the wall in the holes that
you have drilled.
5
Page 6

Step Nine
Place each Washer on top of the hole you
drilled into the wall for each corner of the
Changing Station. Then place each Screw
through the washer and into the hole.
Screw the Changing Station into the wall.
Step Ten
Repeat this process for all 4 corners.
Step Eleven
Now it’s time to add the nishing touches for
an ULTRA sleek nish.
Grab the Screw Caps that were included
and place them over the holes to cover all
4 of the Screws.
Wow! Now that’s an
ULTRA sleek nish.
Questions or Comments?
Please contact Customer Service at
877.716.2757 (U.S. only) or 330.722.5033.
Monday-Friday 8:00-5:00 EST
6