FEI 32-2400 Assembly Manual

Page 1
Sensory Ball Pit Assembly Guide
(32-2400)
v03/17
• Gives children visual and tactile feedback
• Provides the buoyancy of water without the mess
• Expandable, portable, and safe
• Made with foam padding and a reinforced vinyl cover
• Design allows for shape flexibility
• Weighs 167lbs
Fabrication Enterprises Inc PO Box 1500 White Plains, NY 10602 (USA) tel: +1-914-345-9300 • 800-431-2830 fax: +1-914-345-9800 • 800-634-5370 FabEnt.com
Authorized CE representative: RMS UK Ltd. 28 Trinity Road Nailsea, Somerset BS48 4NU (UK)
EC
REP
32-2400
Page 2
Assembly Instructions
Before you begin:
• Read through this instruction manual carefully
• Make sure you have all the assembly pieces (listed below)
• Make sure there are no tears in the vinyl
• Make sure you are assembling the ball pit on a flat surface
4 vinyl-covered panels 4 pieces of connecting string 2,500 large balls (4” diameter)
Assembly Pieces
FABRICATION ENTERPRISES INC PO Box 1500, White Plains, NY 10602 (USA) tel: +1-914-345-9300 fax: +1-914-345-9800 FabEnt.com
3/17
Page 3
Step 1 Step 2 Step 3 Step 4
Lay the panels on the floor flap side down
as pictured.
Lay the corners in a square so they form
a square and create the bottom of the pit.
Pull the flaps to the center of the square.
Stand the panels up. Making sure the flap
is tucked under the panel.
Make sure the panels meet as pictured
above.
Step 5 Step 6 Step 7 Step 8
Begin tying the panels together with
connecting string. Loop the string
between the two bottom grommet holes.
Take the string on the right and loop it
through the second grommet hole.
Pull the string through the grommet hole
directly across from the second hole.
Repeat with on the left side. The first and
second grommets should look like the
photo above.
Assembly Instructions
FABRICATION ENTERPRISES INC PO Box 1500, White Plains, NY 10602 (USA) tel: +1-914-345-9300 fax: +1-914-345-9800 FabEnt.com
3/17
Page 4
Step 9 Step 10 Step 12
Repeat this ladder pattern all the way to the top. Pull the string tight each time to
ensure a secure hold.
Secure the string at the top by tightly knotting the strings together as shown. Repeat this process with the other panels
until the pit can stand on its own.
Step 13
Fill the ball pit with balls and enjoy.
Assembly Instructions
FABRICATION ENTERPRISES INC PO Box 1500, White Plains, NY 10602 (USA) tel: +1-914-345-9300 fax: +1-914-345-9800 FabEnt.com
3/17
Caution:
Make sure walls of ball pit are secure before use. Check for tears or loose string prior to each use.
Loading...