FläktGroup CPD Series, CPDG, CPDH, CPDJ, CPDK Operation, Maintenance, Installation, Commissioning, Spare Parts

...
Page 1
COOKER HOOD CPD
OPERATION, MAINTENANCE, INSTALLATION, COMMISSIONING, SPARE PARTS
Page 2
2
CONTENT
MAINTENANCE (FOR THE USER)
Cleaning .......................................................................................................... 3
Replacing of the low energy lamp ....................................................... 3
General ............................................................................................................ 3
Operating of CPDA, CPDJ and CPDR .....................................................4
Operating of CPDB, CPDC, CPDG, CPDH, CPDK .............................. 5
INSTALLATION (FOR INSTALLERS AND SERVICE PERSONNEL)
Installation height ...................................................................................... 6
Main supply .................................................................................................. 6
General ............................................................................................................ 6
CPDA .................................................................................................................7
CPDB ................................................................................................................. 8
CPDC ............................................................................................................... 8
CPDG ............................................................................................................... 9
CPDH ............................................................................................................. 10
CPDJ ............................................................................................................... 10
CPDK .............................................................................................................. 11
CPDR .............................................................................................................. 11
Cooker hood CPD - Installation and Maintenance Manual
ELECTRICAL CONNECTIONS (FOR INSTALLERS AND SERVICE PERSONNEL)
CPDG and CPDR ..................................................................................................12
ADJUSTMENT, COMMISSIONING (FOR INSTALLERS AND SERVICE PERSONNEL)
CPD(A, B, C, G, R)- Basic ventilation .................................................13
CPD(A, B, C, G, R) - Forced ventilation .............................................14
CPD(H, K) - Basic ventilation ................................................................15
CPD(H, J, K, R) - Forced ventilation ................................................... 16
GENERAL
Spare parts CPD(A, B, C, G, H, J, K, R) ........................................................17
Declaration of conformity ................................................................................18
Disposal of product and packaging materials ...................................... 19
Cooker hoods CPDD and CPDL, see separate instruction (8759).
WARNING! THE DEVICE CAN BE USED BY CHILDREN FROM 8 YEARS UPWARDS AND PEOPLE (INCLUDING
KNOWLEDGE UNLESS THEY HAVE RECEIVED GUIDANCE OR INFORMATION ON HOW TO USE THE DEVICE SAFELY
AND UNDERSTAND THE RISKS THAT CAN OCCUR. CHILDREN SHOULD NOT PLAY WITH THE APPLIANCE. CLEANING
FläktGroup DC_8757GB_20190130_R2
AND MAINTENANCE IS NOT CARRIED OUT BY CHILDREN WITHOUT SUPERVISION.
Specifications are subject to alteration without notice
Page 3
Cooker hood CPD -Installation and Maintenance Manual
alt.
MAINTENANCE
CLEANING OF COOKER HOOD
Do not use abrasive sponge or cloth.
CLEANING OF GREASE FILTER
3
1
REPLACING OF THE LOW ENERGY LAMP
8 W/E14
Note! Do not use the cooker hood
without grease filter fitted.
2
Check the grease filter every week.
33
GENERAL
There is a fire risk if cleaning is not carried out in accordance with the instructions.
Accessible parts may become hot when used with cooking appliances.
Do not flambé under the cooker hood.
If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid hazard.
Clean if needed.
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 4
4
MAINTENANCE
OPERATING OF CPDA, CDPJ AND CPDR
Cooker hood CPD - Installation and Maintenance Manual
Handle for boosting Lighting
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 5
Cooker hood CPD -Installation and Maintenance Manual
MIN
1
2
MAINTENANCE
OPERATING OF CPDB, CPDC, CPDG, CPDH AND CPDK
5
Handle for boosting Lighting Handle for fan speed
NORMAL
1
MIN
MAX
1
MIN
MIN
1
2
2
2
FläktGroup DC_8757GB_20190130_R2
MIN
Specifications are subject to alteration without notice
Page 6
6
INSTALLATION (FOR INSTALLERS AND SERVICE PERSONNEL)
INSTALLATION HEIGHT MAIN SUPPLY
min 400 mm
Cooker hood CPD - Installation and Maintenance Manual
The distance between the stove and the lower edge of the cooker hood has to be at least 400 mm, recommended distance 500 mm.
When the cooker hood is located above a gas appliance, this distance shall be at least 650 mm. If the instructions for installation of the gas hob specify a greater distance, this has to be taken into account.
All cooker hoods has to be connected directly or indirectly via the heat recovery unit/exhaust fan to earth.
If the supply cord is damaged, it must be replaced by the manufac turer, its service agent or similarly qualified persons in order to avoid hazard.
-
GENERAL
The air must not be discharged into a flue that is used for exhausting fumes from appliances burn ing gas or other fuels.
Regulations concerning the discharge of air have to be fulfilled.
-
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 7
Cooker hood CPD -Installation and Maintenance Manual
min 500 mm
2
3
1
max
300 mm
1
2
3
5
4
max
300 mm
12mm
Ø 50
160
100
a
min 500 mm
a =700 a =600 a =500
200
100 100
415 365 365
255 205 205
INSTALLATION (FOR INSTALLERS AND SERVICE PERSONNEL)
CPDA
Intended for multiple-unit dwellings with a central extract air fan or a heat recovery unit. Suitable for both new production and replacement of older cooker hoods.
INSTALLATION BETWEEN KITCHEN CABINETS
7
a
b
INSTALLATION BENEATH KITCHEN CABINETS
a
b
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 8
8
Cooker hood CPD - Installation and Maintenance Manual
INSTALLATION (FOR INSTALLERS AND SERVICE PERSONNEL)
CPDB
Replacement hood for older exhaust air fan JBDD-aa with capacitor box, manufactured before 2007.
a
JBDD-aa
(earlier version)
b
CPCB
Remove the old cooker hood.
CPDC
Replacement hood for older heat recovery unit RDKG without bypass (fits RDKG-a-1-c-d-1).
JBDD-aa
(earlier version)
a
Remove the old cooker hood.
b
2
3
3.1 3.2
5
4
1
6
It is important to seal the grommet by putting
back the small piece of sealing material.
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 9
Cooker hood CPD -Installation and Maintenance Manual
INSTALLATION (FOR INSTALLERS AND SERVICE PERSONNEL)
CPDG
With transformer, fits for example the new JBDH. (Fits JBDD-aa-1-2, JBFG and also as replacement cooker hood for controlling older exhaust air fans and units, for example JBDB, JBDC and RDAA.)
9
INSTALLATION BENEATH KITCHEN CABINETS
33
160
176
min 500 mm
INSTALLATION BETWEEN KITCHEN CABINETS
3
115
2
96
Ø50
1
min 500 mm
CONNECTION TO EXHAUST FAN JBDD, GENERATION 2
JBDD generation 2
JBDH
3
2
1
CONNECTION TO OTHER FANS
For electrical installation, see wiring examples on page 12.
3
1 = Orange - Supply voltage
to fan 2 = Blue - Neutral 3 = Black - Phase 4 = Yellow/Green - Ground
2
1
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 10
10
INSTALLATION (FOR INSTALLERS AND SERVICE PERSONNEL)
CPDH
Replacement hood for older heat recovery units RDKG with bypass. (Fits RDKG-a-2-c-d-1).
Cooker hood CPD - Installation and Maintenance Manual
a
1
Remove the old cooker hood.
Demontera den gamla spiskåpan.
CPDJ
For heat recovery unit RDKR or RDKS.
b
2
3
4
5
a
RDKS
2
1
The picture illustrates a right hand unit.
3
4
4.1
4.2
5
It is important to seal the grommet by put ting back the small piece of sealing material.
-
b
RDKS
6
7
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 11
Cooker hood CPD -Installation and Maintenance Manual
INSTALLATION (FOR INSTALLERS AND SERVICE PERSONNEL)
CPDK
For heat recovery unit RDKG. (Fits RDKG-a-b-c-d-2).
11
a
2
1
b
3
4
CPDR
For ILOX and RDAS heat recovery units with a 5th mounting ring, or for apartment buildings with external boost damper.
INSTALLATION BETWEEN KITCHEN CABINETS INSTALLATION BENEATH KITCHEN CABINETS
33
115
160
176
96
Ø50
min 500 mm
600 mm
3
2
1
FläktGroup DC_8757GB_20190130_R2
All cooker hoods must be connected directly to earth. See also page 12.
Specifications are subject to alteration without notice
Page 12
12
Yellow/Green
Supply 230V
Yellow/Green
Yellow/Green
Yellow/Green
External
Cooker hood CPD - Installation and Maintenance Manual
ELECTRICAL CONNECTIONS (FOR INSTALLERS AND SERVICE PERSONNEL)
CPDG
Note! Electrical connections have to be made by authorized personnel.
EXHAUST FAN JBDB EXHAUST FAN JBDC
1)
1)
Not for conversion kit JBDB-99-05-0
JBDB
1)
Also for conversion kit JBDB-99-05-0
JBDC
1)
JBDA-99-031 2µF, not included
N
Supply 230V
L
Blue
Blue
Black
CPDG/CPTG
White
Yellow/Green
Black
Orange
JBDA-99-031 2µF, not included
N
Supply 230V
L
ROOF FAN JBFG HEAT RECOVERY UNIT RDAA
JBFG
Brown
Brown
Black
CPDG/CPTG
RDAA
2 4 5 6 731
Black
Blue
Blue
Yellow/Green
Orange
CPDR
FOR CONNECTION TO ILOX AND RDAS HEAT RECOVERY UNITS WITH A 5
The product comes factory-fitted with a boost damper without basic flow. Do not use the damper with basic flow that is supplied with the product.
In order for forced airflow to be activated automatically when the damper is opened, a cable must be connected between the CPDR and the air heating unit.
FläktGroup DC_8757GB_20190130_R2
N
L
Black
th
MOUNTING RING
Yellow/Green
Blue Blue
CPDG/CPTG
Orange
N
Supply 230V
CPDR Junction box
L
Orange
Black
Blue
CPDG/CPTG
Boost damper
FOR CONNECTION TO CENTRAL AIR EXTRACTION SYSTEM IN APARTMENT BUILDINGS
In this case, the boost damper must be replaced.
The product comes ready-fitted with a damper without basic flow, but the supplied damper with basic flow must be used instead.
Specifications are subject to alteration without notice
Page 13
Cooker hood CPD -Installation and Maintenance Manual
c
a
Measuring pressure
ADJUSTMENT
CPDA, CPDB, CPDC, CPDG AND CPDR1) – BASICVENTILATION
Pa a =
7,5 10 12,5 15 20 25
13
30 + 1xC
30
250
200
100
, Pa
m
∆p
50
30 + 2xC
30 + 4xC
40
30
5
6
8
7
10 12
9
15
20
30
Air flow q l/s
1)
CPDR with basic air flow damper.
b
∆p
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 14
14
Air flow q, l/s
Measuring pressure ∆p
, Pa
11
a
ADJUSTMENT
CPDA, CPDB, CPDC, CPDG AND CPDR1) – FORCED VENTILATION
When adjusting the forced air flow the fan speed must be increased up to the forced flow.
Cooker hood CPD - Installation and Maintenance Manual
200
150
100
m
50
40
b = 5
a = 25 10
7 9
25 25
1015 15
10
15
25
a b
10
13
25
a
10
14
25
30
20
10
20 30 40 50 80
1)
CPDR with basic air flow damper.
b
∆p
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 15
Cooker hood CPD -Installation and Maintenance Manual
1
2
3
4
5
6
7
8
9
10
∆p
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
30
10
8
6
4
2
Air flow q, l/s
Measuring pressure ∆p
m
, Pa
ADJUSTMENT
CPDH AND CPDK – BASIC VENTILATION
The basic air flow in the hood is adjusted by removing any number of plugs in the cover plate.
15
FläktGroup DC_8757GB_20190130_R2
2, 4, 6, 8 och 10 = number of open holes in the cover plate.
Connection of the measuring tube
When forcing the air stream must be mea sured at both measure­ment points (basic flow and forced flow).
Specifications are subject to alteration without notice
Page 16
16
Air flow q, l/s
Measuring pressure
b = 7
8 9 11
ADJUSTMENT
CPDH, CDPJ, CPDK AND CDPR1) - FORCED VENTILATION
Damper blade without basic flow valve (sealed damper blade) When adjusting the forced air flow the fan speed must be increased up to the forced flow.
200
150
Cooker hood CPD - Installation and Maintenance Manual
13
, Pa
m
∆p
100
50
40
30
20
10
14
15
20 30 40 50 80
1)
CPDR with damper without basic air flow.
FläktGroup DC_8757GB_20190130_R2
b
∆p
Specifications are subject to alteration without notice
Page 17
Cooker hood CPD -Installation and Maintenance Manual
SPARE PARTS
CPDA, CPDB, CPDC, CPDG, CPDH, CPDJ, CPDK AND CPDR
17
3
2
4
5
11
6
1
4
12
13
15
8
14
7
9
10
Cut the power before start working with the unit. All work has to be carried out by qualified personnel in order to avoid hazard.
Pos No. Designation Description
1 25 CPDA-99-01 Handle x x x x x x x x x 2 10 CPDA-99-02 Lightning switch x x x x x x x x x 3 1 CPDA-99-03 Front board 1-handle, 500 mm x 3 1 CPDA-99-04 Front board 1-handle, 600 mm x x x 3 1 CPDA-99-05 Front board 1-handle, 700 mm x x 3 1 CPDC-99-02 Front board 2-handles, 500 mm x x 3 1 CPDC-99-03 Front board 2-handles, 600 mm x x x x x x 3 1 CPDC-99-04 Front board 2-handles, 700 mm x x x 4 10+10 CPDA-99-07 Black plastic corners, right and left x x x x x x x x x 5 1 CPCA-99-15 Timer with shaft: 600 mm (R, L), 700 mm (R) x x x x x x x
5 1 CPDA-99-10
5 1 CPDJ-99-01 Timer w. shaft: 600, 700 mm (w. contact function) x x 6 10 CPCA-99-09 Lamp socket x x x x x x x 6 10 CPDA-99-12 Lamp socket, transverse light x x x x x x x x x 7 1 CPCA-99-12 Throttling device, complete x x x x x 7 1 CPDH-99-02 8 25 BHGA-99-48 Plastic plugs x x x x x x x
9 10 CPDA-99-06 Lamp protecting glass x x x x x x x x x 10 1 CPCA-99-13 Grease filter x x x x x x x x x 11 5 CPDC-99-01 Switch x x x x x x 12 1 CPDG-99-01 Transformer x x 13 1 CPDH-99-01 Time relay x
14 10 CPDA-99-15
15 10 CPDA-99-13 Damper gasket, 10-pack x x x x x x x x x
Pos 5. R = Rght, M = Middle, L = Left
Timer with shaft: 500 mm (M), 600 mm (M), 700 mm (M, L)
Throttling device, complete (without basic flow)
Damper eccentric, 10-pack
A B C G H J K M R
x x x
x x x x x x x x x
Passande till CPD...
x x x x x
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 18
18
II A
DECLARATION OF CONFORMITY
Declaration of Conformity
In accordance with: EU Directive for Machinery, 2006/42/EC EU EMC Directive, 2014/30/EU EU RoHS Directive, 2011/65/EU
Cooker hood CPD - Installation and Maintenance Manual
ENCLOSURE
Manufacturer FläktGroup Sweden AB
Product Type:
Authorized To prepare technical documentation:
Fläktgatan 1 551 84 Jönköping
Herewith declares that:
Manufacturer: Commercial name:
The machine is designed and manufactured in accordance with the following standards, in relevant parts.
EN ISO 12100 Safety of machinery – General principles for design- Risk assessment and risk reduction
EN 60204-1 Safety of machinery; electrical equipment of machines; general requirements
EN 60335-1 Household and similar electrical appliances - Safety - Part 1: General requirements
EN 60335-2-31 Household and similar electrical appliances - Safety - Part 2: Particular requirements
EN 61000-6-1 Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity for
EN 61000-6-3 Emission standard for residential, commercial and light-industrial environments. EN 50106:2008 Safety of household and similar electrical appliances - Particular rules for routine tests
EN 62233:2008 Measurement methods for electromagnetic fields of household appliances and
EN 50581:2012 Technical documentation for the assessment of electrical and electronic products with
A risk analysis has been made according to requirements of the Directive for Machinery.
Ann-Sofie Andersson Design- R&D
FläktGroup Sweden AB
Fläktgatan 1 551 84 Jönköping
Cooker Hood FläktGroup Sweden AB CPD/A/B/C/D/G/H/J/K/L/R ( several versions / variants)
residential, commercial and light-industrial environments
referring to appliances under the scope of EN 60335-1
apparatus with regard to human exposure
respect to the restriction of hazardous sustances
similar
Jönköping 2019-01-01
Björn Norling, Quality Manager, FläktGroup Sweden AB, Jönköping
Postal Address Street Address Telephone Telefax Reg. no: FläktGroup Sweden AB Fläktgatan 1 Nat 036 - 19 30 00 Nat 036 - 19 31 40 556239-2463 S-551 84 Jönköping Int +46 36 19 30 00 Int +46 36 19 31 40 Reg. office: Sweden Jönköping
8364GB_CPD Declarati on of conformity(2A)201901
FläktGroup DC_8757GB_20190130_R2
The declaration applies only to the installation made according to FläktGroups instructions and assuming no changes made to the unit.
FläktGroup Sweden AB
Specifications are subject to alteration without notice
Page 19
Cooker hood CPD -Installation and Maintenance Manual
DISPOSAL OF PRODUCT AND PACKAGING MATERIALS
Recycling should be made in accordance with local regulations. When the product is scrapped the following parts/components/ materials shall be sorted. Depending on what product it is may not all parts/com ponents/materials be represented.
Printed circuit boards, cables, batteries,
– motors, sensors etc.
– Filters, except made of pure metal (in cooker hoods).
– Packaging materials, such as card­board, plastic and styrofoam.
The units casing may contain condense- or mineral wool
–
insulation sandwiched between the inner and outer shell.
–
The remaining parts shall be sorted as metallic.
– Lamps and fluorescent lights.
-
19
See www.flaktgroup.com for recycling instructions.
FläktGroup DC_8757GB_20190130_R2
Specifications are subject to alteration without notice
Page 20
FläktGroup is the European market leader for smart and energy efficient Indoor Air and Critical Air solutions to support every application area. We offer our customers innovative technologies, high quality and outstanding performance supported by more than a century of accumulated industry experience. The widest product range in the market, and strong market presence in 65 countries worldwide, guarantee that we are always by your side, ready to deliver Excellence in Solutions.
FG_DC_8757GB_CPD_IN-MA-CM-SP_20190130_R2 © Copyright 2019 FläktGroup J8013821-2301
WWW.FLAKTGROUP.COM CPD
PRODUCT FUNCTIONS BY FLÄKTGROUP
Air Treatment | Air Movement | Air Diffusion | Air Distribution | Air Filtration Air Management & ATD’s | Air Conditioning & Heating | Controls | Service
» Learn more on www.flaktgroup.com or contact one of our offices
Loading...