Finelite HP-WG Installation Instructions Manual

HP-WG Post-Ceiling T-Bar Installation Instructions
Overview
NOTES
HELPFUL
VIDEO
All power connections should be installed according to
local/national codes by a Certified Electrician.
is being installed.
DO NOT attempt to join luminaires together on the floor.
Damage may result when lifted.
0-10V
Dimming
Simple
Plug-Together
Wiring
Step 1
Mounting Locations & Methods
Page 2
Step 4
Mounting Starter to Structure
Pages 6-7
Stud
Step 5
Joining Luminaires
Page 8
Step 6
Closing Luminaires
Pages 9-10
Step 3
Feed Locations & Options
Pages 4-5
Wall
Step 2
Identification & Preparation
Page 3
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
T-Bar
Patent Pending
Finelite, Inc. • 30500 Whipple Road • Union City, CA 94587-1530 • (510) 441-1100 • Fax: (510) 441-1510 • www.finelite.comThis is a hypothetical build to show the capabilities of this luminaire family and mount type. Your build may vary.
1 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 1 - Mounting Locations & Methods
Max. 3/8"
Wall
1/2"
Z
Luminaire Depth Rough In Opening (in)
2", 4" & 6" Z = 6-1/2
B. Mounting Locations A. Create Rough In
2"
1/2"
Endcap
Top ViewSide View
Mounting Location Top Feed (standard)
1/2"
Wall
Endcap
A
Luminaire Length A (in) B (in)
2' 3 18 3' 3 30 4' 6 36 8' 6 84
B
Endcap Information (Side Views):
The Wall-to-Wall Endcap adds 1/8" per endcap.
Endcap
1/8"
The Pocket Slot Endcap adds 1-1/4" for Spackle Flange and 1" for T-Bar per endcap.
Spackle Flange T-Bar
Drywall Screw
Ceiling Tile
Drywall
1-1/4"
1"
Alternative "L" Bracket Mounting (by others) Alternative Mount to Structure (by others)
Use appropriate hardware (by others) to secure "L" Bracket to luminaire.
"L" Bracket (by others)
Wall
1/2"
Luminaire Depth Y (in)
2" 5-1/8 4" 7-1/8 6" 9-1/8
T-Bar
Support Wire (by others)
Y
Luminaire
Tab
In addition to alternative mounting methods, luminaire must be secured to structure by support wire (by others) per building code.
Wall
Luminaire Depth X (in) Y (in)
2" 6-5/8 5-1/8 4" 6-5/8 7-1/8 6" 6-5/8 9-1/8
X
1/2"
Structural Blocking (by others)
T-Bar
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
Y
2 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 2 - Identification & Preparation
A. Identify Luminaires
Bottom-Up View
Arrange luminaires in order according to ID# at their install locations.
CAUTION
Unique Luminaire
ID Number
Job Name
Factory Order
Number
Starter
Flexible Mounting Plate
ABC Corporation - A12345
ID: 1
HP-WG - 6W - 4D - X' STARTER
HP-WG - 6W - 4D - 32' - S - 830 - 120V - SC - TR
Luminaire Type
and/or Run Length
Identify all luminaires by their ID label that can be found on the box and inside the luminaire.
NOTE: Exact location of labels in these areas may vary.
Remove all luminaires from their box.
Refer to Record Drawings that can be found in the hardware kit.
Full Catalog
Order ID
Luminaire
Section Type
Kitted Hardware
Finelite has provided items
listed here, with their Finelite part numbers. These items can be found in separate boxes shipped with the luminaire.
Account for all parts and set
aside until they are needed.
All other hardware needed
for this installation will be by others.
#8-18 x 1/4" Screw
Part# 69026
Feed Locations & Options p. 4, Step 3 Mounting Starter to Structure p. 6-7, Step 4 Joining Luminaires p. 8, Step 5 Closing Luminaires p. 9-10, Step 6
#10-32 Screw
Part# 94144
Feed Locations & Options p. 4, Step 3
Extrusion Joiner Bracket
Part# 11302
Joining Luminaires p. 8, Step 5
ID Label
T-Bar Bracket
Part# 11303
Closing Luminaires p. 10, Step 6
Cover Sleeve
Part# 10719
Closing Luminaires p. 10, Step 6
'
ABC Corporation - A12345
HP-WG - 6W - 4D - X STARTER
HP-WG - 6W - 4D - 32' - S - 830 - 120
ID: 1
V - SC - TR
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
3 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 3 - Feed Locations & Options
WIRING LEGEND
Black Hot Line Voltage
White Neutral Line Voltage
Green Ground
Grey Dimming 0-10V DC
Purple Dimming 0-10V DC
1/4"-20 Threaded Rod (by others)
Top Feed (standard)
Power Feed
#10-32 Screw (provided)
Wall Feed (optional)
Power Feed
Endcap Feed (optional)
#8-18 x 1/4" Screw
(provided)
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
#8-18 x 1/4" Screw
(provided)
CONTINUED
#10-32 Screw
(provided)
0-10V
Dimming
4 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 3 - Feed Locations & Options
Top Feed
Luminaire Length C (in)
Top Feed Location (standard)
Use chart above to find measurement of C for feed location.
NOTE: For tailored length luminaire power feed locations, contact factory.
Wall Feed Endcap Feed
Top View
2" 2' 5 3' 5 4' 12 8' 12
Back View Side View
C
Top Feed (standard)
6"
Wall
Wall Feed (optional)
D
5-9/16"
1/4"-20 Threaded Rod (by others)
Luminaire Depth D (in)
2" 3-5/16 4" 5-5/16 6" 7-5/16
G
Wall
F
Luminaire Width F (in) G (in)
6" 2 13/16
Endcap Feed (optional)
T-Bar
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
5 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 4 - Mounting Starter to Structure
A. Open Kickplate B. Remove CarrierBottom-Up View Side View
Starter
Housing Bracket
Driver
Wall
Safety Cable
Carrier
#8-18 x 1/4" Screw (provided)
Housing Bracket
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
Kickplate
Make electrical connections according to feed location and options.
To access carrier, open kickplate by unsnapping along the whole length of the luminaire (about every 6").
#8-18 x 1/4" Screw
(provided)
Kickplate
Once kickplate has been opened, remove the #8-18 x 1/4" screw and slide carrier toward wall to detach from housing.
NOTE: The carrier will be suspended by safety cables but you can remove them for complete open access.
CONTINUED
6 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 4 - Mounting Starter to Structure
C. Mount Luminaire
Standard Option 1 Option 2
Bottom-Up View
1/4"-20 Threaded Rod
Starter
Flexible Mounting Plate
1/4" Washer (by others)
1/4"-20 Nut (by others)
Side View Side View
"L" Bracket (by others)
Appropriate Fastening Hardware (by others)
Structural Blocking (by others)
Appropriate Fastening Hardware (by others)
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
MOUNT TO THREADED ROD (Standard)
Mount the luminaire to structure using a 1/4"-20 nut and washer on a threaded rod.
NOTE: The flexible mounting plate can move for a precise fit.
If there is no joiner/ender, then tighten nuts fully. PROCEED TO STEP 6.
#8-18 x 1/4" Screw
(provided)
1/4"-20 Nut
(by others)
MOUNT TO "L" BRACKET (Optional)
Mount the luminaire to structure using an "L" bracket with appropriate fastening hardware.
NOTE: The flexible mounting plate can move for a precise fit.
If there is no joiner/ender, then tighten nuts fully. PROCEED TO STEP 6.
1/4" Washer
(by others)
1/4"-20 Lag Bolt
(by others)
"L" Bracket
(by others)
MOUNT TO STRUCTURE (Optional)
Mount the luminaire to structure using appropriate fastening hardware.
NOTE: The flexible mounting plate can move for a precise fit.
If there is no joiner/ender, then tighten fully. PROCEED TO STEP 6.
7 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 5 - Joining Luminaires
A. Install Joiner/Ender
DO NOT attempt to join
luminaires together on the floor. Damage may result when lifted.
CAUTION
Follow these instructions.
Ceiling
T-Bar
Bottom-Up View C. Plug-Together Wiring Bottom-Up View
B. Secure Joiner Brackets Side View
#8-18 x 1/4" Screw (provided)
Aligner Plate
Joiner/Ender
Top
Ceiling
Starter
Joiner/Ender
Aligner Plate
T-Bar
Joiner/ Ender
Plug-Together Wiring
Starter
Wall
Slide the joiner/ender luminaire over the aligner plate on the installed luminaire.
See Step 3C for how to secure a joiner/ender luminaire to structure.
NOTE: Slightly tilt starter and joiner/ender luminaires before installing onto wall.
#8-18 x 1/4" Screw
(provided)
Extrusion Joiner Bracket
(provided)
#8-18 x 1/4" Screw (provided)
Bottom
Ensure that the holes are aligned on the plate.
Fasten the joiner/ender luminaire to the aligner plate using a #8-18 x 1/4" screw.
Secure the joiner brackets using a #8-18 x 1/4" screw.
CAUTION: Do not over-tighten.
Joiner Bracket
Starter
Wall
Connect the plug-together wiring.
Secure all luminaires by tightening all nuts to threaded rods.
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
Simple
Plug-Together
Wiring
8 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 6 - Closing Luminaires
A. Replace Carrier
Housing Bracket
Side View
B. Secure Carrier & Snap Kickplate Side View
Housing Bracket
Carrier
Carrier
Hook carrier to the housing brackets.
#8-18 x 1/4" Screw
(provided)
#8-18 x 1/4" Screw (provided)
Secure carrier with #8-18 x 1/4" screw.
Rotate kickplate and snap back into place along the whole length of the luminaire (about every 6").
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
Kickplate
CONTINUED
9 of 10
HP-WG Post-Ceiling T-Bar Installation Instructions
Step 6 - Closing Luminaires
C. Secure to Structure D. Final Step - Install Cover SleeveSide View Side View
T-Bar Bracket (provided)
Bend Here
#8-18 x 1/4" Screw
T-Bar Bracket (provided)
(provided)
T-Bar Bracket (provided)
T-Bar Extrusion
T-Bar
Self-Drilling Screw (by others)
FOR T-BAR:
Gently bend T-Bar bracket so it aligns with T-Bar.
Secure T-Bar bracket to T-Bar extrusion using #8-18 x 1/4" screw.
Secure T-Bar bracket to T-Bar using self-drilling screws.
Wall
#10 Screw (by others)
FOR WALL:
Secure T-Bar bracket to wall using appropriate #10 screws.
Carrier
1
Cover Sleeve (provided)
1. Hook back edge of cover sleeve over edge of carrier.
2. Snap front edge of cover sleeve in place along the whole length of the luminaire (about every 6").
Once cover sleeve is in place, turn power on to luminaire.
2
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98423. V3 EFFECTIVE DATE: 01/29/19
T-Bar Bracket
(provided)
#8-18 x 1/4" Screw
(provided)
#10 Screw
(by others)
Cover Sleeve
(provided)
10 of 10
Loading...