![](/html/40/4080/408019466678874b06ec558ae9d0522b58bb26fcae43fffca8ad7663ed110dbb/bg1.png)
Package Contents
A. Pro-Fill Valves (6)
B. Flexible Manifolds (2)
C. Quick Connect Coupler (1)
D. Dust Cap (1)
E. Red End Caps (9)
F. Pro-Fill Tubing (5’)
Important
they have been neglected and the
B
E
A
D
C
Illustraon purposes only. Actual product is subject to change.
1 2
F
.derevoc era setalp lla os llec hcae
installing and using Pro-Fill to top
been neglected and then charging
can cause the water level to expand
in the loss of electrolyte. Once ProFill is installed, monthly topping
extremely low water level to occur.
3
Link manifolds/valves together with ProFill tubing. Cut the desired length of
tubing from the open end of the included
Remove exisng vent covers and install
Pro-Fill valves by inserng into baery
and tuning ¼ rotaon to lock into place.
4
the system. Do not connect more than six
Install the flexible manifold by carefully
pushing and rotang swivel tee into each
valve unl it snaps into place.
5
Cover any remaining barbs with red end
BL-189
03/14
![](/html/40/4080/408019466678874b06ec558ae9d0522b58bb26fcae43fffca8ad7663ed110dbb/bg2.png)
Important
charging.
1 2
Remove the dust cap from the water
supply line and connect it to the squeeze
couplers together.
3
When the bulb becomes hard, all cells are
full.
Notes:
1.
2.
3.
below freezing.
4
Immediately disconnect the squeeze bulb
and replace the dust cap.
5
Any water remaining in the squeeze bulb
Patent Pending
BL-189
03/14