Feiss P1161 User Manual

Assembly Instructions For
Swivel
P1161
(E) 11/08
2
8"
Plastic Bag
Canopy (Fixture Plate)
Stem
1
14"
20"
26"
32"
38"
44"
50"
Fixture Wires
Fixture
Socket
Shade
3
Counter Ring
Bulb
4
(not included)
TURN OFF THE POWER AT THE MAIN FUSE OR
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before assembly. Bulb not
included.
1. Install stems: A. Choose desired installation height from dimensions shown in
B. Install bottom end of stem assembly by screwing into top of
fixture.
C. Thread fixture wires through canopy, plastic ring and then
swivel. Allow canopy to carefully slide down without scraping the surface of stems. Then install swivel by screwing onto top end of stem assembly.
2. Follow enclosed supplement installation instructions for electrical and fixture installation onto house outlet box. If you do not have an outlet box at desired location to attach the fixture than hire a qualified electrician to create one.
3. Install glass shade onto fitters by fastening counter ring onto threaded sockets.
4. Install bulb (not included). See relamping label located near socket area for type and maximum allowed wattage.
IMPORTANT
CIRCUIT BREAKER BOX
Loading...