Feiss F1923-3 User Manual

Page 1
ASSEMB LY I NST R U C T I ONS FOR F1923/3
Mounting screw
Mounting plate
Fixture plate
Ball Cap Nut
Swivel
Fixture wire and Ground Wire
Fixture Coupler
Stem
(E) 10/04
27"
39"
51"
63"
Socket
Glass Shade
Counter Ring
Bulb (not included)
©M U R R AY FE I SS I MP OR T LL C .
75"
IMPORTANT TURN OFF THE POWER AT THE MAIN FUSE
     OR CIRCUIT BREAKER BOX BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before assembly. Bulbs are not included.
1. Remove counter rings from sockets.
3. Install bulbs (Not included). See relamping label located at socket area for type and maximum
allowed wattage.
STEM HUNG INSTALLATION:
A. Choose desired installation height from dimensions shown in above diagram. Thread fixture wire
through each stem to be used. Please note correct position of stems from left diagram. Screw all stems together until secure. Screw bottom stem into fixture coupler until secure.
B. Measure 6" of wire from end of canopy and cut off remaining wire. Split wires and strip off 3/4"
of insulation from each end.
C. Follow enclosed ”Fixture installation instructions” for electrical and fixture installation onto ceiling outlet box.
MUR R AY FEI SS
Loading...