
Assembly Instruction
ToolsRequired: Flatheadscrewdriver,Phillipsscrewdriver, pliers,wirecutters, wire strippers,electricaltape, safety glasses.
BulbRecommended:
EstimatedAssembly Time:
Preparation:
present.Ifany parts aremissingor damaged, donotattempt to assemble,install,or operate thefixture.Contact customer serviceforreplacement
parts.
Identifyandinspect all partsbeforebeginning installation. Checkpackagecontent list anddiagramsbelow to besureall parts are
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
(8)CandelabraBase 60W Maximum
30-45minutes
Package Contents
Side Arm
A
x7
C
Hardware Contents
Crossbar
AA
x1
Lock Washer
BB
x2
Hex Nut
CC
x2
Nipple
DD
x1
Canopy
EE
Chain Loop
x1
STEP 1 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included) Tighten until snug..
Green Ground
STEP 2 Install Canopy Chain Loop and Nipple-
Screw
GG
HH
Outlet Box
AA
Outlet Box Screw
(not included)
Fixture Loop
B
x1
Fixture Body
x1
Finial
D
x1
Canopy Lock
FF
Ring
x1
Fixture Chain
x1
Quick Link
x2
Ceiling
II
Canopy
x1
Figure 1
Nipple (DD). By using
pliers, thread the Hex Nut
(CC) against the Canopy
Chain Loop (EE) and hand
tighten until snug.
B. Thread another Hex Nut
(CC) to the middle of the
Nipple (DD). Place
another Lock Washer (BB)
over the Nipple (DD) and
then thread the Nipple
(DD) into the Crossbar
(AA) until the Nipple (DD)
is about 0.375” above the
Crossbar (AA).
C. Remove the Canopy Lock
Ring (FF) from the Canopy
Chain Loop (EE). Place
the Ceiling Canopy (II)
over the Canopy Chain
Loop (EE) against the
ceiling to determine the correct position of the Nipple (DD). Thread
the Canopy Lock Ring onto the Canopy Chain Loop (EE).Adjust the
Nipple (DD) to allow the Ceiling Canopy (II) to rest against the ceiling
when held in place by the Canopy Lock Ring (FF).
D. Remove the Canopy Lock Ring (FF) and the Ceiling Canopy (II).
Tighten the Hex Nut (CC) against the Crossbar (AA) to secure in
place.
STEP 3 Install Fixture Loop, Side
A. Thread Fixture Loop (B) onto the
B. Attach have one loop end of Side
C. Thread Finial (D) onto the nipple on
-
Arm and Fixture Body together
nipple on the top of Fixture Body
(C), tighten until sung.
Arm (A) onto the hook on the top of
Fixture Body (C), have two loops
end of Side Arm (A) onto the lower
hook on the Fixture Body(C).
the bottom of Fixture Body (C),
hand tighten until sung.
C
AA
DD
A
BB
CC
EE
FF
Figure 2
CC
BB
B
Step B
Step A
II
* Pliers is required for this step.
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end
of the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
1of2
Figure 3
D

STEP 4 - Install Fixture Chain and Ceiling Canopy
STEP 6 - Install Bulb
A. Adjust the Fixture Chain (GG) to your desired length by removing
the links if needed.
*
Pliers is required for this step.
B. With the Fixture Chain (GG) not attached to the Fixture Loop (A) and
the Canopy Chain Loop (EE), pull the supply wires through the
Fixture Chain (GG) alternating links.After the wires are through the
Fixture Chain (GG), pull the Supply Wires and the Ground Wire
through the Canopy Lock Ring (FF) and the Ceiling Canopy (II) in
order.
C. Attach one end of the Fixture Chain (GG) to the Fixture Loop (A) with
one Quick Link (HH). Lift the fixture and Fixture Chain (GG) up And
Attach the other end of the Fixture Chain (GG) onto the Canopy
Chain Loop (EE) with another Quick Link (HH). The fixture will now
hang safely. Close the chain loop at the Ceiling Canopy Loop (EE).
D. Feed the Supply Wires and Ground Wire through the Canopy Chain
Loop (EE) and Nipple (DD) into the Outlet Box. Cut the wires leaving
approximately 8” of wire extending from the Outlet Box.
E. Refer to Step 5 for wire connections.
F. Raise the Ceiling Canopy (II) and Canopy Lock Ring (FF) up the
Fixture Chain (GG) and over the Canopy Chain Loop (EE). Tighten
the Canopy Lock Ring (FF) onto the Canopy Chain Loop (EE) until
tight.
Suggested chain length for Ceiling height :
8’ ceiling : use 9 links of chain and 2 quick links
9’ ceiling : use 19links of chain and 2 quick links
10’ ceiling : use 29 links of chain and 2 quick links
Supply Wires
and Ground Wire
DD
EE
HH
A. This fixture uses candelabra
bulb with standard screw
base. Maximum 60 watts.
B. Insert bulb and screw snugly
into place.
Your fixture is now
assembled and ready to
use. Enjoy!
FINISH: RUSTIC BLACK
1
Figure 6
Bulb
Socket
5” Dia.
0.5”
84.5”OVERALL HEIGHT
INCLUDES 48” CHAIN
AND 2 QUICK LINKS()
31”
GG
II
FF
HH
Figure 4
A
STEP 5 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. (Connectors are not included with fixture.) Twist
connectors until wires are tightly joined together. Wrap each
connection with approved electrical tape and carefully stuff all the
connected wires into the Outlet Box.
Figure 5
White wire
from supply
Black wire from
supply (or Red)
Ground wire
from supply
Ribbed side wire
from fixture
Smooth side wire
from fixture
Ground wire
from fixture
(8) 60W Candelabra
Bulbs
Base
(Not Supplied)
PART NUMBER
NO.
1
32” Dia.
NOTE: TWO LIGHTS SHOWN FOR
ILLUSTRATION PURPOSES ONLY.
NOTE: ALL DIMENSIONS ARE ROUNDED
UP TO THE NEAREST 1/2"
REPLACEMENT PART DESCRIPTION
REQ.
CHAIN 1
2of2