Forest garden Ultima Arch, UPARTHD Assembly Manual

ULTIMA ARCH ASSEMBLY
SHOULD YOU REQUIRE ANY ADDITIONAL GUIDANCE WITH THE ASSEMBLY OF YOUR ARBOUR PLEASE CONTACT OUR TECHNICAL HELP LINE ON 0844 248 9853.
ISSUE 0210
“IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY”
Thank you for choosing this arch manufactured by the UK's largest manufacturer of timber garden products. In order to gain the most benefit from it, please note the following:
- If there are any technical queries with the product, please contact our customer help line on 0844 248 9853 between the hours of 8.30 am and 5.00 pm Mondayto Friday.
-This product is pressure treated to ensure the longevity of all timber components and protect against rot. This may leave a colour difference on some parts that will even out as a the moisture content stabilises.
- Please ensure that you thoroughly check all component parts for quantity and quality before you commence building the product. If there are any missing parts, please contact the help line as shown immediately. The manufacturer cannot be held liable for damaged items once any part of the product has been fitted or altered in any way (e.g. Painted)
- Timber is a natural material. It will shrink and swell as a result of varying moisture content.
- Please keep all plastic bags and small parts away from children in order to reduce the risk of suffocation.
Important :
Fixing Pack Contents (UPARTFP) :
4
Assembly of this arch requires two people.
Required Tools : (Not Supplied )
DRILL
POZI DRIVE SCREWDRIVER
HAMMER
TAPE MEASURE
SPIRIT LEVEL
50mm Screw x 24
4
UPARTSU POST 2400mm
2
UPARTNRLN LARGE NOTCHED RAFTER
70mm Screw x 10
2
ELD62 PLANED LATTICE 6x2ft
3
UPARTNRSN SMALL NOTCHED
UCBC ANGLED BRACE
2
URCB6 LONG RAFTER
Helpful Tip : use the illustration of the screw/nail shown in each step to help you identify which fixing is required during the assembly of your arch.
1820
1465
1355
2447,5
790
Please note : arbour uprights will need to be concreted 465mm into ground. Alternatively, if using post supports, you will be required to trim 465mm off the bottom of each post.
Forest Garden Ltd, Units 291 & 296 Hartlebury Trading Estate, Hartlebury, Worcestershire, Dy10 4JB
1
MUST PRE DRILL MUST PRE DRILL
50mm
50mm
Secure the lattice (ELD62) between two posts (UPARTSU) using 2x50mm screws through the lattice framing into the post. Make sure the lattice is positioned as shown with drainage holes to the bottom of the assembly. Repeat on both sides and construct 2.
50mm
50mm
50mm
8
X2
ISSUE 0210
2
70mm
6
8
Attach the rafters with
small notches
(UPARTNRSN) to the
large rafters (URCB6)
using 70mm screws
one in the centre and 2
300mm either side.
50mm
70mm
505
70mm
70mm
70mm
50mm
70mm
70mm
NOTE IT IS SOMETIMES EASIER TO ATTACH RAFTER
ASSEMBLY WHILE PRODUCT IS LAY ON THE GROUND
Position the rafter assembly into the slots. Make sure the post assemblies are 1325mm apart. Secure using 2x50mm screws through post into rafter as shown.
50mm
3
4
MUST PRE DRILL
70mm
70mm
70mm
70mm
70mm
Position the large notched rafters
(UPARTNRLN) in the centre of the posts onto
the large rafter and secure using 70mm
screws.
4
MUST PRE DRILL
Position the angled braces (UCBC) So that they are flat onto the uprights and the long rafters. Secure using 1x50mm through each end.
Forest Garden Ltd, Units 291 & 296 Hartlebury Trading Estate, Hartlebury, Worcestershire, Dy10 4JB
8
50mm
50mm
Loading...