Festo YHBP-1 Instructions Manual

YHBP-1
Balancer kit
Instructions| Assembly, Installation
8088702
8088702 2018-11 [8088704]
2 Festo — YHBP-1 — 2018-11
Table of contents
1 About this document................................................................................................... 4
1.1 Applicable documents.................................................................................................. 4
2 Safety........................................................................................................................... 5
2.1 General safety instructions........................................................................................... 5
2.2 Intended use................................................................................................................ 6
2.3 Foreseeable misuse...................................................................................................... 6
2.4 Training of qualified personnel..................................................................................... 6
3 Further information..................................................................................................... 6
4 Service..........................................................................................................................6
5 Product overview YHBP............................................................................................... 7
5.1 Scope of delivery.......................................................................................................... 7
5.2 Function....................................................................................................................... 8
6 Transport..................................................................................................................... 8
7 Assembly..................................................................................................................... 9
8 Installation.................................................................................................................. 10
8.1 Interfaces of valve unit VPCB-...-T22............................................................................. 10
8.2 Pneumatic installation.................................................................................................. 11
8.3 Interfaces CECC-D-BA................................................................................................... 12
8.4 Electrical installation.................................................................................................... 14
9 Commissioning............................................................................................................ 17
10 Operation..................................................................................................................... 17
11 Service..........................................................................................................................18
11.1 Cleaning....................................................................................................................... 18
12 Malfunctions............................................................................................................... 18
12.1 Repair............................................................................................................................18
13 Disassembly................................................................................................................ 18
14 Disposal........................................................................................................................19
15 Technical data............................................................................................................. 19
3Festo — YHBP-1 — 2018-11

About this document

1 About this document
This document only contains information on the assembly and installation of the enclosed individual components. Application examples, information on implementing safety functions, commissioning and operation are provided in separate documents.

1.1 Applicable documents

All available documents for the product èwww.festo.com/pk.
Documents Product, type Contents
Catalogue inform­ation
Instruction manu-alISO cylinder with displacement
Instruction manu-alControl element,
Instruction manu-alValve unit,
Instruction manu-alConnector-SET
Description Controller,
Brief description Controller,
Circuit diagram Balancer kit,
Installation instructions
Instruction manu-alProximity sensor,
Instruction manu-alConnecting cable,
Catalogue inform­ation
Tab. 1 Further applicable documents on the balancer kit
ISO cylinder, DSBG-...
encoder DNCI-32-...
VAOH-P15-H13
VPCB-...-T22
VABS-P15-S-B6
CECC-D-
CECC-D-
YHBP
Plug, NECC-S1G9-C2-M
SMT-8M-A-PS-24V-E-2,5-OE
NEBC-M12G5-KS-LE5-CO
Connecting cable, KME-1-24DC-5-LED
Technical data
Operation
Operation
Operation, installation
Assembly
Operation
Installation
Electrical and pneumatic interconnec­tion
Assembly
Operation
Operation
Technical data
Festo — YHBP-1 — 2018-114

Safety

Documents Product, type Contents
Application notes1)Balancer kit,
YHBP
1) Application notes are regularly revised and updated.
Tab. 2
The range of application and certifications of the individual components of the kit are described in separate documents èwww.festo.com/sp.
Download configuration-dependent documents
The technical data for the product are set out in configuration-dependent documents. These documents form part of the product documentation and can be downloaded as follows.
1. Read the order ID/product key/Data Matrix Code of the product.
2. Download documents from the Festo Support Portal by entering the order ID/product key/Data Matrix Code èwww.festo.com/sp.
3. Print out documents and keep together with this description.
Commissioning – Operation and special functions – Implementation of safety functions –
2 Safety

2.1 General safety instructions

Observe labelling on the product. – Take into consideration the ambient conditions at the location of use. – Prior to mounting, installation and maintenance work: Switch off power supply and secure it from
being switched back on.
Prior to mounting, installation and maintenance work: Switch off compressed air supply and
secure it from being switched back on.
Comply with the handling specifications for electrostatically sensitive devices. – Observe tightening torques. Unless otherwise specified, the tolerance is±20%.
5Festo — YHBP-1 — 2018-11

Further information

2.2 Intended use

This product is a kit for implementing the actuation, regulation and control function of a hand-guided balancer. Use the product only as follows: – In perfect technical condition – In its original condition, without unauthorised modifications – Within the limits of the product defined by the technical data – In an industrial environment – Permanently mounted
In the event of damage caused by unauthorised manipulation or any use other than that intended, the warranty is invalidated and the manufacturer is not liable for damages.

2.3 Foreseeable misuse

Never use the product as follows: – With unauthorised modifications or alterations to the product – With load limits exceeded – In an invalid mounting position

2.4 Training of qualified personnel

Installation, commissioning, maintenance and disassembly should only be conducted by qualified per­sonnel. The personnel must be familiar with the installation of mechatronic control systems.
3 Further information
Accessories èwww.festo.com/catalogue. – Spare parts èwww.festo.com/spareparts.

4 Service

Contact your regional Festo contact person if you have technical questions èwww.festo.com.
6 Festo — YHBP-1 — 2018-11

Product overview YHBP

5 Product overview YHBP
1
Working cylinder DSBG
2
Cylinder DNCI with displacement encoder system and mounted proximity sensor SMT
3
Connecting cable of the DNCI
4
Laptop (not in scope of delivery)
5
Connecting tube (not in scope of delivery)
6
Valve unit VPCB...
Fig. 1 Product overview YHBP
7
Connecting cable NEBC-M12G5-K5-5-LE5-CO with plug NECC-S1G9-C2-M
8
CECC-D-BA with application software for bal­ancer kit
9
Connecting cable KME-1-24DC-5-LED (2x)
10
Control element VAOH
11
Tubing (not in scope of delivery)

5.1 Scope of delivery

The kit only contains individual components that can be used for building a servo-pneumatic balancer. Only the assembly and installation of these components is described. Not all components needed for building a complete servo-pneumatic balancer are included. The manufacturer of the servo-pneumatic balancer is responsible for implementing and observing all standards, guidelines and regulations.
Supporting application notes on various topics are provided è 1.1 Applicable documents.
7Festo — YHBP-1 — 2018-11

Transport

5.2 Function

With this balancer kit, the safety functions "Safely limited speed" (SLS) and "Safe stopping and con­trol" (SSC) can be implemented with pneumatic actuators in performance level b (PLb). The controller for the balancer kit automatically detects the weight of the load and automatically adjusts the balancing force. It is capable of detecting weight changes when floating. Two operating modes can be realised: – Load-controlled mode:
The load mass is moved with the control element VAOH or alternatively directly at the workpiece. An adjustment of the mass does not take place in this operating mode. Weight changes are not detected in this mode.
Position-Halten Mode:
The load mass is only moved via the control element. The load is kept in each position, even if this
changes. Loads can be picked up or set down via the control element. An exact description of the operating modes can be found in the application notes è 1.1 Applicable documents.
6 Transport
Sequence of transport and unpackaging
NOTICE!
Damage to the product due to incorrect transport.
Observe the transport labelling and information on the packaging.
1. Transport the product to the installation/storage location in its packaging and set it down on a
firm and flat base.
2. When storing: Pay attention to the storage conditions è 15 Technical data.
NOTICE!
Damage to the product due to incorrect unpacking.
Observe the labelling and information on unpacking shown on the packaging.
Unpack the product with at least 2 persons present.
Use appropriate tools.
Parts of the packaging are large and heavy:
Do not let any parts fall onto the product.
Use suitable aids to raise and lower the product (e.g. crane).
3. Remove the packaging in accordance with the printed sequence.
Restraints in the packaging
Shaped parts made of foam prevent uncontrolled movement of the product in the packaging during transport.
8 Festo — YHBP-1 — 2018-11

Assembly

7 Assembly
CAUTION!
Risk of injury due to falling product.
Make sure the mounting surface is sufficiently strong to absorb the maximum forces.
Only use suitable mounting components.
Secure the screw connections.
Observe the information on mounting components in the respective documentation è 1.1 Applicable documents.
1. Assemble the cylinder DSBG and accessories as follows. – Assemble the DSBG backlash-free and free from transverse loads. – To prevent friction, ensure parallelism with the guide unit. – If possible, use a self-aligning rod coupler to balance the angular and radial backlash.
2. Mount the proximity sensor SMT as a reference sensor to the displacement encoder DNCI. The proximity sensor is needed for referencing of the displacement encoder. Information on referen­cing è 1.1 Applicable documents. – Attach the proximity sensor near the lower end position of the DNCI. Tightening torque:
£0.6Nm
3. Assemble the displacement encoder DNCI backlash-free and parallel to the cylinder DSBG. – There must be a secure connection between the DSBG piston rod and DNCI piston rod. – Choose suitable accessories in accordance with the installation situation.
4. Assemble the valve unit VPCB.
5. Connect the valve unit VPCB with the cylinder DSBG. There are two options for this: – Connect the valve unit VPCB directly with the cylinder DSBG using a double nipple.
Internal diameter: ³8mm Connect the valve unit VPCB with a pipe or a suitable hydraulic hose £300mm with the cylin-
der DSBG.
A connection with the aid of tubing is not permitted.
Assemble the control element VAOH in the appropriate place. Tightening torque: £10Nm
6.
7. Assemble the balancer kit CECC-D-BA in accordance with local conditions and in compliance with the degree of protection.
9Festo — YHBP-1 — 2018-11

Installation

8 Installation

8.1 Interfaces of valve unit VPCB-...-T22

1
Connection [1] G3/8 for compressed air
3
Connection [3] G3/8 for exhaust air
4
Manual exhausting
5
Installation option for connection set VABS-P15-S-B6 for direct pressure measurement on cylinder DSBG
6
"Status" LED
7
“Power/Error” LED
8
Earth connection
Fig. 2 VPCB interfaces
2
Connection [2] G3/8 for working air (balancer cylin­der)
9
Connection G1/8 for pneumatic control element
10
Connection CECC-D-BA (CAN interface)
11
Connection displacement encoder of the DNCI
12
Shut-off valve 1
13
Shut-off valve 2
Fig. 3 VPCB interfaces
10 Festo — YHBP-1 — 2018-11
Installation

8.2 Pneumatic installation

Make pneumatic connections cable ends as short as possible.
Ensure sufficient torque for fittings and tightness of the pneumatic connections. A leakage can lead to unwanted system behaviour.
For details on pneumatic installation, see circuit diagram è 1.1 Applicable documents.
1. Connect input [1] of valve unit VPCB with a service unit and filter mesh 5µm (not in scope of deliv­ery). Tubing diameter: ³12mm
2. Connect pressure gauge input (connection [9] "Bedienelement") of valve unit VPCB with handle VAOH. – Tubing diameter: 6mm
Tube length: ³0.5m…£10m.
3. Assemble the silencer (not in scope of delivery) as follows: – Mount the silencer to the exhaust ports [3] of the valve unit VPCB. – Mount the silencer to the exhausted cylinder chamber (usually the piston rod side connection
of the cylinder).
Ensure sufficient dimensioning of the silencer to prevent backlog and increased noise emissions. In the case of ducted exhausting, connect the exhaust compressed air system instead of the silen­cer.
11Festo — YHBP-1 — 2018-11
Installation

8.3 Interfaces CECC-D-BA

Overview of interfaces
1
Status LEDs
2
Functional earth connection
3
Ethernet interface [X8]
4
Power supply to device [X1]
5
I/O interfaces [X2, X3, X4, X5]
6
CAN interface [X6]
7
Power supply for the I/O interfaces [X5]
Fig. 4 Interfaces CECC-D-BA
The status LEDs show the operating status of the CECC-D-BA.
Status LED Meaning
[Run] Application status
[Error] Error
1)
[Net]
1)
[Mod]
1) Not used in all applications.
Device detected
Reserved
Tab. 3 Status LEDs
12 Festo — YHBP-1 — 2018-11
Installation
I/O interface [X2, X3, X4]
Terminal Connection Use
X2.0 8 digital inputs Operation enable
X2.1 Control element (handle) active
X2.2 Reserved
X2.3 Reference sensor
X2.4 Reset fault
X2.5 Change operating mode
X2.6 Reserved
X2.7 Reserved
X3.0 6 digital inputs System enable
X3.1 ... X3.5 Can be configured by the user
X4.0 8 digital outputs Operation enabled
X4.1 Can be configured by the user
X4.2 Shut-off valve 1
X4.3 Shut-off valve 2
X4.4 Error
X4.5 Last run mode active
X4.6 Position-holding mode active
X4.7 System active and ready
Tab. 4 I/O interface connection
13Festo — YHBP-1 — 2018-11
Installation
Ethernet interface [X8]
NOTICE!
Unauthorised access to the device can cause damage or malfunctions.
When connecting the device to a network, protect the network from unauthorised access. Measures to protect the network include:
Firewall
Intrusion Prevention System (IPS)
Network segmentation
Virtual LAN (VLAN)
Virtual Private Network (VPN)
Security at physical access level (Port Security)
The Ethernet interface of the CECC-D-BA is used as an RJ-45 bushing to configure and parameterise the system through a PC/tablet connected to the network. After the mechanical and electrical installation, the servo-pneumatic balancer can be commissioned with a web browser. A requirement for this is integration of the CECC-D-BA in the local network. Access is through entry in the address line: http://<<IP-Adresse>>:8080/webvisu.htm Example: http://192.168.2.20:8080/webvisu.htm
Minimum requirements for a PC/tablet
Web browser with Java Script and support of HTML5 Canvas, e.g. Firefox, Chrome, Internet
Explorer ³ Version9
Screen resolution 1280 x 768 pixels

8.4 Electrical installation

WARNING!
Risk of injury due to electric shock.
For the electric power supply, use only PELV circuits that ensure a reliable electric disconnection from the mains network.
Observe IEC60204-1/EN60204-1.
Not all required parts are included in the scope of delivery. For the complete installation, the actuating elements for the following functions are needed at a minimum: – Operation enable – System enable – Switch between the operating modes – Reset fault Details on the electrical installation are described in the enclosed circuit diagram and in the corres­ponding application notes è 1.1 Applicable documents.
1. Connect the connecting cable of the DNCI displacement encoder with the corresponding input of the mono-block valve unit VPCB.
2. Assemble the plug NECC-S1G9-C2-M in accordance with the enclosed circuit diagram YHBP. Observe accompanying installation instructions for the plug NECC-S1G9-C2-M è 1.1 Applicable documents.
14 Festo — YHBP-1 — 2018-11
Installation
3. Switch on integrated 120Ω bus termination in the plug NECC-S1G9-C2-M.
4. Connect the CAN interface [X1] of the balancer controller CECC-D-BA with the corresponding input of the valve unit VPCB. – Install cable without tension.
5. Create the remaining connections to the balancer controller CECC-D-BA in accordance with the application.
Pin allocation CAN connecting cable
VPCB-...-T22 Cable
NEBC-...
Signal Sub-D plug connector
NECC
Connection Pin Wire
1)
colour
1
Shield
2 RD 24VDC 1V+
3 BK 0VDC GND 3
4 WH CAN_H 1C+ 7
Manifold block BUS IN
5 BU CAN_L 1C
Cable, 2-wire
1) Colour code in accordance with IEC 60575:1983-01
24 V logic 2V+ 9
GND logic GND 3
2C+
2C
Manifold block BUS OUT
Tab. 5 Pin allocation CAN connecting cable
Power supply CECC-D-BA [X1]
Intrinsic current consumption: £100mA
Use an external overload protection for the power supply of the device.
Terminal Connection Use
CECC-D-BA
Pin Connection
2
X1.1 24 24 V DC
X1.2 0 0 V DC
X1.3 Functional earth
X1.4 Not assigned
Tab. 6 Power supply connection CECC-D-BA
1. Supply the device with power.
2. Place the open cable ends in the plug provided in accordance with the table.
3. Insert the plug into the connection [X1] of the balancer controller CECC-D-BA.
15Festo — YHBP-1 — 2018-11
Installation
Power supply of the digital I/Os [X5]
Resultant current for all supplied ports: £2A
Terminal Connection Use
X5.1 24 24VDC
X5.2 0 0VDC
Tab. 7 Connection, power supply for digital I/Os
1. Supply the device with power.
2. Place the open cable ends in the plug provided in accordance with the table.
3. Insert the plug into the connection [X5] of the controller.
Connection, reference sensor
Connect the proximity sensor SMT-8M-A-PS-24V-...-OE that serves as a reference sensor as follows.
SMT-8M-A-PS-24V-...-OE CECC-D-BA
Wire colour
1)
Function Connection
BN 24VDC supply 24Vload
BK Switching output Digital input X2.3
BU GND 24VGND
1) Colour code in accordance with IEC 60575:1983-01
Tab. 8 Connection, reference sensor
Earthing
Connect the earth terminal of the mono-block valve unit VPCB using an earthing cable, self-tap-
ping screw and toothed disc (included in the scope of delivery) with low impedance to the earth potential.
Connect the earth terminal of the sensor interface CASB-MT-D3-R7 with low impedance to the
earth potential.
16 Festo — YHBP-1 — 2018-11

Commissioning

9 Commissioning
CAUTION!
Risk of injury due to unexpected movement of components.
Protect the positioning range from unwanted intervention.
Keep foreign objects out of the positioning range.
Perform commissioning at low speed.
NOTICE!
Material damage due to incorrect or incomplete installation.
The following conditions must be fulfilled for commissioning:
The system must be fully assembled.
The electrical installation must be complete and checked.
The pneumatic installation must be complete and checked.
Prior to commissioning, a safety analysis must be carried out and all appropriate measures implemen­ted. Commissioning is dependent on the customer-specific application. – During commissioning, observe the associated documentation for the individual components
installed è 1.1 Applicable documents.
Web visualisation of the balancer controller CECC-D-BA enables commissioning via the web browser è Ethernet interface [X8].
Power supply
When switching on the power supply, proceed as follows:
1. Switch on the power supply.
2. Switch on the compressed air supply.

10 Operation

Operation is dependent on the customer-specific application. – During operation, observe the associated documentation for the individual components installed
è 1.1 Applicable documents.
17Festo — YHBP-1 — 2018-11

Service

11 Service
The descent rate during operation of the manual exhausting is dependent on the customer-specific application.
Before the commencement of maintenance and cleaning work:
1. Slowly lower the balancer with the aid of manual exhausting on the valve unit VPCB into a safe position or secure it from falling using suitable measures.
2. Exhaust system parts with stored compressed air.
3. Switch off the operating voltage and secure it against being switched on again.
4. Carry out maintenance work on the installed individual components in accordance with the relev­ant documentation è 1.1 Applicable documents.

11.1 Cleaning

Clean the outside of the product with a soft cloth. Do not use aggressive cleaning agents.

12 Malfunctions

The display and elimination of malfunctions are dependent on the customer-specific application. – During operation, observe the associated documentation for the individual components installed
è 1.1 Applicable documents.

12.1 Repair

In the event of repair, contact the Festo repair service èwww.festo.com.

13 Disassembly

The descent rate during operation of the manual exhausting is dependent on the customer-specific application.
Before the commencement of disassembly work:
1. Slowly lower the balancer with the aid of manual exhausting on the valve unit VPCB into a safe position or secure it from falling using suitable measures.
2. Exhaust system parts with stored compressed air.
3. Switch off the operating voltage and secure it against being switched on again.
4. During disassembly, observe the associated documentation for the individual components installed è 1.1 Applicable documents.
18 Festo — YHBP-1 — 2018-11

Disposal

14 Disposal
ENVIRONMENT!
Send the packaging and product for environmentally sound recycling in accordance with the current regulations èwww.festo.com/sp.

15 Technical data

Designation Value
Storage temperature [°C] 2070
Ambient temperature [°C] 040
Stroke range [mm] 1001000
Mass load [kg] 70999
Cylinder diameter [mm] 80200
Travel speed [m/s] £1
Operating voltage DC [V] 21.626.4
Duty cycle [%] 100
Residual ripple [%] 5
Operating pressure [bar] 48
Operating medium Compressed air to ISO8573-1:2010 [6:4:4]
Lubricated operation not possible. Maximum particle size 5µm.
Degree of protection (in mounted status)
Achievable perform­ance level
Product weight [kg] Approx. 850
Note on materials Contains paint-wetting impairment substances
1) IP20 for controller CECC-D-BA
Tab. 9 Technical data
1)
IP65
PLb for SLS/SSC
19Festo — YHBP-1 — 2018-11
Reproduction, distribution or sale of this document or communic­ation of its contents to others without express authorization is prohibited. Offenders will be liable for damages. All rights reserved in the event that a patent, utility model or design patent is registered.
Copyright: Festo AG & Co. KG Ruiter Straße 82 73734 Esslingen Germany
Phone: +49 711 347-0
Fax: +49 711 347-2144
e-mail: service_international@festo.com
Internet: www.festo.com
Loading...