AAP 100 MD
MD Floor Box AAP Bracket Installation Kit
68-720-01 Rev. B
11 08
Installation
3. Remove Screws
4. Slide
Introduction
This guide covers installation of the Extron MD Floor Box AAP
Bracket Kit in a Matsushita Denko (MD) floor box. It shows
removal of the old bracket and installation of the new
bracket/AAP unit.
Installation
C
1. Turn off and disconnect power from all
2. Remove all cables connected
3. Open the lid and remove
4. Remove the lid from
Installation and service must be performed by
authorized personnel only.
equipment connected to the floor box.
to the portion of the
floor box accessible
when the lid is open (if
applicable).
the two screws securing
the lid to the floor box.
the floor box by
sliding the lid
toward the hinge to
disengage it from the
box, then put the lid aside.
MD Floor Box AAP Kit • Installation
2
N
5. Remove the two screws securing the old adapter plate
6. Slide the adapter plate bracket to the center of the box
7. Remove the old adapter plate bracket and adapter plate
If there is no adapter plate or blank plate installed, skip to
step 8.
bracket to the box.
and disconnect the cables attached to the back side of the
adapter plate.
unit from the floor box.