WARNING READ INSTRUCTIONS CAREFULLY BEFORE USE
6m x 12m CREST INSTRUCTIONS
Recommended procedure below. For safety reasons it is recommended that four persons set up any marquee.
Ensure area is free from any sharp objects & overhead objects.
This is a feature image and not specific to the order.

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

No. Item No. Item
A001 Girder A013B Inner Connector of Fabric Controlling Bar B
A002 Left & Right Pole A014 Round Fabric Controlling Bar of Sidewall
A003 Tie-in A015 Round Fabric Controlling Bar of Gable Sidewall
A004 Square Tube A016 Groundwork of Left and Right Pole
A005 Side Purline A017 Groundwork of Gable Pole
A006 Side Purline of Gable A018 Screw of Fabric Controlling Bar
A007 Pole of Gable A019 Cable Wire
A008 Cross Strut B001 Roof Covering
A011 Fabric Controlling Bar of Roof Covering B002 Gable Fabric
A012 Fabric Controlling Bar of Gable B004 Sidewall on Two Length Sides
A013A Inner Connector of Fabric Controlling Bar A B005 Sidewall on Two Width Sides
Foot Plate
Tension Bar
Bottom Wall Bar
Wire Cable
Tension Bar
Foot Plate of Gable Pole
Bottom Wall Bar
Roof Beam
Cross Base
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

As shown in the figure, find the position of
each groundwork. Since the groundwork of
the tent is fixed with the pole, so don’t need
to fix the groundwork on the ground at the
begging.
When the tent finish the installation, use
steel nails or expansion bolt or loading
plate to fix it.
Distribution Diagram of Groundwork
Distance is from middle to middle
As shown in the figure, find the position of each footplate. Since
the footplate of the marquee is fixed to the pole, you don’t need
to fix the footplate to the ground at the beginning.
When the tent installation is finished, use the steel pins or
expansion bolt or loading plate to fix the marquee.
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Fixing on the ground
1. Fasten all footplates to the ground with
expansion bolts.
2. The distance between foot plates is
per drawing Distribution Diagram of
Groundwork
1. Fasten all groundwork to ground by
expansion bolts.
2. Fix tent partly shows as picture in right.
The space between part is 3m.
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Assembly Drawing of Structure
1. Once the all frame sections have been assembled.
Lift Frame 1 up into the upright position.
2.Lift Frame 2 up while keep first section upright.
(for safety reasons three to four installers required to
support the sections whilst being installed, ropes are
included for bracing) ( See Drawing 1)
3.Connect Frame 2 to frame 1 by installing the cross
braces, fasten the cross braces on to the uprights
using the fastening points. ( See Drawing 3)
4. Attach side purlins to Frame 1 and then attach
Frame 2. Fasten square tubes to girders of Frame 1
and Frame 2. (Drawing 2)
5. Lift remaining frame sections and repeat assembly
process.
6. Fasten the remaining braces when frame is
assembled.
7. Fix wire cable between Frame 1 and 2 on roof
beams in a cross section. (Drawing 3)
For more detail refer to the following pages.
Assembly Drawing of Structure
1.List Piece 1 up after all parts of it
has been connected to each other.
2.List Piece 2 up while keep piece
upright. (Support the poles by three
or four installers) (Drawing 1)
3.Connect Piece 2 to Piece 1 by cross
struts and fasten them to the right part
of Piece 1 and Piece 2.
4.Fix side purline. Fasten square tubes
to girders of Piece 1 and Piece 2.
(Drawing 2)
5.Lift Piece 3, then connect it to the
unit of Piece 1 and Piece 2 by side
purlines and square tubes. List the
rest Pieces up and fix them one by
one in the same way.
6.Fasten the rest four struts when l
ast piece is set up.
7.Fix wire cable in the first room and
last one. (Drawing 3)
Drawing 1
Drawing 2
Drawing 3
Assembly Drawing of Structure
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Assembly Drawing of Fabric
Roof Covering Fabric
Unpack the Roof-Cover and put it onto a ground
to avoid it getting dirty or damaged;
Throw 2 pieces of Setup-Ropes over the one bay of the
frame;
Tie one end of one rope onto the “D” ring at the corner of
the roof cover. Repeat on other roof fabric.
Lift the Roof-Cover up to the eaves and feed the Keder
track rope into the grooves of the Roof-Beams
Slowly slide the Roof-Cover into the bay by pulling on the
other end of each rope. Care is required to ensure that the
ropes are pulled uniformly and together;
Pull until the Roof-Cover reaches the opposite eaves;
taking care not to drag the sheet on the ground.
Repeat the procedure until all Roof-covers have been
pulled on.
CAUTION: Roof-Cover has to be completely inserted into
the groove of the Roof-Beam.
Gable Fabric
Divide the Gable cover in to two pieces;
Pulling each triangle up the Keder grooves.
Connect the two triangles together with the chords.
Assembly Drawing of Fabric
Gable Fabric
1..One installer on the roof carefully
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Side Fabric
1.Select gable sidewall fabric apart from the rest sidewall
fabric, whose width is about 5m.
2.Put the sides of sidewall fabric in the channels in poles.
(The side with plastic buckles should be in the top side)
3.Put fabric buckles to relative side purline.
4.Zip up the slide fastener in the center of each piece of
sidewall fabric.
Assembly Drawing of Fabric
Wall Fabric
1.Select walls for the Front and Rear, width could be different to
the side walls. Put wall to the side.
2. To attach the walls to the frame
2.1) Select the inside and outside of wall. Top of the wall has the
round tracking.
2.3) Working from top of the frame to the ground. Insert the side
wall into the upright post tracking.
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Tensioning the Roof Covers & Triangle Covers
Once all Roof-Covers and Gable Ends attached,
simply slide in the Tension-Bars into the pocket of
the Roof-Cover and Gable-Triangle cover.
Then, fix the connection of the Tension-Bar by
tensioning the rigging screws as below drawing.
Side Triangle
Side Triangle
Roof Cover
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Assembly Drawing of Fabric Bottom
of Wall Bar
Sliding the steel bars into the bottom
the wall panels and then fix to uprights.
As per the below illustrations 1 and 2.
Step 8
As show in Drawing 1, infix
the Fabric Controlling Round
Bar to the hole, after all
completed; use screw to fasten
it as show in Drawing 2.
Assembly Drawing of Fabric Controlling Round Bar
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Caution
1. Don’t put heavy items on the components
when they are being transported.
2. The PVC should be cleaned with neutral
detergent other than any acidic or alcohol
solutions. Only pack the pvc when it is dried
thoroughly
3. Keep the storage house clean and dry, and
check the goods regularly when the tent has
not been used for a long time.
4. Choose the appropriate method of ground
fixings according to the type of surface.
A. Concrete ground(the thickness of
concrete layer should be not be less than
17cm),expansion bolt M16x100 is suggested.
B. Grass or Sand , Steel Pins are suggested.
C. DO NOT USE Expansion bolts and steel nails
on grass or sand surfaces. Foot Weight plates
are suggested and the correct use of weight as
per Engineering Certificates.
5. Wind rating as per engineering certificate,
please review for weather conditions.
6. If in snowy areas please remove snow when
more then 10cm thick.
7. Do not attach roof and wall fabric until frame
is assembled and secured.
8. When the marquee is in use, do not leave
your marquee unattended.
9. When the Marquee is use and if part of the
structure looks damaged or not fit for purpose
the marquee should be dismantled at once for
safety reasons.
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Assembly of Door
1. Put the top end of the door pole into the channel of side purlin.
See picture 1.
2. Fix the door frame to the first door pole which was just fitted, then
fasten the screw.
3. Put the fabric of the door to the right place according to picture 3.
4. Fix the second door pole according to what shows on picture 4.
5. Fix left sidewall of door. The door can be fixed to tent before or
after the sidewall of tent has been fixed.
NOTE: The drawing is for reference only, the actual item is the standard.
1
2
3
4
5
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Assembly of Roof Lining
1. Spread out the lining. Install the snap clips in the middle of the
lining fabric. See Drawing A. One person on a ladder/ scaffolding
or cherry picker. Put snap clips into channel of the square tube on
the highest part of the roof. Keep the space between each snap clip
evenly spaced.
2. Install the snap clips on each end of the lining and put the snap
clips into the channel of side purlin. See drawing C. Do the same of
the girder side.
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Assembly of Gable Lining
Spread the gable lining, then put the snap clips of side lining into
the channel girder.
See drawing D.
We design | We manufacture | We sell | We Deliver Australia wide www.extrememarquees.com.au admin@extrememarquees.com.au 1300 850 832
6m x 12m CREST INSTRUCTIONS
DO85655 - Solbrew - Solomon BreweriesLtd
23/03/2017

Assembly of Side Lining
Spread the side lining, then put the snap clips of the side lining into
channel on the other side of purlin.
See drawing E.