CONTENTS
Section 1 Information and Requirements PAGE
1.0 Appliance Information 3
1.1 Conditions of Installation 4
1.2 Flue and chimney suitability 4
1.3 Fireplace opening 5
1.4 Shelf position 5
1.5 Flue / chimney inspection 5
1.6 Chimney opening & catchment space 6
1.7 Installation with or without a flue liner 7
1.8 Spillage Monitoring System 7
Section 2 Installation of Fire
2.1 Unpacking the fire 8
2.2 Installing the combustion chamber 9
2.3 Preparation of the combustion chamber opening (chimney) 10
2.4 Preparation of the combustion chamber opening (stud wall) 11
2.5 Connection of flue liner to combustion chamber 12
2.6 Connection of spigot outlet hood / debris deflector 13
2.7 Installation of the gas supply 14
2.8 Gas tightness and inlet pressure 15
2.9 Fitting the “Pure” fascia 15
2.10 Fitting the fuel-bed gravel 16
Section 3 Commissioning
3.1 Lighting the appliance 17-18
3.2 Checking for clearance of combustion 19
products
Section 4 Maintenance
4.1 Removal of the Burner Assembly 20
4.2 Removal of the Valve 20-21
4.3 Removal of the Oxy-Pilot Assy. 21
4.4 Removal of the RF Receiver / Battery Pack 21
Parts Shortlist 22
This appliance is manufactured by :-
BFM Europe Ltd, Trentham Lakes,
Stoke-on-Trent, ST4 4TJ
2