Ex-Or MLS2001DF, MLS2001DSM, MLS2001DALIF, MLS2001DALISM Installation Instructions

MLS Digital Detectors
MLS2001DF & MLS2001DSM for DSI ballasts
MLS2001DALIF & MLS2001DALISM for DALI ballasts
MLS2001DF
MLS2001DALIF
MLS2001DSM
MLS2001DALISM
Installation and Commissioning
Instructions
Note: QuickSet Pro required for commissioning
MLS Digital Detectors: MLS2001DF/SM for DSI ballasts & MLS2001DALIF/SM for DALI ballasts
Note: Connections to this equipment should be made by a suitably qualified person and in accordance with the current wiring regulations.
MLS Digital Detectors are the high-performance, communicating, presence detectors which lie at the heart of the advanced lighting management system known as The Ex-Or MLS Digital. These MLS Detectors are equipped with a regulating photocell to work with digital DSI/DALI ballasts.
Fixing
Flush Versions: Depth required behind ceiling: 62mm from front flange plus an allowance for the minimum bend radius of the cable. The sinking box fits into a 89mm diameter hole in ceiling tile or plasterboard ceiling. To avoid damage to ceiling tile, do not overtighten. No access above the ceiling is necessary.
Surface Versions: The housing may be secured to a hard surface or a BESA box. The unit fits into the housing with a simple bayonet action.
Note: Do not mount within 25cm of a luminaire.
Connection Overview (see last page for diagram)
Each luminaire to be controlled must contain a digital regulating type ballast with the appropriate DSI or DALI input. Ballast types must not be mixed. Connect all ballasts in the control group (maximum 25) in parallel and also to the polarity-free digital output of the MLS Detector.
Each luminaire is controlled completely by its digital input and therefore would normally have a permanent power supply. Turning the power off to some lights within a control circuit will not affect the operation of those that remain powered-up.
The MLS Bus must be connected to the MLS bus wiring network. An MLS Bus Power Supply is required for each network of up to 200 MLS Detectors. Please refer to Bus Power Supply installation instructions prior to commencement of any bus wiring.
It is imperative that the MLS bus is wired with the correct type of cable; normally it should be 1.5mm unscreened twisted
2
pair. Please read Application Note AN4001 for more details. Do not connect mains to the MLS bus.
‘OneSwitch’ Dimming
OneSwitch dimming affords local control to the end-user whereby a simple, momentary, push-to-make wallswitch can be used to raise or lower the lighting level or to toggle the output ON/OFF. A short press of the switch (less than 1 second) will toggle the output status while a longer press will raise or lower the output. Each time the switch is pressed, the direction of dimming reverses. If the switch has not been pressed for 5 seconds, the direction will be up (brighter) - unless the output is already above 90% in which case the direction is down. If the switch is held continuously, and the output reaches maximum, the light output will remain at this level until the switch is released - a latching switch may be connected in parallel allowing the occupancy detection to be overridden on (Note: If the initial direction was down, when the output reaches minimum it will ramp back up automatically). A wiring diagram is shown on the last page.
Setting the Regulating Photocell
This product is intended for use with high frequency regulating ballasts with digital control inputs. An infrared programming tool QuickSet Pro is required for programming the regulating light level set point. The setting is preserved in the event of a power failure and can be re-programmed any number of times.
Using the QuickSet Pro, enter the Utilities menu, select ‘LightSpot/MLS/LCM’ then ‘Set Light Level’. Use the ‘up’ and ‘down’ buttons to manually adjust the light output from the luminaire(s) and when at the required level press and hold ‘OK’ to store. The luminaire(s) will blink to acknowledge a successful store operation.
Commissioning
Detectors are supplied factory pre-set which ensures the lighting will switch on automatically as soon as power is applied. Final commissioning of the detectors, including assigning to zones, requires the use of the QuickSet Pro Programmer.
Commissioning Detectors using the QuickSet Pro
It is important that the Programmer be held perpendicular between 0.5m and 2m from the sensor.
1. Switch on by pressing any button (and unlock with top left rectangular button).
2. Point the programmer at detector and press the DOWNLOAD button. The programmer will confirm the product’s identity and call up the correct menu of parameters and their current settings.
3. Use a combination of UP, DOWN, FORWARD and BACK buttons to navigate the parameter menu, selecting options for each shown.
4. When options for all parameters have been selected, point the programmer at the detector and press the UPLOAD
Parame ter Options Pre-Set Notes
Power Up On / Off On
Sets the lum inaire state at pow er up irres pective of occupancy. Useful in redu cing s tart-up loa d follow ing po wer cut. Power­up off - respon ds to occupancy after 30 seco nds .
Res pons e Auto, Manual/Bus , Manual only Auto If set to Au to, the prese nce detector s witche s the luminaire on
and off autom aticall y. If set to Manual Only, it can only be turned on by usi ng OneSwi tch or the hand-h eld con troller. If set to Man ual/Bus , an MLS Bus turn-on com m and for a Zone to which the detector be long s wi ll als o bring the light on. In all modes the "When Vacant" behaviour (below ) is in itiated autom aticall y.
Off Dela y 1 min - 96 hrs, 10-s ec (walk-test), Dis able d 20 mi ns The time for whi ch the lum ina ire wil l stay on follow ing the la st
detected m ovemen t. Als o 10-secon d se tting for walk-tes ting.
On Sensi tivity 0 -100 100
Sens itivity to moveme nt when are a is occupied. 100 = max
Bus Co nnect Yes / No Yes
Do/Do not Sign al/Rece ive on MLS Bus.
1st - 4th Zone Address 1-100; -- (no zone); Com mo n 1-3 No Zone Individual Zone s in fluenci ng and being influen ced by this
detector.
Corridor 1 & 2 0-100; -- (no zone); Buildi ng No Zone Zone range s in fluenci ng and being influen ced by this detector.
Global 1 & 2 Rx Yes / No No
Res pond to sele ctive load sh eddi ng.
Manual Input Shared / Local Local Do/Do not sig nal OneSw itch com ma nds acros s the MLS Bus.
Start Lamps Max / Min Max
Sets the level at which the lam ps strike wh en turnin g on.
Entry Scene 1-6 Scene 1
Sets whi ch sce ne is recall ed whe n unoccu pied area is entered.
Bright Out Yes / No No If set to yes, moveme nt fails to refresh the off delay if amb ient
light level exceeds 125% of s et level and the lum inaire will switch off when the off delay has el aps ed. NB: Dim m ing m us t be se t to 100%.
Dim ming Reg 50% -Reg1 00% 100% Can be s et to operate be tween 50 % and 10 0% bal las t output
from m ax down to a bottom-e nd lim it when working on photocel l control.
Lam p Max 10%-10 0% 100%
Can be s et to lim it the abs olute m aximu m ou tput of the ballas t in all op erating mod es .
Fade to Off Yes / No No
When no pres ence is detected , and after the off delay period, the lam ps can fade out ins tead of switching off (approx 80 seconds to fade from 10 0% to 0%).
When Vacant Off / Min / Reg <25% / Scene 6 Off Options for a vacant area after it has time d out. Lumi naire s
can turn off, remain at mini mu m ou tput, or regulate wi th a 25% output lim it, until the next period of occup ancy. If program me d to remai n at min im um , to regulate bel ow 25% or go to scene 6, there are further progra mm able options to switch off after 3 times the Off Delay (XTN) or wh en no further m oveme nt has been de tected anywhere in the build ing (BLD ).
Set-point Low 0-1023 1023 Ai mi ng poi nt as ph otocell adjus ts bal las t output.
Set-point Hig h 0-1023 1023 Level above which photoce ll s witches its output off (only if
Bright Out = Ye s).
100 Hou r Burn-In Burn-in 10 0 hrs / Cancel / Res um e 0 hr See Appli cation No te: AN4028
Additional feature accessible under Utilities:
button. The luminaire(s) will switch off briefly during the programming process.
5. After a short period of inactivity (default 5 minutes), the programmer hibernates retaining the most recent settings.
Dimensions Electrical Connections
OneSwitch
62mm
deep
100mm
Flange: 10mm deep
BALLAST
CONTROL
L
N
MLS Bus
Connection
230V 50Hz Mains Supply
Polarity-free Digital Output to compatible luminaires
To further
MLS Devices
Technical Data
MLS CABLE: 1.5mm unscreened twisted-pair : see Application Note AN4001
2
RECOMMENDED MAXIMUM MOUNTING HEIGHT: 3.0m
RANGE: Cone-shaped detection pattern, diameter (at floor level) = 2.4 x mounting height
OPERATING VOLTAGE: 230V 50Hz (UK & Europe)
6.0m
2.5m
PRODUCT RATING & RECOMMENDED CIRCUIT PROTECTION: 10 Amps
CAPACITY: 25 ballasts OUTPUT: 2-wire digital polarity free PHOTOCELL: Regulating OFF DELAY: Adjustable via Programmer - factory pre-set to 20 minutes DEPTH REQUIRED BEHIND CEILING (FLUSH VERSION): 62mm from front flange plus an allowance for the minimum bend radius of the cables. WEIGHT: 210g (flush version), 187g (surface version) COLOUR: White RAL9010 MATERIAL: Flame retardant PC/ABS IP RATING: 4X OPERATING TEMPERATURE: 0 C to 40 C
o o
Important Additional Notes
1. All terminals on this product are provided for final connections. It is not intended that the product be used as a
junction box for looping cables.
2. A means for disconnection must be incorporated in the fixed wiring in accordance with the current wiring
regulations.
3. Although nominally 12V, the dimming output is not SELV and therefore should be treated with the same respect as
mains with regard to wiring practice. The 0V line of the dimming output is almost at Neutral potential.
4. The dimming control output should be connected only to the control input of the ballasts - never to other detectors.
5. This equipment should be used to control only those ballasts powered from the same phase as the detector.
6. Due to the fact that the photocell is on the ceiling looking down, it is not possible for measurements made with a lux
meter on the working plane to remain constant when daylight illuminates the ceiling and the working plane to a differing extent. Therefore, products of this type should be regarded as capable of maintaining an APPROXIMATE light level only.
Honeywell Ex-Or
St. Marks Court, North Street,
Horsham, West Sussex, RH12 1BW, UK. Tel: +44 (0)1942 719229
Fax: +44 (0)1942 508753 Email: technicalsales.ex-or@honeywell.com www.ex-or.com
At the end of their useful life the packaging and product should be disposed of via a suitable recycling centre. Do not dispose of with normal household waste. Do not burn.
W4290K
Loading...