P/N 511-26080-00
WITH PATENTED EASY LEVEL LEG SYSTEM
ASSEMBLY INSTRUCTIONS
Floe International Inc.
48473 State Hwy. 65
McGregor, MN 55362
www.floeintl.com
Card Contents (511-04265-00)
Step
001-70215-00
001-70217-00
001-70210-00
001-70219-00
001-71023-00
001-76072-00
6
8
8
2
48
24
HHCS, 1/2-13 x 3” SS 18-8
HHCS, 1/2-13 x 3 1/2” ss 18-8
HHCS, 1/2-13 x 1 3/4” ss 18-8
HHCS, 1/2-13 x 4” ss 18-8
FLAT WASHER, .5 ID x .75 OD ss
NUT, 1/2-13 ALUMINUM NYLOCK
60 ft. lbs.
45 ft. lbs.
45 ft. lbs.
60 ft. lbs.
001-70218-00
001-76072-00
4
4
HHCS, 1/2-13 x 3 3/4” ss 18-8
NUT, 1/2-13 ALUMINUM NYLOCK
25 ft. lbs.
001-76071-00
001-70115-00
001-70117-00
8
4
4
NUT, 3/8-16 ALUMINUM NYLOCK
HHCS, 3/8-16 x 3” ss 18-8
HHCS, 3/8-16 x 3 1/2” ss 18-8
35 ft. lbs.
001-70209-00
001-76350-00
8
8
HHCS, 1/2-13 x 1 1/2” ss 18-8
NUT, 1/2-13 ALUMINUM
45 ft. lbs.
001-70211-00
001-76072-00
002-04140-00
007-06201-00
5
5
1
1
HHCS, 1/2-13 x 2” ss 18-8
NUT, 1/2-13 ALUMINUM NYLOCK
HOLDER, CABLE
SHEAVE, 3” FRONT CABLE ½” ID
45 ft. lbs.
IMPORTANT NOTE:
DO NOT USE IMPACT WRENCH
WHEN ADJUSTING THE EASY
LEVEL LEGS
Warnings
Torque nuts to specification, not bolts.
Place parts and fasteners in designated locations prior to each step.
Before tightening fasteners to specified torque, ensure that the lift is square.
Measure from corner to corner (A to C/B to D) to verify that the lift is square.
Measure distance between corner posts (A to B, B to C, C to D, A to D) above frame beam and at
the top of the corner post to verify that the lift is square.
Ensure that the lift is level and square before proceeding to install the V-Brace.
Assemble cradle clamps with given bolt and nut before installing onto cradle beam.
Use a marker to denote fasteners which have been tightened to the specified torque.
Read instructions and understand them before attempting assembly.
Lift Dimensions
Length: 66”
Width: 134 3/8”
Height: 104”
Work Space
Level work space
Allow space to organize parts
Material
Blocking may be anything 10”-15” in height.
(5-gallon bucket, jack stands, blocks, saw horses)
QTY
4 (2 for each side)
Purpose
Blocking used to support lift during assembly steps
1 and 2
Pre-Assembly Prep
(24) 1/2” Alum. Nylock Nuts
(2) 1/2 x 4” ss Bolts
(8) 1/2 x 3 1/2” ss Bolts
(6) 1/2 x 3” ss Bolts
(8) 1/2 x 1 3/4” ss Bolts
(48) 1/2” ID x 7/8” OD ss Washers
(2) ½” Nuts and (2)
½” Washers are used
in Step 5-A to attach
lifting cables to (2)
ALL FASTENERS IN
STEP 1 ARE HAND-
TIGHTENED ONLY.
IMPORTANT NOTE:
FRAME BEAMS MUST
BE IN THIS
ORIENTATION
BEFORE CONTINUING.