
1. Determine the mounting position for the mudflap bracket. If
there is not an existing clearance hole for a 5/8” bolt available,
one will have to be drilled.
NOTE: Be sure to follow
truck manufacturers recommended procedures
for drilling any required
hole in the frame.
Single Bolt Mount
Installation Instructions
Patent #6,484,984B2
Installation Sheet #INS-02025
NOTE: These instructions for installation are intended to be a
general guide to help the installer. Because of the large number of
possible mounting configurations, the installer is responsible for
the ultimate installation design. Any modifications to the product
are at the discretion, responsibility and risk of the installer.
Each Single Bolt Mounting
Package Set Includes:
•2 mount sockets
•2 5/8” bolts
•2 lock washers
front view
Installation Sheet #INS-02025
7/02 • Rev. B-10/06
back view
2. IMPORTANT! Make sure the
frame is clean and free from
obstructions and excessive
thickness of paint.
Loosely attach the mount to the
frame with the 5/8” bolt.
3. Insert the mud flap
bra c k e t int o the
opening on the top
of the mount. Make
sure the mud flap
hangs vertical to the
road.
4. Tighten the bolt to
245 ft. lbs. of torque
while keeping the
mud flap in the vertical position.
mud flap and mud flap bracket
not included