FlowCon SM 50-250mm Installation And Operation Instruction Manual

FlowCon SM 50-250mm
INSTALLATION AND OPERATION INSTRUCTION
FlowCon SM 50-250mm, 2”-10”
DYNAMIC SELF BALANCING
CONTROL VALVE
Install the FlowCon SM valve either in the sup­ply or return pipework for the unit. It is recom­mended that a strainer be installed prior to the valve body to prevent damage or blockage due to debris. INSTALL THE VALVE HOUSING WITH THE
FLOW DIRECTIONAL ARROW POINTING IN THE CORRECT DIRECTION.
The valve body is available for double flange connections, i.e figure 1.
O-rings are supplied with the valve body and are used to seal the connections. Please make sure these are in place in the o-ring grooves in the inlet and
outlet of the valve body, when
installing the housing.
FlowCon SM.6 (200-250mm) contains two o-ring grooves (figure 2). Sealing is done on smallest diameter groove if 200mm flanges are used and on the largest diameter groove if 250mm flanges are used.
O-ring Groove
200mm anges
O-ring Groove
250mm anges
Figure 2
recommended to grease the o-rings with a
It is silicone grease before installation. IMPORTANT: Never use mineral oil or petrol based grease or oil on the o-rings.
Valve bodies are as standard supplied with pressure/temperature fittings (p/t plugs). Before finger mounting the p/t plugs in the body tappings, please seal the threads of the p/t plugs (DO NOT OVER TIGHTEN).
Figure 1
1A95106 - 08/2016
Denmark Dubai USA Singapore www.owcon.com
FlowCon International assumes no responsibility
for mistakes, if any, in any printed material.
FlowCon SM 50-250mm
360º
Fitting and orientation of the actuator
To fit the actuator on the valve body, please grease the o-ring on the spindle adaptor and place the spindle adaptor on the valve spindle. Place the actuator on the spindle adaptor and place the three actuator “legs” into the three holes in the mounting bracket. Make sure that the snap ring is clicked onto the mount­ing bracket, so that the snap ring is locked at the top of the mounting bracket, but is able to rotate. Then turn the snap ring counter clockwise (upside view) approximately 1/6 of a turn until its stop points touch the actua-
The bottom side of the actuator
DYNAMIC SELF BALANCING
CONTROL VALVE
tor “legs” and the mounting is locked with a (small) click (please see figure 3 and 4).
To remove the actuator, please reverse the procedure, i.e. turn the snap ring clockwise until the actuator is loosened and lift the ac­tuator up (fig. 5). To ease removal of actuator, make sure that the valve is not fully closed.
Symbols at the bottom side of the actuator also indicate how to lock and unlock the actu­ator with the snap ring.
Spindle adaptor
Snap ring
Figure 3
Figure 6
“Actuator legs”
360º
Snap ring:
Stop points
Figure 5Figure 4
1A95106 - 08/2016
Denmark Dubai USA Singapore www.owcon.com
FlowCon International assumes no responsibility
for mistakes, if any, in any printed material.
FlowCon SM 50-250mm
Analog - With feedback
Black
Blue
White
Green
Common 24 VAC/VDC Control Signal Feedback
Analog - With feedback
Digital - 2 position - With feedback
Black
Blue
White
Green
Common 24 VAC/VDC Control Signal Feedback
Analog - With feedback
Supply
24 VAC/VDC
Black
Blue
White
Red
Green
Common 24 VAC/VDC Open if NC, Close if NO Close if NC, Open if NO Feedback
Digital - 2 position - With feedback
Digital - 3 point floating - With feedback
Wiring instructions
Analog
DYNAMIC SELF BALANCING
CONTROL VALVE
Black
Blue
White
Green
Common 24 VAC/VDC Control Signal Feedback
Digital - 2 position
Supply
24 VAC/VDC
Black
Blue
White
Red
Green
Common 24 VAC/VDC Open if NC, Close if NO Close if NC, Open if NO Feedback
Digital - 3 point oating
Black
Blue
Supply
24 VAC/VDC
If feedback signal is not required, leave green wire detached.
Start-Up sequence
When power to the actuator is turned on, the actuator will automatically calibrate:
White
Red
Green
Common 24 VAC/VDC Open if NC, Close if NO Close if NC, Open if NO Feedback
• Valve is calibrating to determine closing point. This calibration can take up to 10 minutes depending on the valve’s position at start-up. During calibration lower part of display will show “CAL”.
• If no control signal is detected, flush is start­ ed if enabled in programming menu (enabled by default), opening valve to 5/6 of fully open. Lower part of display will show “FLUSH” until control signal is detected.
• When control signal is present, actuator will adjust to current control signal and proceed with normal operation.
At first start-up please enter programming menu to adjust actuator settings.
1A95106 - 08/2016
Denmark Dubai USA Singapore www.owcon.com
FlowCon International assumes no responsibility
for mistakes, if any, in any printed material.