Fer FERtech 25 OV Instructions For Use, Installation And Maintenance

Page 1
FERtech 25 OV
INSTRUCTIONS FOR USE INSTALLATION AND MAINTENANCE
cod. 3540U431 - 11/2009 (Rev. 00)
8
Seasonal Efficiency
(SEDBUK)
band A
Page 2
FERtech 25 OV
2
Cod. 3540U431 - 11/2009 (Rev. 00)
• Read the warnings given in this manual thoroughly. They provide important information for safe instal­lation, use and maintenance
• By law the instruction manual must be left with the end user.
• If the appliance is sold or transferred to another owner or if the owner moves, leaving the appliance behind, always ensure that the manual is kept with the appliance for consultation by the new owner and /or installer.
• Incorrect installation or poor maintenance absolves the manufacturer from all liability for damage to people or property.
• Installation and maintenance must be carried out in conformity with current legislation, according to the manufacturer’s instructions and by qualified personnel.
• Before service or maintenance work is, carried out isolate the appliance from the mains electricity supply.
• In the event of malfunction or faulty operation, iso­late the appliance. Do not attempt to repair or carry out any other operation on the appliance directly. Contact qualified personnel only.
• Repairs or the replacement of components must be carried out exclusively by qualified personnel using original spare parts only. Failure to respect the above may compromise the safety of the appliance.
• To guarantee efficient operation, the appliance must be serviced once a year by a corgi registered engi­neer.
• The appliance may not be used for purposes other than those for which it was explicitly designed. Any other use is considered improper and therefore dan­gerous.
• Incorrect installation and use or failure to follow the instructions provided by the manufacturer absolve the manufacturer from all liability for damage.
• After unpacking, check that the contents are complete and undamaged.
• Keep the packaging out of reach of children as it is potentially hazardous.
• To clean external parts, use a damp cloth moistened with soapy water if necessary. Avoid using abrasive cleaning products and solvents.
This symbol indicates “Caution” and is placed next to all safety information. Strictly follow these instructions in order to avoid danger and damage to persons, or property.
This symbols calls attention to a note or important information, please read thor­oughly.
IMPORTANT
• Your "benchmark" Installation, Commissioning and Service Record Log Book is enclosed in the
last pages of this manual. “This record must be completed and left with the end user”.
Fer is a member of the Benchmark initiative and fully supports the aims of the programme.
Benchmark has been introduced to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency. Please see installation and servicing guidelines.
• "Fer declare that no substances harmful to health are contained in the appliance or used
during the appliance manufacture”.
Page 3
3
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
1. OPERATING INSTRUCTIONS .................................................................4
1.1 Introduction ............................................................................................................4
1.2 Control panel ..........................................................................................................5
1.3 Turning ON and OFF ..............................................................................................6
1.4 Adjustments ............................................................................................................7
1.5 Maintenance ............................................................................................................8
1.6 Faults .......................................................................................................................8
2. INSTALLATION .......................................................................................9
2.1 General Instructions ................................................................................................9
2.2 Boiler location .......................................................................................................10
2.3 Boiler water connections ......................................................................................11
2.4 Connection to the gas system ..............................................................................14
2.5 Electrical Connections ..........................................................................................14
2.6 Flue system ...........................................................................................................17
2.7 Condensate outlet connection .............................................................................23
3. SERVICE AND MAINTENANCE ............................................................25
3.1 Adjustments ..........................................................................................................25
3.2 System start-up .....................................................................................................26
3.3 Maintenance ..........................................................................................................27
3.4 Troubleshooting ....................................................................................................29
4. TECHNICAL CHARACTERISTICS AND DATA ..........................................................31
4.1 Dimensions and connections ................................................................................31
4.2 General view and main components ....................................................................32
4.3 Hydraulic diagram .................................................................................................33
4.4 Technical data table ..............................................................................................34
4.5 Wiring diagram .....................................................................................................35
BENCHMARK ...........................................................................................36
8
Page 4
FERtech 25 OV
4
Cod. 3540U431 - 11/2009 (Rev. 00)
1. OPERATING INSTRUCTIONS
1.1 Introduction
Dear Customer, Thank you for choosing FERtech 25 OV, a FER wall-mounted boiler of the latest generation, featuring
advanced design and cutting-edge technology. FERtech 25 OV is a high-efficiency condensing pre-mix appliance for heating with extremely low emis-
sions, running on natural gas or LPG. The boiler consists of an aluminium laminar heat exchanger providing effective condensation of the
water vapour contained in the flue gases, permitting extremely high efficiency. Above the heat exchanger, in the boiler, there is a ceramic surface pre-mix burner, equipped with
electronic ignition and ionization flame control, which achieves extremely low emissions while ensuring high reliability and long life operation.
The boiler is totally room sealed from the installation room: the air needed for combustion is drawn from outside. The boiler also includes a modulating speed fan, modulating gas valve, safety valve, temperature sensors, a safety thermostat and a flue gas sensor.
Thanks to the twin microprocessor control and adjustment system with advanced self-diagnosis, unit operation is for the most part automatic. The power for heating is automatically governed by the control system.
The user only has to set the temperature desired inside the home (by means of a room thermostat and or regulate the temperature of the system). The adjustment and control system will provide optimum operation throughout the year.
The display continuously provides information on the unit’s operating status and it is easily possible to obtain additional information on the sensor temperatures, set-points, etc. or configure them. Any operating problems associated with the boiler or system is immediately signalled by the display and, if possible, corrected automatically.
Page 5
5
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
1.2 Control panel
eco/comfort
reset
1
14
11
765
4
3
2
15138
12
fig. 1
1 = Domestic Hot Water temperature setpoint decreasing push button (not used) 2 = Domestic Hot Water temperature setpoint increasing push button (not used) 3 = Central Heating water temperature setpoint decreasing push button 4 = Central Heating water temperature setpoint increasing push button 5 = Display LCD 6 = Reset 7 = On-Off push button
8 = Domestic Hot Water symbol 11 = Multi-function indication 12 = Degrees indication 13 = Central Heating mode operation 14 = Central Heating symbol 15 = Burner on and actual load indication
Indication during boiler operation
Demand mode
The Boiler heat demand (generated by the Programmer, room thermostat and cylinder thermostat) is indicated by the flashing of the Hot Air symbol over the radiator (part. 13 and 14 – fig. 1). The display (part. 11 – fig. 1) indicates the actual System water temperature and, during the delay time, the text “d2”.
eco/comfort
reset
eco/comfort
reset
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
fig. 2
Page 6
FERtech 25 OV
6
Cod. 3540U431 - 11/2009 (Rev. 00)
1.3 Turning ON and OFF
Without main power supply
To avoid damage caused by freezing during long shutdowns in winter, it is advisable to drain all water from the system.
Ignition
Ensure the power is on to the appliance.
For the first 120 seconds, the display shows FH that identifies the Air purge function. During the first 5 seconds, the display shows the software version of the pcb. Open the gas cock on the boiler and purge the air from the pipework upstream of the gas valve. When the FH disappears, the boiler is ready to function automatically whenever the external controls are calling for heat.
Turning off
Press the
eco/comfort
(part. 7 - fig. 1) for 5 seconds.
•
•
•
•
eco/comfort
reset
fig. 3 - Boiler without main power supply
eco/comfort
reset
eco/comfort
reset
fig. 4 - Ignition
eco/comfort
reset
fig. 6 - Turning off
fig. 5 - Air purge
Page 7
7
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
When the boiler is turned off with this key, the p.c.b is still powered, heating operation is disabled and the display is off however the frost protection will still be active.
To totally isolate close the gas cock ahead of the boiler and disconnect electrical power.
To avoid damage caused by freezing during long shutdowns in winter, it is advisable to drain all water from the system.
To turn the boiler on again, press
eco/comfort
(part.7 - fig.1) for 5 seconds.
The boiler is ready to function automatically whenever the external controls are calling for heat.
1.4 Adjustments
Heating temperature setting
To set the system flow temperature, use the CH push buttons (Part. 3 and 4 – fig. 1). It can be varied from a minimum of 20°C to a maximum of 90°C.
Room temperature adjustment (using a room thermostat )
Using the room thermostat, set the temperature desired in the rooms. Controlled by the room ther­mostat, the boiler lights and heats the system water to the system delivery setpoint temperature. The burner shuts down when the desired temperature in the room is reached.
A room thermostat and programmer are a mandatory requirement (Building regulations Doc ‘L’
2002).
eco/comfort
reset
fig. 7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
eco/comfort
reset
fig. 8
Page 8
1.6 Faults
In the unlikely event of an operating problem, or component failure, the display flashes and a fault identification code appears.
FERtech 25 OV
8
Cod. 3540U431 - 11/2009 (Rev. 00)
1.5 Maintenance
It is strongly recommended to carry out annual maintenance of the boiler and heating system. Please refer to the “maintenance” section in this manual.
The casing, the control panel and the aesthetic parts of the boiler can be cleaned using a soft and damp cloth, do not use abrasives or solvents.
The boiler is equipped with an advanced self-diagnosis system that signals any faults on the display. Some faults (“A“ indication) cause a boiler shutdown. In this case, operation must be reset manually by pressing the
reset
(Part. 6 – fig. 1) for 1 second.
Other faults (“F“ indication) cause temporary shutdowns that are automatically reset as soon as the value causing the fault comes back within the boiler’s normal working range.
Listed below are some anomalies that can be caused by simple, user-solvable problems. If the problem remains after two attempts at resetting, contact the Fer Service Centre. For other faults, refer to section 3.4 “Troubleshooting”.
Fault Cure
No burner ignition
Make sure that the gas cocks ahead of the boiler and on the meter are open.
Press the RESET button (for 1 second). In case of repeated shutdowns, contact the Fer-
Service Department.
Before calling a Fer service engineer, check that the problem is not due to there being no gas or electricity.
Page 9
9
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
2. INSTALLATION
2.1 General Instructions
This device must only be used for the purpose for which it is specially designed. This unit is designed to heat water to a temperature below boiling point and must be connected to a heat­ing system and/or a water supply system for domestic use, compatible with its performance, characteristics and its heating capacity. Any other use is considered improper.
BOILER INSTALLATION MUST ONLY BE PERFORMED BY QUALIFIED PERSONNEL, IN ACCORDANCE WITH ALL THE INSTRUCTIONS GIVEN IN THIS TECHNICAL MANUAL, THE PROVISIONS OF CURRENT LAW, THE RECOMENDATION OF BS STANDARDS, ANY LOCAL REGULATIONS AND THE RULES OF COMPETENT WORKMANSHIP.
Incorrect installation can cause damage or physical injury for which the manufacturer declines any re­sponsibility.
This appliance must be installed strictly in accordance with these instructions and regulations:
The Gas Safety Regulations (Installations & Use). The Local Building Regulations. The Building Regulations (Part L). The Buildings Standards (Scotland - Consolidated) Regulations. British Standards Codes of Practice: B.S. 5440 Part 1 Flues B.S. 5440 Part 2 Air supply B.S. 5449 FORCED CIRCULATION HOT WATER SYSTEMS B.S. 6798 INSTALLATION OF GAS FIRED HOT WATER BOILERS B.S. 6891 GAS INSTALLATIONS B.S. 7671 IEE WIRING REGULATIONS B.S. 4814 SPECIFICATION FOR EXPANSION VESSELS B.S. 5482 INSTALLATION OF LPG B.S. 7593 TREATMENT OF WATER IN DOMESTIC HOT WATER CENTRAL HEATING SYSTEMS B.S. 5546 INSTALLATION OF HOT WATER SUPPLIES FOR DOMESTIC PURPOSES
Model Water Bye Laws B.S. 5955-8 PLASTIC PIPEWORK INSTALLATION
For Northern Ireland the rules in force apply
Page 10
FERtech 25 OV
10
Cod. 3540U431 - 11/2009 (Rev. 00)
Minimum
A
B
D
2,5 cm
20 cm
60 cm (via an openable panel)
C 30 cm
Table 1
fig. 9
A A
B
D
C
2.2 Boiler location
The unit’s combustion chamber is sealed off from the installation room and therefore requires no compartment ventilation.
The installation room must be sufficiently well ventilated to prevent any dangerous conditions from forming in the event of even slight gas leakage. This safety standard is required by the EEC Directive no. 90/396 for all gas units, including those with a so-called sealed chamber.
Therefore the place of installation must be free of dust, flammable materials or objects or corrosive gases. The room must be dry and not subject to freezing.
The boiler is designed to be installed on a solid wall. The wall fixing must ensure a stable and effective support for the appliance, using the bracket and fixings supplied.
If the unit is enclosed in a cupboard or mounted alongside, there must be space for normal maintenance work. Fig. 9 and tab. 1 give the minimum clearances to leave around the unit.
Safe Handling of Substances
Care should be taken when handling the boiler insulation panels, which can cause irritation to the skin. No asbestos, mercury or CFCs are included in any part of the boiler.
Product Handling Advice
When handling or lifting always use safe techniques - keep your back straight, bend your knees, don’t twist - move your feet, avoid bending forwards and sideways and keep the load as close to your body as possible.
Where possible transport the boiler using a sack truck or other suitable trolley. Always grip the boiler firmly, and before lifting feel where the weight is concentrated to establish the
centre of gravity, repositioning yourself as necessary.
Page 11
11
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
fig. 10
2.3 Boiler water connections
The heating capacity of the unit should be previously established by calculating the building’s heat requirement according to current regu­lations. For good operation and long life of the boiler, the plumbing system must be well proportioned and always complete with all those accessories that guarantee regular operation and running, room ther­mostat, trv’s etc. The flow and return must be a minimum diameter of 22mm for the first 3 metres from the appliance.
If the flow and return pipes follow a path where air pockets could form in certain places, it is essential to install vent valves at these points. Also, install type “A” drain cock device at the lowest points in the system to allow complete draining.
The temperature differential between the flow manifold and the return to the boiler should not exceed 20° C.
A minimum flow of 6 litres/min is required through the heat exchan­ger, calibrated on site. An automatic by-pass must be fitted to the system.
Do not use the water system pipes to earth electrical applian­ces.
Before installation, carefully flush all the pipes of the heating system to remove residues or impurities that could affect the unit’s operation (BS 7593 Building regs Doc L).
Make the connections to the appliance as shown in fig. 10.
Key
1 System flow (22 mm compression union) 3 Gas inlet (22 mm with isolation valve fitted) 5 System return - 22 mm compression union)
Make the boiler connection in such a way that its internal pipes are free of stress.
400
45
50
213
187
135
630
80 120
45 25
144
35
1 5
120
3
Page 12
FERtech 25 OV
12
Cod. 3540U431 - 11/2009 (Rev. 00)
fig. 11
Make Up Water
This appliance is designed to work on an open vented fully pumped heating system only, (see fig 12 page
13). The make up of water must be made via a suitably sized cold feed and expansion tank installed to the current regulations.
This appliance is not suitable for gravity type installations or primatic type cylinders only indirect ones should be used.
The system must be fully pumped due to the complex design of the Aluminium Laminar heat exchang­ers high efficiency design.
Attention - is drawn to the Model Water Byelaws. Fittings manufactured from duplex (alpha-beta) brass are not acceptable for underground use and certain
water undertakings will not accept their use above ground.
The connecting kits shown in fig. 4 are supplied as standard.
Key
A = Nut B = Compression olive C = Nipple F = 1/2 gas seal - Blue
Gas isolation valve
AB
F
A
22
mm
22
mm
ACBB
X2
X1
Flow
Return
Page 13
13
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
To DHW taps
min. 2 m
max.
150 mm
Isolating valve
Drain
Flow
Return
Open Vent
Motorised valve 22 mm DHW
Isolating
valve
CH Pump
Automatic By-pass
Motorised valve 22 mm CH
Balancing
valve
15 mm
22 mm
Indirect cylinder
Indirect coil missing
45°
500 mm
Open Vent
Static Head
Radiator Radiator
Schematic layout for fully pumped heating and hot water. (Close couple)
Fig. 12
Page 14
FERtech 25 OV
14
Cod. 3540U431 - 11/2009 (Rev. 00)
2.5 Electrical Connections
The unit must be installed in conformity with current national and local regulations.
Connection to the electrical Supply
The boiler must be connected to a single-phase, 230 Volt-50 Hz electric supply.
The unit’s electrical safety is only guaranteed when correctly connected to an efficient earthing system executed according to current safety standards. Have the efficiency and suitability of the earthing system checked by professionally qualified personnel. The manufacturer is not responsible for any damage caused by failure to earth the system. Also make sure that the electrical system is adequate for the maximum power absorbed by the unit, as specified on the boiler dataplate, in particular ensuring that the cross sectional area of the system’s cables is suitable for the power
absorbed by the unit. The boiler is prewired and provided with a cable and fitted with a 3 amp plug for connection to the electricity supply.
Water treatment
If treatment is used fer limited recommended only the use of Fernox or Sentinel water treatment products, which must be used in accordance with the manufactures instructions. for further information contact:
Fernox Manufacturing Co. LTD. Sentinel Performance Solutions Ltd Cookson Electronics, Forsyth Road The Heath Business & Technical Park Sheerwater, Woking, surrey, GU21 5RZ Runcorn, Cheshire WA7 4QX Tel: 0870 8700362 Tel: 01928 588331
Note - If the boiler is installed on an existing system any unsuitable additives must be removed by tho­rough cleansing. All systems should be cleansed according to B.S. 7593.
Note - In hard water areas treatment to prevent lime scale may be necessary. Note - It is important that the correct concentration of the water treatment product is maintained in
accordance with the manufacturers instructions.
2.4 Connection to the gas system
If necessary the local Gas supplier should be consulted, at the installation planning stage, in order to establish the availability of an adequate supply of gas.
An existing service pipe must not be used without prior consultation with the local Gas supplier. A gas meter can only be connected by the Local Gas supplier, or by a Local Gas suppliers Contractor. Installation pipes should be fitted in accordance with BS6891. Appliance inlet working pressure must be 20mbar MINIMUM, for NG and 37 mbar minimum for LPG.
Do not use pipes of a smaller size than the boiler inlet gas connection (22 mm).
The complete installation must be tested for gas soundness and purged as described in BS689.
All pipework must be adquately supported. An isolating gas valve is provided and should be
fitted on the boiler gas inlet. Please wait 10 minutes when lighting from cold before checking
gas rate. Gas pressures should be checked after the boiler has operated for 10 minutes to reach
thermal equilibrium. This appliance has no facility to check the burner pressure and the gas
valve is sealed and should not be adjusted. A combustion test can be carried out (see page 28
combustion analyser testing).
The isolation kit shown in Fig. 11 is supplied as standard.
Page 15
15
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
fig. 13
The user must never change the unit’s power cable. If the cable gets damaged, switch off the unit and have it changed only by professionally qualified personnel. If changing the electric power cable, use only “HAR H05 VV-F” 3x0.75 mm2 cable with a maximum outside diameter of 8 mm.
Access to the electrical terminal block
Follow the instructions given in fig. 13 to access the electrical connection terminal block. The layout of the terminals for the various connections is given in the wiring diagram in the Technical Data chapter.
Key
62 Time Clock (optional)
fig. 14
Room thermostat
Remove connections 5 - 6 if external control fitted. If using external controls the switched line can be connected into terminal 5 of the electrical block ( see fig 15 and 16 ).
Warning: the room thermo­stat works at 230V
Page 16
FERtech 25 OV
16
Cod. 3540U431 - 11/2009 (Rev. 00)
Central heating Demand
The heat demand can be controlled by the room thermostat (terminal 5-6) or by a switch line 230 V (terminal 5).
Standard Systems
For a general pipe layout and wiring diagram on the “S” and “Y” plan systems please see fig.
15a, 15b, and 16a, 16b.
Wiring diagram
4321
Junction Box
NEL
Terminal 5 - SWITCH LINE
12345678910
PROGRAMMER
DHW ON
CH ON
NEUTRAL
LIVE
CH
zone
valve
DHW
zone
valve
Room Thermostat
Cylinder Thermostat
N E L
230 Vac
BROWN BLUE
GREY ORANGE
L
6
5
Central heating
pump
N
E
L
Pre-Fitted flex
from boiler
Fig. 15b
Remove Link between terminals 5-6
OPTIMAX FERROLI
BOILER
Balancing valve
C.H. Zone Valve
Automatic
bypass
(mimimum flow of 6l/min.)
A.A.V
A.A.V
DHW zone valve
*Note: cold feed and expansion
not shown for clarity (see fig. 12)
Auto air vent
Fig. 15a
FERtech “S” Plan
Pipe layout
Page 17
17
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
fig. 16b
Wiring diagram
4321
Junction Box
NL
12345678910
PROGRAMMER
NEUTRAL
LIVE
CH ON
DHW ON
DHW OFF
BLUE
WHITE
GREY
ORANGE
Room Thermostat
Cylinder Thermostat
N E L
240 Vac
Honeywell V4073H mid position
3 WAY ZONE VALVE
2
1
C
Terminal 5 - SWITCH LINE
L
6
5
Central heating
pump
NE
L
Pre-Fitted flex
from boiler
Remove Link between terminals 5-6
2.6 Flue system
The unit is “type C” with a sealed chamber and forced draught, the air inlet and flue outlet must be connected to one of the following flue systems. With the aid of the tables and methods of calculation indi­cated, before commencing installation, it is first necessary to check that the flue system does not exceed the maximum permissible length. The current standards and local regulations must be observed.
It should be noted that only Fer flue system and accessories should be used on this appliance, as per BS 5440 2000 and C.E. test certification.
FERtech “Y” Plan
Pipe layout
Auto air vent
Automatic
bypass
(mimimum flow of 6LTR/min.)
OPTIMAX FERROLI
BOILER
Balancing valve
A.A.V
A.A.V
*Note: cold feed and expansion
not shown for clarity (see fig. 15)
fig. 16a
Page 18
FERtech 25 OV
18
Cod. 3540U431 - 11/2009 (Rev. 00)
* = between 10 e 60 mm
* = between 10 e 60 mm
80
84
95
50*
80
95
30
50*
Standard 041025G0 Flue kit
200 200
30
P
125
S
DS50*
L
30
95
84
L
DS
200 200
144
Drill the wall 10÷20 mm more than the pipe diameter
200200
144
Drill the wall 10÷20 mm more than the pipe diameter
Install level
Install level
Install level
Install level
Side view
View from above
fig. 17a
Side Outlet
fig. 17b
Front view
View from above
P = S + 129 mm
Rear Outlet
L = S + D + 185 mm
Connection with concentric flue system
The unit can be connected to a concentric air/flue duct with a Horizontal or Vertical outlet as shown on the following drawings. Numerous accessories are available on request to meet the various installation requirements. Please refer to our “flue manual” or the price list.
Standard concentric flue installation
Horizontal flue installation
1. Define the position for installing the unit.
2. If using standard flue (041025G0) this must be installed level, for non-standard flue lengths over 1mtr
a fall of 3 mm per metre should be incorporated back to the boiler.
3.
Make a hole of diameter 10 - 20 mm greater than the nominal diameter of the concentric pipe used.
4. If necessary, cut the terminal length to size, ensuring that the external pipe protrudes from the wall
by between 10 and 60 mm (fig. 17a and 17b). Remove the cutting burrs.
5. Connect the flue to the boiler, positioning the seals correctly. Seal the flue into the wall with silicone
or sand + cement and cover with wall seals provided.
Flue seals should be lubricated with a silicone type grease to prevent damage (grease not sup­plied)
Page 19
19
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
Pitch roof slate
1KWMA82U
1KWMA56U
950
50
041002X0
95050
50 950
50
max. 6 mt 60/100
max. 16 mt 80/125
Vertical Terminal
1KWMA83U
120
1000 125
10
Vertical Outlet
fig. 17c
Reduction factors for bends
1 m
0,5 m
0,5 m
0,25 m
Table 2b
Maximum permissible duct length (Horizontal)
Ø mm
60/100
5 m 15 m
Ø mm
80/125
Table 2a
Maximum permissible duct length (Vertical)
6 m 16 m
The total length in equivalent metres of the concentric flue must not exceed the maximum lengths stated in the following table, note that each bend gives rise to the stated reduction. For example, a duct = 60/100 composed of 1 bend of 90° +1 horizontal metre + 2 bends of 45° + 1 horizontal metre has a total equivalent length of 4 metres.
Vertical flueing
The installation of a concentric vertical flue can be carried out as follows, Install the appliance as previously mentioned in this manual.
1. Connect onto the flue assembly at the top of the appliance a concentric vertical adaptor part number 1KWMA71W,
2. Use the required amount of 1mtr flue extensions (part number 1KWMA56U) inserting them spigot down ensuring the seals are well lubricated with silicone grease (not supplied) and correctly located into the sockets.
3. If required 45° bends (Part number1KWMA64A) may be used with a resistance value of 0.5mtrs each, the flue should be routed in such away to avoid any unnecessary deviation and thus minimise the amount of bends required.
4. The termination should be made through our concentric flue outlet (part number 1KWMA83U) in conjunction with a roof slate pitched (part number 1KWMA82U) or flat roof (part number 1KWMA81U) The storm collar must be fixed on using the three screws provided and sealed with an external grade silicone (not supplied).
5. For longer flue lengths a 125mm concentric flue system is available.
6. All flue installations must comply with BS5440 part 1 and must only be of Fèrroli manufacture. The vertical flue must continually rise and be supported throughout its length. The flue must be inspected whilst commissioning the appliance to ensure it is sound throughout its length.
This information is for guidance purposes and Fèr­roli will in no way be held responsible for incorrect installation following this guide.
Page 20
FERtech 25 OV
20
Cod. 3540U431 - 11/2009 (Rev. 00)
Ref.
2
4
5
36
29
1
Vertical air pipe Ø80
Vertical flue pipe Ø80
80 Ø vertical flue Kit
Description
Equivalent
loss
36 m
46,4 m
12,0 m
94,4 m
Total
Table 3
fig. 19
Connection with 80 mm pipe system
The unit can be connected to a system of separate air/flue pipes for a Horizontal or Vertical outlet as shown fig 18 - 19 . Numerous accessories are available on request to meet the various installation requirements. The components used most frequently are stated in tables 4 - 5. Please refer to the flue manual or the price list for additional components.
To check you do not exceed the maximum permissible flue length, it is necessary to make a simple calculation before installation:
1. For each component, tables 4 - 5 provide an “equiva-
lent loss in linear metres”, depending on the position of installation of the component (with air intake or flue extraction, vertical or horizontal).
The loss is called “equivalent length” since it is compared
to the loss of one metre of flue (defined as equal to 1). For example, a bend at 90° of Ø80 in flue extraction has an equivalent loss of 2 linear metres, i.e. it has a loss equal to that of 2 linear metres of flue length.
2. After completely defining the layout of the system of split
flues, add up the losses in equivalent metres, depending on the installation position, of all the components and accessories in the system.
3. Check that the total calculated loss is less than or equal
to 95 equivalent metres, i.e. the maximum permissible for this model of boiler.
For complete flue options please contact fer or check our comprehensive flue manual.
4
5
1KWMA83W
1KWMA82U
1KWMA84U
2
120
120
80
80
Ø80
AIR
Ø80
FLUE
Remove the closing cap
144
041039X0
041039X0
fig. 18
Page 21
21
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
1KWMA86A
1KWMA85A
1KWMA84U
Air Flue
Vertical
Horizontal
Vertical
Horizontal
1KWMA65W
1KWMA01W
1KWMA83W  1,00 m
Description
Pipe Ø 80
male-female
Bend 45° Ø 80 mm
male - female
Bend 90° Ø 80 mm
male - female
Description
Horozontial
flue terminal
Horozontial air terminal
Vertical flue
terminal
1 1 1.6 2
1.2 1.8
1.5 2.0
Equivalent losses in
metres (linear)
5
2
Air Flue
Vertical
Horizontal
Vertical
Horizontal
Equivalent losses in
metres (linear)
12
Accessories Ø 80 Accessories Ø 80
Table 4 Table 5
The stated loss values refer to genuine Fer flue accessories.
Terminal Position
P
D, E
Q
Q
l
B
C
A
G
F
L
J
H
H
K
N
N
MM
Q
fig. 20
Table of Ø80 flue and accessory
Page 22
FERtech 25 OV
22
Cod. 3540U431 - 11/2009 (Rev. 00)
Minimum Dimensions of Flue Terminal Positions
Directly below an opening, air brick, opening windows, etc.
Above an opening, air brick,
opening windows, etc.
Horizontally to an opening, air brick,
opening windows, etc.
Below gutters, soil pipes or drain pipes
Below balconies or car port roof
Below eaves
From a vertical drain pipe or soil pipe
From an internal or external corner
From a surface facing the terminal
From a terminal facing the terminal
From the wall on which the terminal is mounted
From a vertical structure on the roof
Above intersection with roof
Horizontally from a terminal on the same wall
Vertically from a terminal on the same wall
From an opening in the car port (e.g. door, window) into the dwelling
Above ground roof or balcony level
300mm
300mm
300mm
200mm
75mm
200mm
150mm
100mm
300mm
600mm
300mm
300mm
150mm
1200mm
1200mm
1500mm
N/A
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
NOTE
N/A = Not applicable
In addition, the terminal should not be nearer than 150mm (fanned draught) to an opening in the building fabric formed for the purpose of accommodating a built-in element such as a window frame. A terminal guard must be used if the terminal is less than 2 metre's from the ground.
Condensing Terminal Positions: If the flue is to be terminated at low level, then the potential effect of the plume must be considered.
The plume should not be directed:
across a frequently used access route
across a neighbouring property
towards a window or door
Page 23
23
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
Connection to collective flues or single flues with natural draught
If you are then going to connect the FERtech 25 OV boiler to a collective flue or a single flue with natural draught, the flue must be expressly designed by professionally qualified technical personnel in conformity with the standards and rules in force.
In particular, flues must have the following characteristics:
• Be sized according to the method of calculation stated in the standard
• Be airtight to the products of combustion, resistant to the fumes and heat and waterproof for the condensate
• Have a circular or square cross-section (some hydraulically equivalent sections are permissible), with a vertical progression and with no constrictions
• Have the flue conveying the hot fumes adequately distanced or isolated from combustible mate­rials
• Be connected to just one unit per floor, for at most 6 units in all (8 if there is a compensation duct or opening)
• Have no mechanical suction devices in the main ducts
• Be at a lower pressure, all along their length, under conditions of stationary operation
• Have at their base a collection chamber for solid materials or condensation of at least 0.5 m, equipped with a metal door with an airtight closure.
2.7 Condensate outlet connection
The boiler is equipped with an internal air-trap to drain off the condensate. Fit the inspection coupling A and the hose B, pushing it on for approximately 3 cm and securing it with a clamp.
Fill the air-trap with approximately 0.5 ltrs of water and connect the hose to the waste system, or soakaway.
fig. 21
0,5 lt.
Page 24
FERtech 25 OV
24
Cod. 3540U431 - 11/2009 (Rev. 00)
External
32/40mm Solvent weld pipework
Cement seal
100mm Dia tube
Bottom sealed
Lime stone chippings
Ground level (either/Or)
Hole depth 400mm
25mm
2 Rows of 3x12 mm Holes
Internal
-300mm
fig. 22
Condensate discharge
Where possible the condensate should discharge into an internal soil pipe or waste system. The minimum pipe diameter required is 22 mm, a trap has already been fitted to the appliance with a flexible tail to facilitate the connection to the condensate discharge pipe.
The pipe should be a solvent weld plastic, not copper, as the condensate has a ph value of 4 (slightly acidic).
Where it is not possible to terminate internally, the condensate discharge pipe may be run outside (see below drawing).
Any external run is subject to freezing, in severe weather conditions. To avoid this the pipework should be installed to dispose of the condensate quickly, with as much as possible run internally, before passing through the wall.
Pipework external to the building should be increased in diameter to 32 or 40 mm solvent weld. It should be run to a external drain or soakaway, with a maximum length of 3 metres.
When a soakaway (condensate absorption point) is used, it should be constructed as shown below, or use a specifically designed unit, for example Mc Alpine SOAK1GR available from most plumbing and heating stockists.
Page 25
25
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
fig. 23
3. SERVICE AND MAINTENANCE
3.1 Adjustments
All adjustment and conversion operations must be carried out by Qualified Personnel such as fer Tech­nical Service.
FER declines any responsibility for damage or physical injury caused by unqualified and unauthorized persons tampering with the device.
Gas supply conversion
The unit can function with either Natural Gas or LPG (commercial propane)and is factory-set for use with one of the two gases, as clearly shown on the packing and on the unit’s dataplate. Whenever a different gas to that for which the unit is preset has to be used, a conversion kit will be required, proceeding as follows:
1 Remove the casing. 2 Open the sealed chamber. 3 Release the fixing clip C and remove the gas pipeA from the fan - venturi assembly. 4 Replace the nozzle B inserted in the gas pipe with that contained in the conversion kit. 5 Reassemble the gas pipe A with the clip and check the seal of the connection. 6 Apply the plate contained in the conversion kit, near the dataplate. 7 Refit the sealed chamber and casing. 8 Adjust the parameter for the specific type of gas to be used:
- Turn the boiler onto standby
- Press the DHW buttons (part. 1, 2 - fig. 1) for 10 seconds: the display will show “P01”
blinking
- Press the DHW buttons (part. 1, 2 - fig. 1) to set parameter 00 (for natural gas operation)
or 01 (for LPG operation)
- Press the DHW buttons (part. 1, 2 - fig. 1) for 10 seconds
- The boiler will go back onto standby
9 Check working pressure. 10 Check CO2mixture as detailed (page 28 combustion analyser testing).
Page 26
FERtech 25 OV
26
Cod. 3540U431 - 11/2009 (Rev. 00)
3.2 System start-up
Commissioning must be performed by Qualified Personnel. Checks to be made at first ignition, and after all maintenance operations that involved discon­necting from the systems or an intervention of a safety device.
Before lighting the boiler:
• Open any isolation valves between the boiler and the system.
• Check the tightness of the gas system, proceeding with caution and use gas leak detection fluid to detect any leaks in connections.
• Check the pre-filling of the expansion tank (ref. sec.4.4)
• Fill the water system and make sure that all air contained in the boiler and the system has been vented by opening the air vent valve on the boiler and any vent valves on the system.
• Make sure there are no water leaks in the system, hot water circuits, connections or boiler.
• Make sure the electrical system is properly connected.
• Make sure that the unit is connected to a good earthing system.
• Make sure there are no flammable liquids or materials in the immediate vicinity of the boiler.
• Vent and spin the pump.
• Ensure the flue system is correctly fitted, including terminal locations.
Ignition
• Open the gas valve upstream of the boiler.
• Purge the air from the installation pipework to the appliance.
• Switch on the boiler electrical supply.
• Press the
eco/comfort
key on the boiler for 5 seconds (part. 7 - fig. 1).
• The boiler is now ready to function automatically whenever the external controls call for a demand.
In case of an electrical power failure while the boiler is working, the burner will go out. When power returns, the boiler will run the self-test cycle again, after which the burner will automatically re-ignite (if there is still demand for heat).
Checks during operation
• Check the tightness of the gas circuit and water systems.
• Check the efficiency of the flue and air-flue ducts while the boiler is working.
• Check that the water is circulating properly between the boiler and the system.
• Make sure that the gas valve modulates correctly.
• Check the proper ignition of the boiler by performing various tests, turning it on and off with the room thermostat or remote control.
• Make sure that the fuel consumption indicated on the meter corresponds to that given in the technical data table in section 4.4 page 33
Turning off
Press the
eco/comfort
key for 5 seconds (
part. 7 - fig. 1
).
Page 27
27
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
3.3 Maintenance
The following operations are strictly reserved for Qualified Personnel, such as corgi registered engineers or Fer engineers.
Seasonal inspection of the boiler and flue
It is advisable to carry out the following checks at least once a year:
• The control and safety devices (gas valve, flow meter, thermostats, etc.) must function correctly.
• The flue terminal end piece and ducts must be free of obstructions and leaks.
• The gas and water systems must be sound.
• The burner and exchanger must be clean.
• The electrodes must be free of scale and correctly positioned.
• The system pressure when cold must be approx 1 bar; otherwise, bring it to that value.
• The expansion vessel must be filled to 1 bar cold with zero system pressure.
• The gas flow and pressure must correspond to that given in table 10 section 4.4 page 33.
• The circulating pump must be vented and free of debris.
• The returned filter cleaned.
• The condensate trap inspection bowl should be cleaned and free of debris.
Page 28
FERtech 25 OV
28
Cod. 3540U431 - 11/2009 (Rev. 00)
fig. 24
fig. 25
Opening the casing
To open the boiler casing, you need to follow the sequence given below and the instructions of fig. 24.
1 Using a screwdriver, fully unscrew and remove the 2 screws “A ” 2 Open by lowering the panel “B ” 3 Lift and take off the casing “C ”
Cleaning the boiler and burner
The body and burner must not be cleaned with chemical products or wire brushes. Special care must be taken over all the sealing systems pertaining to the sealed chamber (gaskets, cable clamps, etc.). In addition, it is necessary to pay attention after performing all these operations to check and carry out all the phases of ignition and thermostat operation, the gas valve and circulation pump.
After these checks, make sure there are no gas leaks.
Combustion analysis
It is possible to analyse the combustion through the air and flue sampling points shown in fig. 25.
To make the measurement, it is neces­sary to:
1) Open the flue sampling point
2) Insert the probe;
3) Press CH button (part. 3, 4 - fig. 1) for
5 seconds to turn on TEST mode;
4) Wait 10 minutes for the boiler to sta­bilize
5) Take the measurement.
NAT GAS; CO2 reading should be 8.7 to 9.0% L.P.G; CO2 reading should be 9.5 to 10%
Readings taken with an unstabilized boiler will cause measurement errors.
B
A
C
A
Air
Flue gas
Air Flue gas
Page 29
29
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
3.4 Troubleshooting
Fault Diagnosis
In the event of operating problems or trouble, the display will flash and a fault identification code appears.
There are faults that in order to restore operation the RESET button must be pressed (ref.6 - fig. 1); or if the boiler fails to start, it will be necessary to repair the fault (code nos. F1 to F24). Other faults cause temporary shutdowns that are automatically reset as soon as the value comes back within the boiler’s normal working range (codes from 25 to 47).
When the boiler starts functioning normally again, the display stops flashing and the fault code disap­pears.
Fault Possible cause Cure
A01
No burner ignition
No gas
Check the regular gas fl ow to the boiler and the air has been purged from the pipes.
Detection or ignition electrode fault
Check that the electrodes are correctly positioned and free of any deposits
Defective gas valve Check and change the gas valve
Incorrect inlet gas pressure Check inlet gas pressure
Siphon obstructed Check and if necessary change the siphon
A02
Flame detected with the burner off
Ionisation electrode defective Check the ionizing electrode wiring
Main board defective Check the PCB
A03
High limit protection
Flow sensor not active or correctly located
Check the correct positioning and operation of the fl ow sensor
No system circulation
Check the pump and radiator valves present in the system and automatic by-pass
A04
Flue gas fault
Fault F07 happened 3 times in the last 24 hours
Check the fl ue
A05
Fan problem
Tachometer signal interruped for 1 hour
Check the wiring and the fan
A06
No fl ame after the ignition phase (6 times in 4 min.)
Detection electrode fault
Check that the electrode is correct positioned and if necessary change it
Flame instable Check the burner
Incorrect valve gas Offset Check Offset at the minimum power
Flue gas circuit obstructed Check if fl ue gas circuit is free
Siphon obstructed Check and if necessary change the siphon
A41
Flow sensor disconnected Sensor disconnected
Check the correct position and operation of the fl ow sensor
F07
Flue gas fault
The exhaust gases temperature becomes higher than 95°C for 2 minutes longer.
Check the fl ue
F10
Flow sensor fault
Sensor damaged or short circuited Check the wiring or change the sensor
Sensor damaged or wiring broken Check the wiring or change the sensor
F11
Return sensor fault
Sensor damaged or wiring shorted Check the wiring or change the sensor
Sensor damaged or wiring broken Check the wiring or change the sensor
Page 30
FERtech 25 OV
30
Cod. 3540U431 - 11/2009 (Rev. 00)
Fault Possible cause Cure
F13
Flue sensor fault
Sensor damaged or wiring shorted Check the wiring or change the sensor
Sensor damaged or wiring broken
Check the wiring or change the sensor
F14
Flow sensor fault
Sensor damaged or short circuited Check the wiring or change the sensor
Sensor damaged or wiring broken Check the wiring or change the sensor
F15
Fan problem
Tachometer signal interrupted, fan connection
Check the wiring and fan
Fan damaged, debris in fan Check the fan, clean debris
F34
Supply voltage under 180V. Electric mains fault Check the electrical system
F35
Irregular mains frequency Electric mains fault Check the electrical system
F42
Flow sensor fault Sensor damaged Change the sensor
Page 31
31
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
4. TECHNICAL CHARACTERISTICS AND DATA
4.1 Dimensions and connections
Key
1 System flow (22 mm compression union) 3 Gas inlet (22 mm with isolation valve fitted) 5 System return - 22 mm compression union
fig. 26
80 120
45 25
144
35
1 5
120 80
280
400
45
50
213
187
135
3
630
Page 32
FERtech 25 OV
32
Cod. 3540U431 - 11/2009 (Rev. 00)
4.2 General view and main components
fig. 27
5 Room sealed compartment 7 Gas inlet 10 CH flow 11 CH return 16 Premix fan assembly 19 Combustion compartment 22 Main burner 29 Flue Collar 44 Gas valve
201
191 29
22
81 82
161
154
196
19
278
5
16
186
44 7
193
10
11
81 Ignition electrode 82 Ionisation electrode 154 Condensate outlet pipe 161 Heat exchanger 186 Return sensor 191 Flue gas temperature sensor 196 Condensate collector 201 Fan Venturi 278 Double sensor (Safety + Heating)
Page 33
33
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
4.3 Hydraulic diagram
fig. 28
Key
7 Gas inlet 10 CH flow 11 CH return 16 Premix fan assembly 44 Gas valve
154 Condensate outlet pipe
161 Heat exchanger 186 Return sensor 193 Siphon 278 Double sensor (Safety + Heating)
10
7
186
161
278
154
16
11
193
44
Drain off valve
Page 34
FERtech 25 OV
34
Cod. 3540U431 - 11/2009 (Rev. 00)
4.4 Technical data table
Maximum working temperature in heating °C Total boiler water content litres
Weight empty kg
Max electrical power absorbed
W
85
1.5
27
50
Max. CH Heat input
Max. natural Gas flow rate (G20)
Natural Gas supply pressure (G20)
Max. LPG flow rate (G31)
LPG supply pressure (G31)
kW 26.6
5.7
m
3
/h
20
mbar
2.67
0.56
kg/h
37
mbar
1.97
0.41
Max. useful heat output 80° C - 60° C
Max. useful heat output 50° C - 30° C
Max. CO2 (G20 - Natural Gas) %
Max. CO2 (G31 - Propane) %
Max. flue gas temperature 80°C - 60°C °C
Max. flue gas temperature 50°C - 30°C °C
Max. flue gas flow rate kg/h
kW 25.2
5.3
kW 24.6
5.2
NOx emission class
5
Energy marking (92/42 EEC directive)
Table 10
Gas Injector (G20 - Natural Gas)
Gas Injector (G31 - Propane)
Electrical protection rating IP Power voltage/frequency
V/Hz
X5D
230/50
%
%
%
98.3
97.3
105.4
107.2
109.1
Max. working pressure in heating bar
3
0.3
Type of unit
C13-C23-C33-C43-C53
C63-C83-B23-B33
PIN CE
0063 BR 3161
kW
kW
kW
%
%
m
3
/h
kg/h
°C
°C
kg/h
bar
Min. CH Heat input
Min. useful heat output 80° C - 60° C
Min. useful heat output 50° C - 30° C
Min. natural Gas flow rate (G20)
Min. LPG flow rate (G31)
Unit Value
Min. flue gas temperature 80°C - 60°C
Min. flue gas temperature 50°C - 30°C
Min. flue gas flow rate
Min. working pressure in heating
Efficiency Pmax 80° C - 60° C Efficiency Pmin 80° C - 60° C Efficiency Pmax 50° C - 30° C
Efficiency Pmin 50° C - 30° C
Efficiency 30%
6.20
4.7
9.2
42.4
10
Min. CO2 (G20 - Natural Gas) %
9
8.5
Min. CO2 (G31 - Propane)
%
9.5
64 60
46 31
Heating expansion pressure tank capacity Heating expansion pressure prefilling pressure
litres
bar
8 1
Page 35
35
FERtech 25 OV
Cod. 3540U431 - 11/2009 (Rev. 00)
Key
16 Fan 44 Combination gas valve 62 Time clock (optional) 81 Spark Electrode 82 Ionisation electrode 101 Main p.c.b. 103 Relay 104 Fuse F3.15 amp
186 Return temperature sensor 191 Exhaust temperature sensor 202 Transformer 230V-24V 203 Supply lead 278 Double sensor (Safety + Heating)
fig. 29
4.5 Wiring diagram
Page 36
BENCHMARK
CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxes
TIME & TEMPERATURE CONTROL TO HEATING ROOM T/STAT & PROGRAMMER/TIMER PROGRAMMABLE ROOMSTAT
TIME & TEMPERATURE CONTROL TO HOT WATER CYLINDER T/STAT & PROGRAMMER/TIMER
COMBI BOILER
HEATING ZONE VALVES FITTED NOT REQUIRED
HOT WATER ZONE VALVES FITTED NOT REQUIRED
THERMOSTATIC RADIATOR VALVES FITTED
AUTOMATIC BYPASS TO SYSTEM FITTED NOT REQUIRED
FOR ALL BOILERS CONFIRM THE FOLLOWING
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURER’S INSTRUCTIONS?
THE SYSTEM CLEANER USED
THE INHIBITOR USED
FOR THE CENTRAL HEATING MODE, MEASURE & RECORD
GAS RATE ft3/hr
BURNER OPERATING PRESSURE (IF APPLICABLE) mbar
CENTRAL HEATING FLOW TEMPERATURE °C
CENTRAL HEATING RETURN TEMPERATURE °C
FOR COMBINATION BOILERS ONLY
HAS A WATER SCALE REDUCER BEEN FITTED? YES NO
WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED?
FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD
GAS RATE ft3/hr
MAXIMUM BURNER OPERATING PRESSURE (IF APPLICABLE) mbar
COLD WATER INLET TEMPERA
TURE °C
HOT WATER OUTLET TEMPERATURE °C
WATER FLOW RATE
lts/min
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS? YES
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING
THE HEATING AND HOT WATER SYSTEM COMPLIES WITH CURRENT BUILDING REGULATIONS
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMMISSIONED IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS
IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDED A CO/CO2 RATIO READING? N/A YES CO/CO2 RATIO
THE OPERATION OF THE APPLIANCE AND SYSTEM CONTROLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER
THE MANUFACTURER’S LITERATURE HAS BEEN LEFT WITH THE CUSTOMER
m3/hr
m
3
/hr
COMMISSIONING ENG’S NAME PRINT CORGI ID No.
SIGN DATE
BOILER SERIAL No. NOTIFICATION No.
BENCHMARK No.
GAS BOILER COMMISSIONING CHECKLIST
COLLECTIVE MARK
N/A
N/A
267
Please add the first 4 digits of the Boiler serial No to complete the BENCHMARK No.
Page 37
SERVICE INTERVAL RECORD
It is recommended that your heating system is serviced regularly
and that you complete the appropriate Service Interval Record Below.
Service Provider. Before completing the appropriate Service Interval Record below, please ensure you have carried out the service
as described in the boiler manufacturer’s instructions. Always use the manufacturer’s specified spare part when replacing all controls
SERVICE 1
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 2
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 3
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 4
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 5
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 6
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 7
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 8
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 9
DA
TE
ENGINEER NAME
COMP
ANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
SERVICE 10
DATE
ENGINEER NAME
COMPANY NAME
TEL No.
CORGI ID CARD SERIAL No.
COMMENTS
SIGNATURE
FERROLI TECHNICAL HELPLINE - 08707 282 885
Page 38
Page 39
Page 40
Phone numbers:
Installer
Service Engineer
BECAUSE OF OUR CONSTANT ENDEAVOUR FOR IMPROVEMENT DETAILS MAY VARY SLIGHTLY FROM THOSE QUOTED IN THESE INSTRUCTIONS.
ALL SPECIFICATIONS SUBJECT TO CHANGE
Please note - to avoid incurring unnecessary expense, in the event of a boiler shut down, check
this is not caused by lack of electricity supply, gas supply or low water pressure before calling our
Customer Service Helpline.
Lichfield Road, Branston Industrial Estate, Burton Upon Trent, Staffordshire DE14 3HD
Should you require any assistance during the installation
call our Technical Service Helpline on
0871 559 2927
Should you require a service engineer to visit
call our service centre on
0871 559 2924
Loading...