Flam SC 1.2 GZ, SC 5.1 GZ, SC 5.2 GZ, SC 8.1 GZ, SC 8.2 GZ Operating Manual

...
Two Stage
Gas Burner
Model:
SC 1.2 GZ SC 2.1 GZ SC 2.2 GZ SC 3.1 GZ SC 3.2 GZ
Burner Maintenance and Usage Instructions
SC 5.1 GZ SC 5.2 GZ SC 8.1 GZ SC 8.2 GZ SC 8.3 GZ
Body Type:
Gama
Language:
English
INDEX
BURNER SPECIFICATIONS ..........................................................................3
CERTIFICATES ............................................................................................... 4
BODY T YPES .................................................................................................5
PRODUCT ENCODE .......................................................................................6
DECLARATION OF CONFORMITY ...............................................................7
WARNING NOTES .......................................................................................... 8
ELECTRICAL WARNING SIGNS .................................................................11
PRESSURE DROPS .....................................................................................12
FLAME LENGHT AND DIAMETERS (GAS) ................................................ 14
CAPACITY CURVES ..................................................................................... 15
BURNER DATA TABLE ................................................................................17
BURNER DIMENSION TABLE ..................................................................... 18
MOUNTING ................................................................................................... 19
OPERATIONAL EXPLANATION .................................................................. 20
EXPLODED PICTURE ..................................................................................21
NUMBERED EXPLODED PICTURE ............................................................22
IGNITION ELECTRODE TURBULATOR AND ITS POSITION ....................23
GAS AND AIR PRESSURE SWICH .............................................................24
GAS VALVE CONNECTION .........................................................................25
MAINTENANCE ............................................................................................26
COMMISSIONING PROCEDURE .................................................................27
PACKING ......................................................................................................28
EQUIPMENTS ...............................................................................................29
GZ GAMA Gas Two Stage
2
2
BURNER SPECIFICATIONS
EASY SETUP
Flam
Flamtec burners are easy to set up with the prototype structure.
It can be used with dierent options in ovens,
dryers, generators, water and steam boilers.
Horizontal and upwards can be set up.
FUELS
It can be used with artificial fuels
like gas (G), motor (L), fuel oil (H) and other biogas, LPG.
DESIGN
Flam
Flamtec burners have a modern design, maintenance
and easy serviceability for technical service is provided.
WORKING PRINCIPLES
Our burners have single and double stage and modulation options.
Modulation has pneumatic and mechanical and electronics options.
Modulation with the PID controller can be implemented.
Our modulation ratio can be up to 1/5 of a 1/10.
BURNER OPERATION OPTIONS
In our fully modulated burners, we add PID control.
You can also choose O2 trim, inverter, and low NOx options.
ENVIRONMENT-FRIENDLY TECHNOLOGY
Flam
Flamtec burner has reduced Nox values to European standards with its
advanced technological structure and continues to work on this subject.
WORLDWIDE TECHNICAL SERVICE
Our service team can serve you in every corner of the world.
Dynamic and experienced gives you the promise of the best service.
CUSTOMIZE SOLUTION
Our team can oer you customize solution for your systems.
Special design and calculation is our pleasure.
GZ GAMA Gas Two Stage
3
3
CERTIFICATES
Gas Burner CE Design Module Producon Module CE, ISO 9001: 2008 Quality Management Cercate and connue
with the sales market.
CE Design Module, CE Producon Module, ISO 9001: 2008
Quality Management Cercates and CE Cercates can
be accepted for the Motor-Gas Double Fuel Burners.
4
4
GZ GAMA Gas Two Stage
BODY TYPES
We use up to 17,800 kW of our Alfa type body for gas,oil and gas /oil fuels.
We use Beta body up to 7.800 kW in heavy oil and gas / heavy oil fuels.
We use up to 11,000 kW of our Gama burners in our gas-fired burners.
We use our Delta body in our Duoblock models from 500 kW to 7,800 kW in gas, oil, heavy oil and dual fuel.
We use our Epsilon body in our Doublock models from 10,500 kW to 35,000 kW in gas, oil, heavy oil and dual fuels.
We use our Pi model from 180 kW to 500 kW in our custom ram burners.
Our control panels vary according to body size and are simple to use.
Our service network covers all of Spain. We can send technical support to every part of the world.
GZ GAMA Gas Two Stage
5
5
PRODUCT ENCODE
SC. 12-2-G-M-(P)-Beta
Body Size
Body Capacity
Fuel Type
BODY SIZE: 0-1-2-3-5-8-10-12-14-16-18-20-22 BODY CAPACITY: 1-2-3
FUEL TYPE:
G-GAS L-LIGHT OIL H-HEAVY OIL GL-GAS/LIGHT OIL GH-GAS/HEAVY OIL
Body Type
Work Options
Operation Mode
6
6
OPERATION MODE:
S-SINGLE STAGE Z-TWO STAGE M-MODULATING
WORKING OPTIONS:
(P)-PNEUMATIC MODULATION (M)- MECHANIC MODULATION (E)-ELECTRONIC MODULATION (I)-INVERTER (Variable-Frequency Controller) (LN)- LOW NOx (O2) OXYGEN TRIM
BODY TYPE: STATED IN THE PREVIOUS PAGE.
GZ GAMA Gas Two Stage
DECLARATION OF CONFORMITY
Before using the burner for the first time, please ensure that the product is an integral part of this manual, which is supplied with the burner. Read USER’S WARNING FOR USING BURNER” section carefully. Burner and system operations must only perform by authorized personnel.
- Be sure to read the operating manual carefully before starting to operate or repair the burner.
- e power supply of the system must be disconnected before the repair on the burner We hereby declare that the suitability of our “CE” marking SC series products is under our sole responsibility. starts.
- It is possible to cause dangerous accidents if the instructions are not followed strictly and the work is not carried out properly.
Descripon
Gas or dual-fuel blow-domestic and industrial burners on the minimum regulations that apply European Directives:
• 90/396/EEC
• 92/42/EEC
• 89/336/EEC
• 73/23/EEC
98/37 EEC and the European Standards subject to the design and testing:
EN 676 (gas ve çi yakıtlı, gas tarafı)
EN 60335-1, 2003
EN 50165: 1997 + A1:2001 + A2:2002
EN 55014 -1 (1994) and –2 (1997) e control according to Directive 90/396 / EEC Gas Devices; CE2159 - Made by S & Q MART.
GZ GAMA Gas Two Stage
7
7
WARNING NOTES
USE THE BURNER SAFELY USER WARNING NOTES
1. General Information
is product must only be used in accordance with its intended use by applying the specified installation and commissioning protocols. Other than intended use, death, injury and serious burning may occur. Before using the burner for the first time, please read carefully the “USER WARNING NOTES FOR USE OF BURNER SAFETY” section of this manual, supplied with the burner as an integral part of the product. Operation of the burner and the system must only be carried out by authorized personnel. e power supply of the system must be disconnected before repair on the burner starts. It is possible to make dangerous accidents that the instructions are not followed carefully and the workings are not carried out properly. e lifetime of the burner is 10 years
2. Preface
ese warning notes have been prepared with the aim of ensuring the healthy use of the components of the heating systems for civilian use and hot water production. ese notes illustrate how equipment with adequate reliability can be acted on with the purpose of avoiding damage caused by incorrect or faulty installations or improper and unreasonable use. In addition, the warning notes in this manual are technically prepared on a level that makes users understand and is aimed at having users knowledgeable about safety issues. e manufacturer is not liable for damages caused by errors in the installation or use of the product not in compliance with the manufacturer’s instructions
3.General Warning Notes
e user manual is a special and necessary part of the product and must be supplied to the user. Read the warnings in the manual carefully as it contains
important information on safe use, maintenance, and installation. Keep the guide where you can find it when you need it. Materials must be installed by qualified technicians according to current standards and manufacturer’s instructions. By “qualified technicians” it is meant those who are experts on domestic heating and hot water production system components, and especially those authorized by the manufacturer. Incorrect installation can harm people, animals, and equipment. e manufacturer is not responsible for such damages. When the package is opened, check that all parts are present and undamaged. If in doubt, do not use materials and return your dealer. e packaging materials (wooden cage chests, plastic bags, foam, etc ...) Keep out of the reach of children. ese materials must be collected and disposed of appropriately so as not to create environmental pollution. Before any maintenance or cleaning, turn o the power of your device using the system switch at the mains supply or switch o all the appliances. If the system is faulty or if your device is not working properly, turn o your device, do not attempt to repair it or do not interfere with it. In such cases, contact the authorized service center only. Any material repairs must be made by Flamtec Authorized Services using original spare parts. Failure to act as above may jeopardize the safety of the equipment. Periodic maintenance must be carried out by authorized services in accordance with the operating instructions to ensure that the equipment operates correctly and eiciently. If the hardware is sold or shipped to another user, or if the owner of the device leaves or surrenders; ensure that the operating instructions are always on the side of the unit. is way the new owner and/or installer can benefit from the guide. Only original materials should be used for all equipment of the device, including optional materials or kits (including electrical equipment).
8
8
GZ GAMA Gas Two Stage
WARNING NOTES
4.Burners
is device should only be used in boilers for applications that are connected to hot water boilers, ovens or other similar equipment and are not exposed to atmospheric agents (rain, dust, etc.). Other forms of use are inadequate and, therefore, It is dangerous. e burner should be installed in the appropriate locations according to the regulations in force and in all cases where adequate ventilation is available to ensure proper combustion. Do not reduce or cover the ventilation opening of the burner or the boiler room where the boiler is installed and the burner air intake grill opening, as hazardous oxide mixtures and explosive gas forms may form. Before connecting the burner, check the information on the system feed (electrical, gas, motor, or other fuel) related information on the label on the front. Do not touch the hot parts of the burner. Usually in the areas near to the ame and the fuel preheating system components are hot during operation of the device and remain hot for some time. If the burner is no longer used, the following operations must be carried out by authorized technicians; a)Disconnecting the power supply line from the main switch, disconnecting the power supply, b)Closing the fuel supply using the shuto valve and removing the valve release lever, c)Picking up parts of potentially hazardous parts,
5. Special Alerts
Check that the connection of the burner to the heat generator is secure, as it will occur in the ame combustion chamber. e following procedures are required to be tested by authorized technicians at least once a year and once before commissioning the burner; a) Adjustment of burner fuel level, adjustment of the capacity of the heat generator. b) Adjustment of the combustion air ow at least to ensure combustion eiciency of the burner at the minimum air ow rate declared by the current
regulations. c) Check that NOx and unburned gases causing air pollution do not exceed the permissible limit values according to the current legislation. d) To check that the safety devices and control devices are working properly. e) Checking the condition of the duct where the combustion products are discharged. f) Aer the setting operations have been carried out, the mechanical safety locks of the adjusting devices must be made, g) To check that the burner operating and maintenance manual is in the boiler room. If the burner is continuously failing, do not try to reset it more than twice. Call your nearest authorized service agent to resolve the problem. According to the regulations in force, the operation and maintenance of the equipment should only be carried out by authorized services.
6. Electrical Connection
e equipment is only electrically safe if properly connected to the appropriate earthing line according to current electrical safety legislation. It is necessary to check that the necessary safety requirements have been fulfilled. If you are in doubt, have a certified electrician check the system. Because the manufacturer is not responsible for damage caused by poor grounding connection. e suitability of the electrical circuits for maximum loads of the equipment must be checked by authorized services. Have the certified electrician check that proper wiring is done according to the maximum power drawn by the burner as shown on the technical labels, especially if the cable diameters are suicient for the power drawn. According to the current safety legislation, it is necessary to use a polarity switch to connect the main power supply. e burner power supply must have neutral grounding. If the ionization current is controlled from an ungrounded neutral, a connection must be made between the terminal 2 (neutral) and ground
GZ GAMA Gas Two Stage
9
9
WARNING NOTES
for the RC circuit. Use of any electric parts; It is subject to compliance with the basic principles of electric safety rules reported below;
-Do not touch equipment with wet or damp parts of your body.
-Don’t take the electric cables.
-Do not leave your device in atmospheric (rain, sun, etc.) environments unless proper storage characteristics have been specified.
-Do not allow unauthorized persons and children to use.
-e mains power cables cannot be changed by the user. If the cables are damaged, disconnect the equipment from the mains and call only authorized service personnel to replace the cables.
-If you decide not to use your device for a while, it is recommended that you disconnect all electrical equipment (pump, burner, etc.) from the electrical connection.
--Do not leave your device in operation when you are not using it and always keep the gas valve closed.
- When the user goes away for a while, turn o the main valve that brings the burner gas. If you get the gas smell:
- never use a power switch, telephone or any other device that may spark;
- open the doors and windows to provide airow to clear the air of the room;
- close the gas valves;
- ask for technical assistance.
- Do not close the ventilation openings of the spaces where gas-fired devices are located, otherwise dangerous situations may occur due to the formation of the toxic and explosive mixture.
7. General Warning Notes on Gas, Motor or Other Use
e burner installation must be carried out by authorized technicians in accordance with the existing laws. Incorrect installation may harm human beings, animals, and other persons, in which case the manufacturer is not responsible for this damage. Before installing the burner, it is recommended to clean the dirt inside the fuel supply line piping, which may prevent the system from operating properly. For the first commissioning of the burner, have the following checks carried out by authorized services: If you have decided not to use the burner for a while, close the valves or valves on the fuel line. Special warning notes when using gas: Authorized technical service:
- check the compliance of the pipeline and gas lines with the applicable laws and regulations,
- check that the gas lines are leakproof.
-Don’t use gas pipes for grounding electrical appliances.
10
10
GZ GAMA Gas Two Stage
ELECTRICAL WARNING SIGNS
CAUTION VOLTAGE
(OXYGEN ADJUSTMENT)
ENERGY CLOSE WITHOUT
OPENING THE SHUTTER
ENGINE ROTATIONDAMPER ADJUSTMENT
GZ GAMA Gas Two Stage
11
11
7,5
0
2,5
5
90
10
210
180
150
120
60
30
0
12,5
15
mbar 17,5
kW
SC 1.2
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
7,5
0
2,5
5
120
10
280
240
200
160
80
40
0
12,5
15
mbar 17,5
kW
SC 2.1
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
7,5
0
2,5
5
180
10
420
360
300
240
120
60
0
12,5
15
mbar 17,5
kW
SC 2.2
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
7,5
0
2,5
5
225
10
525
450
375
300
150
75
0
12,5
15
mbar 17,5
kW
SC 3.1
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
PRESSURE DROPS
7,5
0
2,5
5
285
10
665
570
475
380
190
95
0
12,5
15
mbar 17,5
kW
SC 3.2
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
mbar 17,5
15
12,5
10
7,5
5
2,5
0
0
280
140
mbar 17,5
15
12,5
10
7,5
5
2,5
0
0
mbar 17,5
15
SC 5.2
420
560
840
700
980
12,5
10
7,5
5
2,5
0
kW
0
220
110
340
170
330
510
680
440
SC 5.1
SC 8.1
550
850
660
1020
770
1190
kW
kW
Gas Pressure Drop in barrel and gas train
12
12
Gas Pressure Drop in barrel
GZ GAMA Gas Two Stage
PRESSURE DROPS
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
Gas Pressure Drop in barrel and gas train Gas Pressure Drop in barrel
mbar 21
18
15
12
mbar 21
18
SC 8.2
9
6
3
0
0
460
230
690
920
1150
1380
1610
15
12
9
6
3
0
kW
0
600
300
900
1200
SC 8.3
1500
1800
2100
kW
GZ GAMA Gas Two Stage
Gas Pressure Drop in barrel and gas train
Gas Pressure Drop in barrel
13
13
FLAME LENGHT AND DIAMETERS (GAS)
14
14
GZ GAMA Gas Two Stage
CAPACITY CURVES
50
100 150
200
250
300
0
0,5
1
1,5
2
2,5
3
3,5
4
4,5
5
5,5
6
6,5
350 400
SC 1.2
SC 2.1
SC 2.2
mbar
kW
mbar
18
16
14
12
10
8
6
4
2
SC 3.1 SC 3.2
0
250
500
SC 5.1
750
SC 5.2
1000
kW
1250
GZ GAMA Gas Two Stage
15
15
CAPACITY CURVES
mbar
22
20
18
16
14
12
10
8
6
4
2
SC 8.1
SC 8.2
SC 8.3
kW
0
250
500
750
1000
1250
1500 1750
2000
2250
2500 2750
16
16
GZ GAMA Gas Two Stage
BURNER DATA TABLE
Capacity
Type
SC 1.2 GZ 50 180 43.000 154.000 5 19 SC 2.1 GZ 80 280 68.800 240.000 8 29 SC 2.2 GZ 100 360 86.000 309.600 10 37 SC 3.1 GZ 110 500 94.600 430.000 12 52 SC 3.2 GZ 130 650 111.800 559,000 14 67 SC 5.1 GZ 200 750 172.000 645.000 20 78 SC 5.2 GZ 260 950 223.600 817.000 27 99 SC 8.1 GZ 330 1150 283.800 989.000 34 119 SC 8.2 GZ 430 1600 369.800 1.376.000 44 166 SC 8.3 GZ 580 2100 498.000 1.806.000 60 218
kW
min-max
kcal/h
min-max
m3/h
min-max
GZ GAMA Gas Two Stage
Power
Supply
1N - 50 Hz 230V
1N - 50 Hz 230V
1N - 50 Hz 230V
1N - 50 Hz 230V
1N - 50 Hz 230V
3N - 50 Hz 380V
3N - 50 Hz 380V
3N - 50 Hz 380V
3N - 50 Hz 380V
3N - 50 Hz 380V
Motor
0,15 21-300 0,25 21-300 0,25 21-300 0,37 21-300 0,37 21-300 0,75 21-300
GAS INPUT
kW
1,5 21-300 1,5 21-300 2,2 21-300
PRESSURE
mbar
3 21-300
17
17
B1
L2
L1
L
E
F
C
C3
C1
C2
BURNER DIMENSION TABLE
L
L2
L1
B2
A1
F
E
A2
SC 1.2 GZ
SC 2.1 GZ
SC 2.2 GZ
SC 3.1 GZ
SC 3.2 GZ
SC 5.1 GZ
SC 5.2 GZ
SC 8.1 GZ
SC 8.2 GZ
SC 8.3 GZ
A1 A2 B1 B2 ØC C1 C2 ØC3 ØE ØF L1 L2 L
220 235 235 170 90 110 104 M6 95 90 78 120 620
220 235 235 170 90 110 104 M6 120 114 78 120 620
220 250 235 170 114 130 125 M8 120 114 110 190 660
250 320 290 185 114 130 125 M8 155 140 110 190 735
340 320 320 250 140 155 142 M12 155 140 170 390 1070
380 390 300 280 170 200 170 M12 175 168 180 380 1160
380 390 300 310 170 200 170 M12 195 168 180 380 1180
420 390 310 310 170 200 170 M12 195 168 180 380 1230
420 390 310 330 220 240 190 M14 240 220 270 480 1250
420 390 310 330 220 240 190 M14 240 220 270 480 1250
18
18
GZ GAMA Gas Two Stage
MOUNTING
GZ GAMA Gas Two Stage
19
19
OPERATIONAL EXPLANATION
Phases
PAUSE: Burner air shutter is open is fixed in position by hand. There is no gas in gas train. PRE-SWEEPING: The burner fan motor starts to operate following the command from the boiler oven thermostat or pressure switch. There is no gas passage in this phase. Only the fan is running. FORMING FLAME: Fan works. Gas regulator is adjusted to the gas inlet pressure.Ignition transformer works and gas valve opens.
Operation Instructions
1. Check the boiler gas pressure in manometre according to the burner label (300 mbar to 21 mbar),
2. Adjust the pressure switch located on the valve to the positions described in the operating instructions.
3. Adjust the valve and thermostats by checking the process
4. Turn on the o-on switch.
5. When thermostat and pressure switch allow, the burner fan motor starts to pre­sweep by entering the engine.
6. If the air pressure switch in the sweeping position permits the process, then after the burner has finished sweeping, ignition position starts.
8. The ignition starts on the burner by energizing the gas valve 3 seconds after ignition. (set the gas valve settings as shown in the user manual).
9. The ame control system (ionization or UV photocell) will start ame control.
10. when bolier’s thermostat and pressure switch allows, second stage of the fire takes place.
11. If the values are exceeded, the device is switched o to the stand-by position and the device automatically switches to the heat production by repeating the process again.
20
20
GZ GAMA Gas Two Stage
EXPLODED PICTURE
GZ GAMA Gas Two Stage
21
21
NUMBERED EXPLODED PICTURE
22
22
GZ GAMA Gas Two Stage
IGNITION ELECTRODE TURBULATOR
45,00°
AND ITS POSITION
e position of the ignition electrode and the turbulators is important to ensure proper combustion. e distance of the ignition electrode to the pilot gas bubble and the distance between the turbulator and the bushes must be specified.
45,00°
2-3 mm
e specified distance is valid for single electrode models. For models with dual ignition electrodes, the distance between the two electrodes should be 3 mm. e distance between each of the electrodes should not be less than 4 mm.
GZ GAMA Gas Two Stage
23
23
GAS AND AIR PRESSURE SWICH
1.Minimum Gas Pressure Switch
Dungs GW150 A5 is used in our burner as standard minimum pressure switch.It closes the burner when the gas comes under a certain pressure. For every installation, it must be set by commisioner.
Operation
Please make the adjusment of the air pressure switch aer done with all the electrical and insfructural settings. Remove the cover with a screw. When burner works, turn to le the scale untill burner stops. When burner stops, turn to right 0,2 point as a set up point. Close the cover again!
2.Maximum Gas Pressure Switch,
operating in the first stage, increase the adjustment pressure by turning the respective knob clockwise until the burner stops. en turn the knob from the set point to about 20% counter-clockwise and run the burner again to check the accuracy. If the burner stalls again, turn the knob a little further, as opposed to clockwise.Caution: As a rule, the air pressure limits the CO in the ue gas to be less than 1% (10,000 ppm). To check this, connect a gas analyzer to the ue gas, slowly turn o the fan suction (eg with a carton piece) and see that the burner stopped before CO 1% in the ue gas. If the air pressure switch is connected to two pipes, it can also work as a dierential. If the negative pressure in the combustion chamber during pre­sweeping prevents the air pressure switch from entering the circuit, it can be done by putting a second conduit between the switching air pres­sure and the suction of the fan. In this way, the air pressure switch works like a dierential switch. Caution: Dierential operation of the air pressure switch is only allowed in industrial applications and where the air pressure switch of the rules permits only the fan to operate without any CO limit. will close
Dungs GW 500 A2 is used in our berner as maximum pressure switch. It ensures that the burner
Operation
Aer the adjusment of the minimum gas pressure, start bunerer again. When te burner works, open the cover of maximum gas pressure switch with a screw. Turn to le the scale untill the buırner stops. When it stops, turn to the right 0,2 points as a set up point. Close the cover.
3.Air Pressure Switch
Dungs LGW3 A2 is used in our burners as our standards. It closes the burner when the air is not enough.
Operation
Adjust the air pressure switch aer you have made all other burner settings.When the burner is
24
24
GZ GAMA Gas Two Stage
GAS VALVE CONNECTION
MULTI-BURNER, PRESSURE GAS PIPELINE CONNECTION DIAGRAM IN THE IN INTERMEDIATE LEVEL
1) Measuring and dropping unit
2) Cutting valve
3) Filter
4) Reducing
5) Counter
6) Emergency shut-o valve (installed outside the building)
7) Ball valve
8) Filter
9) Final reducer or stabilizer
10) Vibration receiver
11) Double ange D = distance between pressure stabilizer and ange (approx. 1.5 - 2 m)
A BURNER’S MEDIUM LEVEL PRESSURIZED GAS PIPE HALT TO CONNECTION DIAGRAM
1) Measuring and dropping unit
2) Cutting valve
3) Filter
4) Reducing
5) Counter
6) Cage wire ame holder
7) Automatic opening overpressure relief valve (open outdoors at an appropriate place it must discharge)
8) Emergency shut-o valve (outside the building)
9) Ball valve
10) Vibration receiver
11) A ange pair
GZ GAMA Gas Two Stage
25
25
MAINTENANCE
• e electrical connection should be cut o first and the gas completely closed.
• e burner does not require special maintenance. However, it is a good practice to periodically check that the gas filter is clean and the ignition electrode is intact.
• In addition, it is also necessary to check the occurrence of electrode sparking between the ignition electrode and the disk.
•e combustion head may need to be cleaned.
• Center the electrodes (ignition and ionization) precisely so that they do not touch the ground when they are put back into position and do not trip the burner.
• Most of the braking equipment can be controlled by opening the hinge.
• It is necessary to remove the mixing unit to check the head.
• e fan and turbulator should be cleaned.
• O2, CO, and CO2 values should be checked once a month.
• If boiler connection gaskets are damaged, they must be replaced.
• Regular maintenance of the boiler should be done.
• Smoke pipes should be cleaned once a month.
• Chimney cleaning should be done during the season passes.
• Run the boiler for summer periods, several times a month for 5 minutes, to prevent the pumps from being crushed.
• Check the air ow in the boiler room.
• Prevent the boiler chamber from getting wet. Never contact the burner with water it must not.
• Do not add water to the boiler when the boiler is hot.
26
26
GZ GAMA Gas Two Stage
COMMISSIONING PROCEDURE
e burners purchased from our company are important for the first time that the technical manager of the company who engages in the commissioning, purchasing or mechanical and electrical installation work is present during the commissioning of the burner. e controls and works on the table below must be completed so that your burner, who has been purchased, can be activated without any problems at a time. e first start-up of our burners is done free of charge by our company or authorized service providers in Turkey. Our company and its authorized service are not responsible for the fact that the burner can not be commissioned for the first time due to the items mentioned in the procedure or due to problems caused by the statements. e second round of commissioning visit to the facility and the first start-up activity will be carried out for the cost.e following instructions must be completed by you or your customers. When our authorized service technician arrives for the second time to your installation, you will be charged 50 Euros + VAT for each burner, 30 Euros / 100 km for the return journey and 30 Euros / 100 km for the return journey.Commisioning details to be completed before burner commissioning.
1 - Mechanical installation of the burner head must be done correctly. 2 - e burner must have provided the necessary nosepiece to the boiler of the combustion head. (Min 7 - 10 cm.) (If the burner does not fit properly in the boiler shell, it may start inside the burner door and damage the boiler cover.) 3 - ere must be thermostats on the boiler to provide boiler water temperature and one safety and one operation control to ensure safety of the burner. 4 - e electrical and mechanical connections of the safety and operating equipment on the device to be operated by the burner must be made to the system. 5 - e air of the installation should be taken by filling the system with water. 6 - e closed expansion tank pressure connected to the system should be adjusted according to the operating pressure of the system. 7 - e circulation pumps must be in operation. 8 - Electrical installation must be completed (Temperature sensor-ermostat-to-burner main supply cables) 9 - Fuel supply has been provided and the necessary connections to the burner have been made correctly. 10 - If there is a gas in the burner, there should be a manometer. 11 - Required legal permissions have been obtained (Gas opening certificate etc.) 12 - If the burner is proportional controlled, the temperature sensor or pressure transmitter shall be provided and mechanical and electrical connections shall be made to the burner to provide proportional operation of the burner. 13-No water leakage is required in the installation.
We will be sent to our customers as a ‘’ Request Form ‘’ together with our burners. By filling out the form and sending it to us by fax or e-mail it will be delayed and problems will be prevented. It is important to inform your customers in this regard.
GZ GAMA Gas Two Stage
27
27
PACKING
B
B
C
C
A
A
Lenght(a) cm Width(b) cm Height(c) cm
SC 1.2 GZ
SC 2.1 GZ
SC 2.2 GZ
SC 3.1 GZ
SC 3.2 GZ
SC 5.1 GZ
SC 5.2 GZ
SC 8.1 GZ
630 465 425
670 480 425
745 580 495
1080 670 590
1080 670 590
1170 780 600
1190 780 630
1240 820 630
28
28
SC 8.2 GZ
SC 8.3 GZ
1260 820 660
1260 820 660
GZ GAMA Gas Two Stage
EQUIPMENTS
Inlet Pressureı 0,5 - 6 Bar
3
1
211
Operating gas pinlet pressure
150 - 300 mbar
11
1
23
7
5
Bar
P1
6
4
5
4
7
6
8
5
8A
mbar
Po
9
5
10
8A
8
9
10
Burner
1-Ball Valve 2-Compensator 3-Testing nipple 4-Gas filter 5-Monometer (with tap) 6-Gas Pressure regulator
GZ GAMA Gas Two Stage
7-Relief Valve 8-MIN. Gas pressure switch 8A-MAX. Gas pressure switch 9-Multiblock valve 10-Burner 11-Firing valve
29
29
Selkoc Isıtma ve Soğutma Otomasyon
San. Tic. Ltd.
Şti. İsmetpaşa Mah. Hisar Sok. Üstün İş
Merkezi.
No: 20/53 Tel: +90 212 501 48 54
Fax: +90 212 501 48 57
info@selkoc.com.tr www.selkoc.com.tr
Loading...