Feiss VS10706 User Manual

STANDARD SHADE INSTALLATION INSTRUCTIONS:
IMPORTANT: TURN OFF POWER AT MAIN FUSE OR CIRCUIT BREAKER BOX BEFORE STARTING INSTALLATION
IMPORTANTE: CORTE LA ALIMENTACIÓN ELÉCTRICA, CERRANDO EL INTERRUPTOR CENTRAL O QUITANDO EL FUSIBLE DEL PANEL CENTRAL ANTES DE COMENZAR EL ENSAMBLE.
IMPORTANT: COUPER L’ALIMENTATION ÉLECTRIQUE AU BOÎTIER CENTRAL (DISJONCTEUR OU FUSIBLES), AVANT DE COMMENCER L’INSTALLATION
ENGLISH Bulb (not included) Bombilla (no incluida) Ampoule (Non incluse)
Shade Pantalla Abat-jour
Counter Ring Anillo de Seguridad Anneau de Fixation
Socket Casquillo Douille
1. Through bottom opening of shade, install counter ring over shade washer onto threaded socket until shade is secure. Through top opening of shade, install light bulb (not included). See relamping label at socket area for bulb type and maximum allowed wattage.
ESPAÑOL
1.
FRANÇAIS
1. Introduisez douille à travers l'ouverture inférieure de l'abat-jour et placez la rondelle de l'abat-jour par-dessus douille; insérez l'anneau de sécurité par-dessus douille et la rondelle de l'abat-jour, jusqu'à ce que l'abat-jour soit bien solide. Introduisez les ampoules à travers l'ouverture supérieure de l'abat-jour. (Ampoules non incluses) Consultez l'étiquette de remplacement d'ampoule, située près de douille, pour connaître le type d'ampoule et le wattage maximum permis.
Before continuing with below steps, first follow enclosed installation instructions for electrical and fixture installation onto outlet box.
Antes de continuar con debajo pasos, siga primero el instrucciones de instalación incluida para la instalación eléctrica y de la lampara sobre la caja de salida eléctrica.
Avant de continuer au-dessous des étapes, suivez d'abord les instructions d'installation incluses pour l'installation électrique et de montage sur la boîte de sortie électrique.
#2031 (E,S,F) 10/29/03
Fitter Recubrimiento Recouvrement
Socket Casquillo Douille
Shade Pantalla Abat-jour
Counter Ring Anillo de Seguridad Anneau de Fixation
Bulb (not included) Bombilla (no incluida) Ampoule (Non incluse)
Fitter Recubrimiento Recouvrement
Thumb Screw Tornillo Manual Vis Manuel
Socket Casquillo Douille
Shade Pantalla Abat-jour
ENGLISH
1. Remove counter rings from threaded sockets.
2. Install shade onto fitters by fastening counter ring back onto threaded sockets.
3. Install bulbs (not included). See relamping label at socket area for type and maximum allowed
wattage.
ESPAÑOL
1.
Quite el anillo de seguridad de los casquillos.
2.
Instale la pantalla en el casquillo atornillando los anillos de seguridad sobre los casquillos enroscados.
3.
Instale la bombilla (no incluida). Lea la etiqueta de reemplazo para las bombillas que se encuentra cerca del casquillo, para saber el tipo y la cantidad máxima permisible de vatios.
FRANÇAIS
1.
Retirez l'anneau de fixation des douilles.
2.
Installez les abat-jour sur les adaptateurs, en vissant les anneaux de sécurité sur les douilles filetées.
3.
Installez les ampoules (non incluses). Consultez l'étiquette de remplacement d'ampoule, située près de douille, pour connaître le type d'ampoule et le wattage maximum permis.
ENGLISH
1. Install glass shade onto fitter by locking with thumb screws.
2. Install bulbs (not included). See relamping label at socket area for type and maximum allowed wattage.
ESPAÑOL
1. Instale la pantalla sobre el recubrimiento con los tornillos manuales.
2.
Instale la bombilla (no incluida). Lea la etiqueta de reemplazo para las bombillas que se encuentra cerca del casquillo, para saber el tipo y la cantidad máxima permisible de vatios.
FRANÇAIS
1. Installez l'abat-jour sur le recouvrement, á l'aide des vis a serrage manuel.
2.
Installez les ampoules (non incluses). Consultez l'étiquette de remplacement d'ampoule, située près de douille, pour connaître le type d'ampoule et le wattage maximum permis.
Bulb (not included) Bombilla (no incluida) Ampoule (Non incluse)
©MURRAY FEISS IMPORT CORP.
MURRAY FEISS
STANDARD CHAIN SUSPENDED FIXTURE INSTALLATION INSTRUCTIONS #2000:
(E) 05/21/03
CEILING JUNCTION BOX
SUPPLY WIRES
FIXTURE WIRES
KNOT
MOUNTING BAR
ADJUSTABLE CHAIN LINK
LOCKING TUBE
CANOPY
COLLAR RING
CHAIN
ADJUSTABLE CHAIN LINK
FIXTURE LOOP
3/4"
1/2"
SUPPLY GROUND WIRE
FIXTURE GROUND WIRE
MACHINE SCREWS (NOT SUPPLIED)
HEX NUTS
THREADED PIPE
SCREW COLLAR
IMPORTANT: TURN OFF POWER AT MAIN FUSE OR CIRCUIT
BREAKER BOX BEFORE STARTING INSTALLATION.
1. Attach mounting bar securely to ceiling junction box with two machine screws (supplied with junction box) through slot at each end of mounting bar. Note: mounting bar should be installed with "GND" imprint and/or two dimples facing down.
2. Fasten one hex nut about 3/4" down from one end of threaded pipe. Then screw same end of threaded pipe into center hole in mounting bar. At this point test install the canopy onto ceiling through this threaded pipe and make certain 3/8" of pipe protrude below the canopy. If not, then adjust the threaded pipe location by screwing up or down accordingly. Once correct threaded pipe location has been adjusted, remove canopy and tighten hex nut against mounting bar. Make certain not to spin threaded pipe during tightening.
3. Fasten another hex nut onto bottom end of threaded pipe. Bring up 1/2" from bottom end of pipe to bottom side of hex nut. Then fasten screw collar into same end of pipe and lock into position by tightening hex nut.
4. Take one adjustable chain link, twist open the locking tube, and then hook onto fixture loop and onto one end of chain. Close back the locking tube.
5. At this point decide how much chain to use, including one additional adjustable chain link at top end, so the fixture hangs at desired height. Spread open the chain link you have decided to remove and discard unused links.
6. Slide collar ring and then canopy down the chain.
7. Take another adjustable chain link, twist open the locking tube, and then hook onto top end of chain. Then grabbing onto chain firmly lift fixture and hook the same adjustable chain link onto screw collar which has been mounted onto ceiling. Close back the locking tube of adjustable chain link.
8. Take the fixture ground wire (without plastic insulation) and weave up through the chain links, and then through screw collar and threaded pipe. Repeat with fixture wires (with plastic insulation).
9. Cut any excess fixture wires and ground wire leaving only about 8" length from top end of threaded pipe. Take fixture wires and tie a knot above threaded pipe. Then split fixture wires and strip off 3/4" of plastic insulation from each end.
10. Fixture wires connection:
  Connect fixture wires to supply wires per
below chart. Wire connectors not included; and use electrical tape to secure wire connector and wires together.
Connect Clear, Brown,
Gold or Black *Parallel
Wire without tracer
(round & smooth) or Black
Fixture Wire to:
Black or Red Supply Wire or
Insulated Wire (other than
green) with copper
conductor
* Fixtures normally use parallel wires (SPT 1 & SPT 2), of which the tracer wire is shaped square or ridged and the without tracer wire is shaped round or smooth.
Connect Clear, Brown,
Gold or Black *Parallel
Wire with tracer (square &
ridged) or White Fixture
White Supply Wire or
Insulated Wire (other than
green) with silver conductor
Copper
Silver
  Note: Make certain no loose conductors
protrude outside of wire connectors. And make certain all wires are securely held together by wire connectors.
11. Ground wire connection:
  Connect fixture ground wire to supply
ground wire (usually with green insulation) with wire connector.
  Note: If there is no supply ground wire
at ceiling juction box then attach fixture ground wire securely onto green grounding screw located at mounting bar.
  Important: Never connect ground
wire to black or white supply wires.
12. Once all wires are connected, tuck them carefully into junction box. Then raise canopy against the ceiling and lock into position by screwing collar ring onto screw collar.
Wire to:
Smooth
Ridged
MURRAY FEISS
Loading...