Fisher IM Supplement: Configuring and Performing Partial Stroke Testing via Loop Current Initiation with DVC6200 SIS Manuals & Guides

Instruction Manual Supplement
D104146X012
Configuring and Performing Partial Stroke Testing via Loop Current Initiation with the
DVC6200 SIS
August 2020
Fisher
FIELDVUE™ DVC6200 SIS Digital Valve
Controller
Use these procedures in conjunction with the Safety manual (D103601X012 In addition, exercise good engineering practices and abide by specific plant safety guidelines for safe operation.
WARNING
This document is not intended to be used as a stand‐alone document. It must be used in conjunction with the following documents: Safety Manual for FIELDVUE DVC6200 SIS Digital Valve Controller and Position Monitor (D103601X012 Fisher FIELDVUE DVC6200 SIS Instruction Manual (D103557X012
Failure to use this instruction manual supplement in conjunction with the above referenced manuals could result in personal injury or property damage. If you have any questions regarding these instructions or need assistance in obtaining any of these documents, contact your Emerson sales office
)
.
) and Instruction Manual (D103557X012).
)
Configuring Loop Current Partial Stroke Test Initiation using
ValveLink
Note
Loop current Partial Stroke Testing applies to DVC6200 SIS in Point-to-Point operation only.
www.Fisher.com
software
DVC6200 SIS
August 2020
Instruction Manual Supplement
D104146X012
Using ValveLink software, select Instrument Setup > Detailed Setup and find the SIS / Partial Stroke tab. Find the Start PST on Loop Current Trigger parameter and set it to to “Enabled”.
2
Loading...
+ 2 hidden pages