Euronda E9 Service manual

Steam Sterilizer
E9 RECORDER
E9 MED
service manual
ENGLISH
0051
CONTENTS
1 - INTRODUCTION ................................................................................................................ 7
1.1 GENERAL PRECAUTIONS .......................................................................................................................................... 7
1.2 READING THE MANUAL: SYMBOLS AND CONVENTIONS ............................................................................... 7
1.3 HOW TO OBTAIN A NEW COPY OF THE MANUAL ............................................................................................. 8
2 - SAFETY ............................................................................................................................. 9
2.1 GENERAL SAFETY WARNINGS ................................................................................................................................ 9
2.2 SAFETY DEVICES ........................................................................................................................................................ 10
2.3 RESIDUE RISKS ........................................................................................................................................................... 11
2.4 SAFETY SIGNS ON THE UNIT .................................................................................................................................. 12
3 - TECHNICAL DATA .......................................................................................................... 13
3.1 OVERALL SPACE REQUIRED .................................................................................................................................. 13
3.2 TECHNICAL DATA AND NOISE ............................................................................................................................... 14
3.3 QUALITY OF WATER ................................................................................................................................................ 15
3.4 SERIAL NUMBERS CODING ................................................................................................................................... 16
4 - INSTALLATION ............................................................................................................... 17
4.1 POSITIONING THE UNIT ........................................................................................................................................... 17
4.2 INSTALLING THE UNIT ............................................................................................................................................. 18
4.2.1 Installation and adjustement ...................................................................................................................................... 18
4.3 OPERATOR REGISTRATION .................................................................................................................................... 23
4.4 PERFORMING THE VACUUM TEST ....................................................................................................................... 24
4.5 PERFORMING THE B134 CYCLE ............................................................................................................................. 25
4.6 LABELS PRINTING (ONLY E9 RECORDER) ......................................................................................................... 26
4.7 DELIVERY OF TECHNICAL DOCUMENTATION ................................................................................................ 28
5 - DESCRIPTION OF CYCLE AND MAIN PERFORMANCE DATA ................................... 29
5.1 E9 INSPECTION COMPONENTS .............................................................................................................................. 29
5.2 CYCLE FOR E9 INSPECTION WITH SEPARATOR DRAINING PUMP ........................................................... 31
5.2.1 Phase 0: Turning on the sterilizer .............................................................................................................................. 32
C
ONTENTS
AUTOCLAVE
E9
5.2.2 Start-Vacuum phase V1/I .......................................................................................................................................... 33
5.2.2 Start-Vacuum phase V1/I .......................................................................................................................................... 33
5.2.3 Vacuum phase V1/II ................................................................................................................................................. 34
5.2.3 Vacuum phase V1/II ................................................................................................................................................. 34
5.2.4 Vacuum phase V1/III ................................................................................................................................................ 35
5.2.5 Water inlet phase ....................................................................................................................................................... 36
5.2.6 Water outgas system drain phase .............................................................................................................................. 37
5.2.7 Pressure increase phase P1 ........................................................................................................................................ 38
5.2.8 Water transfer phase.................................................................................................................................................. 39
5.2.9 Vacuum - Thermodynamic vacuum phase V2 ........................................................................................................... 40
5.2.10 Vacuum 2,3,4 phase V2 .......................................................................................................................................... 41
5.2.11 Pressure increase/Sterilization phase P4 .................................................................................................................. 42
5.2.12 Sterilization phase ................................................................................................................................................... 43
5.2.13 Steam discharge phase ............................................................................................................................................ 44
5.2.14 Steam discharge phase I .......................................................................................................................................... 45
5.2.15 Pressure levelling phase I ........................................................................................................................................ 46
5.2.16 Vacuum phase II ..................................................................................................................................................... 47
5.2.17 Pressure levelling phase II ...................................................................................................................................... 48
5.2.18 End of cycle phase .................................................................................................................................................. 49
5.3 CYCLE FOR E9 INSPECTION/RECORDER WITH CIRCUIT U-234 (since firmware 7.01) ........................ 50
5.3.1 Turning on the sterilizer ............................................................................................................................................ 50
5.3.2 Phase 1: Start, water outgas system emptying and steam generator filling (U-234 circuit) ...................................... 51
5.3.3 Phase 2: Steam generator emptying (U-234 circuit) ................................................................................................. 52
5.3.4 Phase 3: Water outgas system filling (U-234 circuit) ............................................................................................... 53
5.3.5 Phase 4: Vacuum into chamber and water outgas system (U-234 circuit) ................................................................ 54
5.3.6 Phase 5: Water separator emptying and steam generator filling (U-234 circuit) ...................................................... 55
5.3.7 Phase 6: Pressure rise (U-234 circuit) ....................................................................................................................... 56
5.3.8 Phase 7: Emptying and vacuum (U-234 circuit) ....................................................................................................... 57
5.3.9 Pressure rise (U-234 circuit) ..................................................................................................................................... 58
5.4 CYCLE FOR E9 MED (up to EGO090100 18 L and up to EGP090080 24 L) ......................................................... 59
5.4.1 Turning on the sterilizer ............................................................................................................................................ 59
5.4.2 Phase 1: Vacuum into chamber ................................................................................................................................. 60
5.4.3 Phase 2: Steam generator filling ............................................................................................................................... 61
5.4.4 Phase 3: Pressure rise ................................................................................................................................................ 62
5.4.5 Phase 4: Water separator emptying and vacuum ....................................................................................................... 63
5.4.6 Third pressure rise and sterilisation .......................................................................................................................... 64
5.4.7 Drying phase ............................................................................................................................................................. 65
5.5 CYCLE FOR E9 MED (since EGO090101 18 L and since EGP090081 24 L) ......................................................... 66
5.5.1 Phase 0: Turning on the sterilizer.............................................................................................................................. 66
5.5.2 Phase 1: Start and chamber emptying ....................................................................................................................... 67
5.5.3 Phase 2: Water injection into the chamber ................................................................................................................ 68
5.5.4 Phase 3: Pressure rise ................................................................................................................................................ 69
5.5.5 Phase 4: Pressure discharge and emptying ................................................................................................................ 70
5.5.6 Phase 5: Pressure rise and separator emptying .......................................................................................................... 71
5.5.7 Phase 6: Pressure balancing ...................................................................................................................................... 72
5.6 EXAMPLES OF STERILIZATION CYCLE REPORTS ......................................................................................... 73
6 - DESCRIPTION OF TEST AND MAIN PERFORMANCE DATA ...................................... 74
6.1 GRAPH OF COMPLETE VACUUM TEST............................................................................................................... 74
6.1.1 Phase 0: Starting ....................................................................................................................................................... 75
4
E9 service manual GB r7
C
ONTENTS
AUTOCLAVE
E9
6.1.2 Vacuum phase ............................................................................................................................................................ 76
6.1.3 Pressure levelling/Maintenance phase ....................................................................................................................... 77
6.1.4 Pressure levelling phase ............................................................................................................................................. 78
6.2 BOWIE&DICK TEST ................................................................................................................................................... 79
6.3 HELIX TEST ................................................................................................................................................................. 79
7 - MAINTENANCE ............................................................................................................... 81
7.1 SAFETY WARNINGS ................................................................................................................................................... 81
7.2 PERIODIC MAINTENANCE ....................................................................................................................................... 83
7.3 EXTRAORDINARY MAINTENANCE ....................................................................................................................... 84
7.4 TECHNICAL MENU ..................................................................................................................................................... 86
7.5 COMPONENTS LIST E9 INSPECTION (U-234 / RECORDER CIRCUIT) .......................................................... 94
8 - COMPONENTS AND DIAGRAMS ................................................................................... 96
8.1 WIRING DIAGRAM ..................................................................................................................................................... 96
8.2 HYDRAULIC DIAGRAM ............................................................................................................................................. 98
8.2.1 Hydraulic diagram E9 ................................................................................................................................................ 98
8.2.2 Hydraulic diagram E9 U-234 ..................................................................................................................................... 99
8.2.3 Hydraulic diagram E9 MED (since EGO090101 18 L and since EGP090081 24 L) ................................................ 99
9 - SPARE PARTS CATALOGUE ...................................................................................... 100
9.1 EXPLODED GENERAL DIAGRAM OF E9 INSPECTION ................................................................................... 100
9.2 INDEX OF TABLES .................................................................................................................................................... 101
9.2.1 TAB. 01: SAFETY HOUSING ASSEMBLY E9 .................................................................................................... 102
9.2.2.1 TAB. 02: DOOR ASSEMBLY E9 INSPECTION / RECORDER ....................................................................... 103
9.2.2.2 TAB. 02: DOOR ASSEMBLY E9 MED.............................................................................................................. 104
9.2.3.1 TAB. 03: CONTROL PANEL ASSEMBLY E9 INSPECTION .......................................................................... 105
9.2.3.2 TAB. 03: CONTROL PANEL ASSEMBLY E9 RECORDER ............................................................................ 106
9.2.3.3 TAB. 03: CONTROL PANEL ASSEMBLY E9 MED ........................................................................................ 107
9.2.4.1 TAB. 04: TANK AND POWER CARD + PRESSURE TRANSDUCER ASSEMBLY E9 ................................ 108
9.2.4.2 TAB. 04: TANK AND POWER CARD + PRESSURE TRANSDUCER ASSEMBLY E9 U-234 / RECORDER /
MED ............................................................................................................................................................................ 110
9.2.5.1 TAB. 05: VACUUM PUMP AND RADIATOR ASSEMBLY E9 ...................................................................... 112
9.2.5.2 TAB. 05: VACUUM PUMP AND RADIATOR ASSEMBLY E9 U-234 / RECORDER / MED ....................... 113
9.2.6.1 TAB. 06: TANK SUPPORT AND NME MICROPUMP ASSEMBLY .............................................................. 114
9.2.6.2 TAB. 06: TANK SUPPORT AND SICCE MICROPUMP ASSEMBLY ............................................................ 115
9.2.6.3 TAB. 06: TANK SUPPORT AND MICROPUMP ASSEMBLY E9 U-234 / RECORDER / MED ................... 116
9.2.7.1 TAB. 07: CHASSIS, WATER OUTGAS SYSTEM AND CROSSPIECE ASSEMBLY E9 INSPECTION /
RECORDER ............................................................................................................................................................... 117
9.2.7.2 TAB. 07: CHASSIS AND CROSSPIECE ASSEMBLY E9 MED ...................................................................... 119
9.2.8.1 TAB. 08: SOLENOID VALVE ASSEMBLY E9 ................................................................................................ 121
9.2.8.2 TAB. 08: SOLENOID VALVE ASSEMBLY E9 U-234 / RECORDER ............................................................. 123
9.2.8.3 TAB. 08: SOLENOID VALVE ASSEMBLY E9 MED....................................................................................... 125
5
E9 service manual GB r7
C
ONTENTS
AUTOCLAVE
E9
9.2.9.1 TAB. 09: BOILER/ELECTROMAGNET ASSEMBLY E9 INSPECTION / RECORDER ............................... 127
9.2.9.2 TAB. 09: BOILER/ELECTROMAGNET ASSEMBLY E9 MED ...................................................................... 129
9.2.10 TAB. 10: FRONT PANEL ASSEMBLY E9 ........................................................................................................ 131
9.2.11 TAB. KIT: ACCESSORIES KIT E9 .................................................................................................................... 132
10 - PRODUCT VERSIONS ................................................................................................ 133
10.1 REGISTRATIONS OF MODIFICATIONS TO E9 HARDWARE ...................................................................... 133
11 - TROUBLESHOOTING ................................................................................................. 134
11.1 SUMMARY OF ALARM SIGNALS ....................................................................................................................... 134
11.2 REPAIR BRIEFS ....................................................................................................................................................... 140
Index of repair briefs ........................................................................................................................................................ 140
11.3 REQUIRED MAINTENANCE TOOLS .................................................................................................................. 162
12 - DEMOLITION .............................................................................................................. 165
12.1 DEMOLITION INSTRUCTIONS ........................................................................................................................... 165
12.2 RESALE ..................................................................................................................................................................... 165
APPENDIX .......................................................................................................................... 166
APPENDIX 1 ....................................................................................................................... 166
6
E9 service manual GB r7
1 - Introduction
SYMBOL
DESCRIPTION
1.1 GENERAL PRECAUTIONS Before performing any maintenance operations, carefully read the instructions manual
supplied with the unit.
WARNING: When replacing components that directly or indirectly affect safety, it is essential to only use ORIGINAL SPARE PARTS.
WARNING: DISCONNECT THE POWER SUPPLY BEFORE STARTING WORK. Non­observance may cause serious injury to people.
DANGER: HIGH INTERNAL VOLTAGE.
ALL MAINTENANCE OPERATIONS MAY ONLY BE PERFORMED BY THE RESPONSIBLE AUTHORITY OR THE TECHNICAL ASSISTANCE SERVICE.
Have repairs carried out by EURONDA S.p.A. authorised centres using calibrated and certified instruments. Otherwise, send the autoclaves directly to EURONDA S.p.A..
The drawings and any other documents delivered with the unit may not be divulged to third parties in that Euronda S.p.A. is the sole owner and reserves all rights to them.
Euronda S.p.A. reserves the right to make modifications or improvements to the manual or the unit without notice and without being obliged to update previous production and manuals.
1.2 READING THE MANUAL: SYMBOLS AND CONVENTIONS
In this manual symbols are placed beside certain descriptions, notes, etc.. These symbols are used to attract the attention of readers to a particular note or explanation. Their meaning is explained below.
IMPORTANT SAFETY INFORMATION This symbol is used to draw the attention of the reader to particularly important notions for operator safety.
INFORMATION AND PRECAUTIONS This symbol refers to general indications and advice.
STRICTLY FORBIDDEN This symbol means it is strictly forbidden to perform the operation in question. Non­observance may cause serious harm to the operator or damage to the equipment.
The manual is divided into chapters and subchapters; the figures are numbered with to chapter to which they refer, with the addition of a progressive number. E.g.: Fig. 3.4-1 (figure n°1 relative to chap. 3.4).
1 - I
NTRODUCTION
1.3 HOW TO OBTAIN A NEW COPY OF THE MANUAL
If the manual is lost or destroyed, ask Euronda S.p.A. for a new copy. Provide the following information:
- name and model of the unit;
- name and address where the manual should be sent. Send your request to the following address:
EURONDA SPA
AUTOCLAVE
E9
Via dell’Artigianato, 7
36030 Montecchio Precalcino
Vicenza - Italy
Tel. 0445 329811 - Fax 0445 865246
E-mail info@euronda.com
8
E9 service manual GB r7
2 - Safety
2.1 GENERAL SAFETY WARNINGS
Before using the equipment, read the safety information carefully. Non-observance could cause accidents or damage to the machine or injure the operator.
- Before using the unit, operators must have perfectly understood the meanings and functions of all the
controls.
- Operators must be aware of and know how to apply the safety regulations governing the use of the unit.
- Operators must know and correctly interpret all the indications contained in this manual and those applied
to the unit.
- Operators must not perform operations on their own initiative or operations that are not part of their job.
- The responsible authority is responsible for the professional training of operators.
- In the event of malfunctions or potentially dangerous situations, operators MUST immediately report the
situation to the responsible authority.
- It is strictly forbidden to use or neutralize the safety devices.
- Make sure the unit is powered at the correct voltage.
- Make sure the unit is earthed and conforms to the standards applicable in the country of installation.
- Never dismantle the unit.
- Do not remove the outer safety guard. Even if the unit is not in operation, its cooling fan is always on if
power supply to the machine is connected. Danger of injury to hands (see chap. 2.3 “Residue risks”).
- The high voltages inside the unit are dangerous.
- If it is not possible to disconnect the power supply, disconnect the mains supply. If this is distant or not
visible by the person carrying out the maintenance work, place the sign, “Work in progress” on the mains switch after it has been turned “OFF”.
- Keep the area around the unit clean and dry.
- Do not use solvents on the label.
- Do not remove the label on the unit. If necessary, ask for a new one.
- Clean the unit with a damp cloth after checking that the power lead is not connected (before using the unit
again, remove any traces of moisture).
- Do not pour water onto the unit or any other liquids that could cause short circuits or corrosion.
- Do not touch the unit with wet hands or if it is wet; always follow the precautions required for the use of
electrical equipment.
- The unit was not designed for use in the presence of gas or explosive vapours.
- Do not submit the unit to excessive mechanical stress such as impacts or strong vibrations.
- Do not lean over or stand in front of the door when opening it as there is a risk of scalding from escaping
steam (see chap. 2.3 “Residue risks”).
- The water used in the discharge tank could contain, in the case of incomplete or failed sterilisation,
contaminated residues; it is therefore advisable to use protective rubber gloves when unloading (see chap. 6.7 “Tanks: instructions for filling and emptying” in the instructions manual supplied with the unit and chap. 2.3 “Residue risks” in this manual).
- Before transporting the machine, drain both water tanks. Use the supplied drain tube and follow the
instructions for draining (see chap. 6.7 “Tanks: instructions for filling and emptying” in the instructions manual supplied with the unit).
2 - S
Description
Effect
Description
Effect
Description
Effect
AFETY
2.2 SAFETY DEVICES Electrical safety
AUTOCLAVE
E9
Double-pole thermal safety switch for protecting the device against short-circuits.
Protection of the electronic board against short­circuits: both the transformer and the entire low­voltage circuit are self-protected
Thermal protection
The electronic board, the vacuum pump and the vibration pump are all protected by a thermostat
Thermal protection of the unit: the device is blocked if made to work under conditions that do not fall within the ambient temperature range
Resettable safety thermostat, complying with PED 97/23/CE standards, for protecting the steam generator from over-heating
Resettable safety thermostat, for protecting the heating resistance of the chamber
Safety valve, complying with the PED 97/23/CE standards, for protecting the unit from over-pressure
Mechanical safety devices
Disconnects main electrical power supply
Disconnects one or more low-voltage circuits
Temporary cut-off to permit cooling
Alarm message and use of the machine is prevented due to unsuitable environmental parameters
Disconnection of power supply to the steam generator
Disconnection of power supply to the resistances
Discharge of steam and re-balancing of pressure to safety values
Door safety micro-switch: ensures that the door closes correctly
Door lock micro-switch: shows the correct position of the locking system
Door lock: electro-mechanical device that prevents the door from being opened accidentally
Extractor tool. It allows not to touch the inner hot parts. It avoids incidental burns while extracting the trays containing the sterilized tools.
Message indicating wrong door position
Indication that the door is not locked
Prevents the door from being opened while the unit is in operation
Attempting to open the door with the door safety device applied may seriously damage the closing system
Door regulation tool
10
E9 service manual GB r7
2 - S
Description
Effect
NO!
NO!
AFETY
Control devices
AUTOCLAVE
E9
Pressure levelling: restores the system to its normal pressure values, in the event of manual stops or alarms and/or warnings during the cycle
System for evaluating process parameters, managed entirely by the microprocessor
Constant monitoring of the device: the components of the autoclave are constantly monitored during operation
It is forbidden to remove, modify, tamper with or in any way neutralize the safety devices. Euronda S.p.A. declines all liability for accidents to people or damage or malfunctions of the unit if the above instruction is not observed.
Periodically check the safety systems (see chap. 8 “Maintenance”).
Automatic pressure re-balancing inside the sterilization chamber.
In the event of faults during the cycle, the program in progress is stopped immediately and alarms are generated
Generation of alarm messages and/or warnings in the event of faults
2.3 RESIDUE RISKS
During the normal work cycle, the operator is exposed to certain risks that cannot be completely eliminated due to the nature of the unit.
- Danger of burns.
1. When the sterilizer finishes the sterilization cycle and the door is opened to remove the sterilized
instruments, the inner parts of the boiler and door are still very hot. Do not touch these directly in order to avoid getting burnt (Fig. 2.3-1). Use the relative extractor tool (chap. 2.2 “Safety devices”).
2. When opening the door, do not stand over or in front of it as you may be scalded by the steam (Fig.
2.3-2).
Fig. 2.3-1 Fig. 2.3-2
11
E9 service manual GB r7
2 - S
AFETY
- Danger of contamination.
The water used in the discharge tank may, if not properly sterilized, contain contaminated residues: wear
latex safety gloves when draining.
- Danger of injury to hands. Even if the unit is not in operation, its cooling fan is always on if power supply to the machine is connected. Do not remove the outer safety guard before disconnecting
power supply.
2.4 SAFETY SIGNS ON THE UNIT
Safety signs on the unit:
WARNING: DISCONNECT FROM THE POWER SUPPLY BEFORE OPENING THE SAFETY GUARD
ATTENTION: HOT SURFACE
AUTOCLAVE
E9
These signs must not be removed, covered or damaged.
12
E9 service manual GB r7
Overall dimensions of the unit with the door closed (Fig. 3.1
-
1):
Overall dimensions of the unit with
the door open (Fig. 3.1
-
1):
Weight of unit:
3.1 OVERALL SPACE REQUIRED
3 - Technical data
Fig. 3.1-1
E9 INSPECTION/RECORDER/MED 18 E9 INSPECTION/RECORDER/MED 24
E9 INSPECTION/RECORDER/MED 18 E9 INSPECTION/RECORDER/MED 24
E9 INSPECTION/RECORDER/MED 18 E9 INSPECTION/RECORDER/MED 24
Empty: 42 kg. Maximum weight with full tank and maximum load: 51 kg
L = 450 mm
H = 445 mm
P = 610 mm
L = 630 mm
H = 445 mm
P = 910 mm
Empty: 44 kg. Maximum weight with full tank and maximum load: 53 kg
3 - T
ECHNICAL DATA
3.2 TECHNICAL DATA AND NOISE
CHARACTERISTICS E9 INSPECTION 18 E9 INSPECTION 24
AUTOCLAVE
E9
Power supply voltage Mains frequency Power output Absorbed current Sterilization cycles Control cycles
- Indoor use
Range of environmental conditions in which the unit was designed to operate
Maximum pressure * Dimensions of sterilization
chamber Chamber capacity Usable space** of chamber Usable capacity of chamber Capacity of water tanks
Weight for support area (full tank and chamber with maximum weight)
Operation control Printer Bacteriological filter Yes Pollution level 2 Note: E9 MED has the built-in steam generator up to serial number EGO090101 18 litres e EGP090081 24
litres; the following E9 MED have no steam generator.
*Note: In this manual, the word “pressure” always refers to gauge pressure. **Usable space: This is the internal capacity of the sterilization chamber available for material to sterilize
(Fig. 3.2.1): Usable space 18 l (180x160x282 =8121600 mm3 = 8,12 l ) Usable space 24 l (180x160x382 =11001600 mm3 = 11 l )
Usable space 18 litres: 180x160x282=8121600 mm³ = 8.12 l
- Altitude up to 2000 m
- Temperature: +5 ÷ +40°C
- Max. relative humidity 85%
- Max. variation in mains voltage: ±10%
- Installation category (overvoltage category) II
Diameter: 250 mm
180 x 160 x 282 mm (LxHxD) 180 x 160 x 382 mm (LxHxD)
3.07 kg/cm2 (301210N/m2) 3.21 kg/cm2 (315384N/m2)
Vacuum test - Bowie & Dick test - Helix test
Depth: 370 mm
18 litres 24 litres
8.12 litres 11 litres
3 sterilization cycles
Usable space 24 litres: 180x160x382=11001600 mm³ = 11 l
230 V 50 Hz
2300 W
10 A
250 kPa (2.5 bar)
Diameter: 250 mm
Depth: 470 mm
4 litres
Microprocessor
Yes
Fig. 3.2-1
14
E9 service manual GB r7
3 - T
ECHNICAL DATA
AUTOCLAVE
E9
3.3 QUALITY OF WATER
With reference to standard EN 13060, the table below indicates the recommended limit values (maximum) for contaminating agents, as well as the chemical-physical characteristics of the water used for condensate* and inlet water.
* Condensate is produced by the steam that was formed by the empty chamber of the sterilizer.
Inlet water Condensate
Evaporated residue <10 mg/l <1 mg/l Silicon oxide 1 mg/l 0.1 mg/l Iron 0.2 mg/l 0.1 mg/l Cadmium 0.005 mg/l 0.005 mg/l Lead 0.05 mg/l 0.05 mg/l Heavy metal residues 0.1 mg/l 0.1 mg/l Chlorides 2 mg/l 0.1 mg/l Phosphates 0.5 mg/l 0.1 mg/l Conductivity at 20°C 15 µS/cm 3 µS/cm PH 5-7 5-7
Appearance
colourless, clean,
sediment-free
colourless, clean,
sediment-free
Hardness 0.02 mmol/l 0.02 mmol/l
The use of water for generating steam containing contaminants at higher levels than those shown in this table may considerably shorten the working life of a sterilizer and may invalidate the maker’s guarantee.
15
E9 service manual GB r7
3 - T
E9 18 (half band heater)
EDI000000
E9 24 (half band heater)
E9 18
E9 24
E9 18 200V 50 Hz
E9 24 200V 50 Hz
E9 18 200V 60 Hz
E9 24 200V 60 Hz
E9 18 230V 60 Hz
E9 24 230V 60 Hz
E9 18 SERVICE 230v 50 Hz
E9 24 SERVICE 230v 50Hz
E9 18 U
-
234 circuit
E9 24 U
-
234 circuit
E9 18 U
-
234 circuit Afnor
E9 24 U
-
234 circui
t Afnor
E9 18 U
-
234 circuit Recorder
E9 24 U
-
234 circuit Recorder
E9
MED
18
with steam generator
E9
MED
24
with steam generator
E9
MED
18
without steam generator since
E9
MED
24
without stea
m generator since
E9 MED 18 with steam generator
E9 MED 24 with steam generator
ECHNICAL DATA
3.4 SERIAL NUMBERS CODING
Autoclaves serial number is made of a combination of three letters and six numbers. The serial number identifies the autoclave model and the chamber capacity.
EDK000000 EEG000000 EEH000000 EFB000000 EFC000000 EEM000000 EEN000000 EEW000000 EEX000000 SER000000 SET000000 EGA080000 EGB080000 EEZ080000 EFA080000 EGM080000 EGN080000 EGO090000 EGP090000 EGO090101 EGP090081 EHC000000 EHD000000
AUTOCLAVE
E9
16
E9 service manual GB r7
4 - Installation
The packaging and the equipment are f
ragile, handle with care. Transport as fragile.
THE
1
4.1 POSITIONING THE UNIT
Lift the unit with care and do not turn it upside down.
HANDLES ON THE PACKAGING (1 of Fig. 4.1-1) MUST ONLY BE USED FOR VERTICAL LIFTING. Keep in a dry and protected place. The packaging must be kept for the whole guarantee period.
NOTE: keep the original packaging and use it to transport the unit. The use of different
packaging may damage the product during transport.
The unit must be removed from its packaging using the straps provided for the purpose: this operation must be carried out by two people at the same time (Fig. 4.1-2):
- Remove the upper protecting piece(s);
- Two people must then lift the unit out, keeping it in a horizontal position all the time;
- Place the unit on the work surface and then remove the straps by lifting it up slightly.
ATTENTION: follow the indications shown in figure 4.1-2.
Fig. 4.1-1 Fig. 4.1-2
- The unit should be installed inside a laboratory, which is accessible only to authorised personnel.
- Position the unit on a flat and horizontal surface (Fig. 4.1-3).
- Leave at least 8 cm of distance from the back of the machine (as required by the bulk pins provided) to allow a sufficient aeration (Fig. 4. 1-3)
- Do not place the unit near sources of steam or where it could be splashed by water, which could damage the internal electronic circuitry.
- Do not install the unit where there is poor air circulation (Fig. 4.1-4).
- Do not place the unit near sources of heat (Fig. 4.1-4).
- The area where the unit is placed must be lit in accordance with standard UNIT 10380.
- Acceptable environmental conditions: temperature from 5 to 40°C – max. humidity 85% without condensation – max. altitude 2000 m.
4 - I
ATTENTION: the unit MUST be installed by specialised technicians.
1
NSTALLATION
Fig. 4.1-3 Fig. 4.1-4
AUTOCLAVE
4.2
INSTALLING THE UNIT
Installation is a fundamental operation for the subsequent use and correct functioning of the unit.
E9
First, update the service booklet by writing the date of installation in the relative box and signing it.
The service booklet is inside the unit (1 in Fig. 4.2-1); remove the rear panel and fill in the installation box. Put back the service booklet and close the machine
Do not leave the unit without the rear panel.
.
Fig. 4.2-1
4.2.1 Installation and adjustement To install the unit, proceed as follows:
- Install the unit so that the power lead does not kink or become squashed but has a free run to the socket.
- The unit must be placed so that the plug is accessible.
- Place the unit at a height that will allow the user to inspect the entire sterilization chamber and clean it with ease.
18
E9 service manual GB r7
4 - I
1
NSTALLATION
AUTOCLAVE
E9
- Connect the overflow connector (1 of Fig. 4.2.1-1) to allow the unit to drain any excess water created mistakenly.
Fig. 4.2.1-1
- Do not place trays, newspapers, containers of liquids, etc. on the unit: the ventilation grilles must not be blocked.
- Do not lean on the door when it is open.
- When emptying the discharge tank directly into the waste pipes, position the unit at a height above the drain.
Making the electrical connections:
- Check that the power supply voltage indicated on the rear label (Fig. 4.2.1-2) corresponds to that available at the point of installation.
E9 INSPECTION 18
E9 INSPECTION 24
Fig. 4.2.1-2
- The unit must be connected with an overload cut-out switch to a system fitted with an adequate earth system that conforms to the standards applicable in the country of installation.
- The system must be connected according to current standards.
- Max. variation in mains voltage: +/- 10%.
- A differential switch featuring the following characteristics must be installed upstream of the power socket of the unit:
nominal current: 10 A differential sensitivity: 0.03 A.
- Connect the supplied cable to the rear of the unit.
- Position the unit so that the plug is accessible.
Do not allow the lead to bend tightly and do not place any object on it. Do not use extension leads.
19
E9 service manual GB r7
4 - I
1
3
2
Fill water tank
NSTALLATION
Only use the original lead. ONLY USE ORIGINAL SPARE PARTS.
After making the electrical connections, remove the clamp holding the electromagnet in place and install any accessory devices.
AUTOCLAVE
E9
Filling the tanks:
The unit features two separate tanks: one for the clean water required for the cycles, and one for the used water that is collected at the end of the cycles. Both tanks are connected with drain valves.
Filling with distilled water for the first time
1. Switch on the unit with the ON-OFF button (1 of Fig. 4.2.1-3). The following message will appear on the display:
with clean water
2a. Manual filling: lift the upper cover (2 of Fig. 4.2.1-3) and pour distilled water in through the inlet (3 in Fig.
4.2.1-3), observing the amounts indicated in chap. 3.2 “Technical data and noise”.
2b. Automatic filling: the water can be supplied totally automatically using a special dionizer (see Appendix 1
“Description of optional devices”). To install this optional, consult the respective “Aquafilter®” instruction manual supplied with the deonizer.
Fig. 4.2.1-3
WARNING: only use good quality clean water (Chap. 3.3 “Quality of process water”).
3. Once filling is complete, that can also be confirmed by the level indicator situated next to the inlet (3 of Fig. 4.2.1-3), the following screen appears on the display:
20
E9 service manual GB r7
4 - I
NSTALLATION
Installation registration
The functioning of Settings, Maintenance, Service and Diagnostic menus in E9 MED is the same as the E9 INSPECTION / RECORDER menus. The only difference is in the display’s graphics.
AUTOCLAVE
E9
Register the date of installation from the control panel. The first time the unit is switched on using the ON-OFF key (1 of Fig. 4.2.1-3), the LCD display turns on and the following welcome message appears:
After 5”, select the language desired.
Confirm the choice of the language with OK.
Note: The default language is English (this item cannot be de-selected).
21
E9 service manual GB r7
4 - I
Setting Date and
Time
Confirm date/time
Confirm Us
er Registration
NSTALLATION
AUTOCLAVE
E9
- If YES is pressed, the Date/time setting screen appears.
- If NO is pressed, you go to the Program Menu; the Installation Menu will appear again the next time the unit is switched on.
- If YES is pressed, the date is registered
as the date of installation, from which the timer for maintenance, etc. begins.
- If NO is pressed, you move on to the
Program Menu; the Installation Menu will appear the next time the unit is switched on.
Using the and keys, select the correct day, press OK to pass on to the choice of the month and so on until the minutes have been selected. When OK is pressed, the screen for confirming the date and time appears.
Press YES to access the User Registration screen on the Main Menu.
22
E9 service manual GB r7
4 - I
User Registration
E.g.
: Name Registration
E-memory
®
INSTALLATION CARD
UPDATE THE
NSTALLATION
With the and keys, select the respective item and complete registration using the small keyboard, as in the example indicated below.
If you have the optional “ register all the data directly to the software and then export it to the unit without having to use the buttons on the display. All previous data is overwritten.
AUTOCLAVE
After selecting the item Name from User registration, a screen appears in which the
three items present are selected one by one: the screens used for registering the user’s name and surname and the name of the company appear.
With the / and / keys, select the respective letters and numbers; confirm with OK. Proceed in the same way with the other items in the Name Registration screen. This registration determines the header that appears on the printer report: the name of the company appears if just the name of the company is registered or when all the fields available are filled out.
“ (see Appendix 1 “Descrition of optional devices”), you can
E9
After installation, always complete all parts of the
SERVICE BOOKLET BY WRITING THE DATE AND SIGNING ON THE INSTALLATION LINE.
After installation has been completed, the following welcome screen will appear the next time the unit is switched on:
5” later, the Programme Menu automatically appears from which the required programme or test can be selected.
and
4.3 OPERATOR REGISTRATION
Since software version 6.01 it is possibile to register up to 10 different sterilization cycle operator’s name. See underlying display’s screenshots for examples:
23
E9 service manual GB r7
4 - I
ATTENTION:
VACUUM TEST
can only be activated with the machine cold, i.e. WITHIN 3
NSTALLATION
AUTOCLAVE
E9
SELECT OPERATOR
XXXXX----------------------- -
YYYYY ZZZZZ VVVVV KKKKK
3.1.1
4.4 PERFORMING THE VACUUM TEST
OK
Note : this screen appears only if at least one operators name is set up . Please see User’s Manual for more informations.
the MINUTES FROM SWITCHING ON THE UNIT, in that once this time has elapsed, the unit starts pre-heating. If three or minutes elapse from when the unit was switched on before the test is selected or if the temperature of the band heater is greater than or equal to 50°C, switch off the unit and wait a few minutes for it to cool down.
The cycle that follows the operator selection, the last
selected voice remains highlighted.
From the Program Menu, use the key to select Test selection.
The Test Selection screen shows Vacuum Test by default; press OK.
24
E9 service manual GB r7
4 - I
Starting the Vacuum Test
NSTALLATION
Press START to begin the test; the following screen appears.
AUTOCLAVE
E9
If required, press INFO to open the test
control screen.
This screen appears when the test finishes. The door release symbol indicates that the door can be opened, and you return to the Programme Menu. If the test is completed but gives a negative outcome, the E34 alarm message appears (see Chap. 12.1 “Summary of alarm signals”).
ATTENTION: Keep the results printout and attach it to the installation card.
4.5 PERFORMING THE B134 CYCLE
Starting the B134 cycle.
Starting the B134 cycle
After selecting the cycle, a presentation screen appears. Press START to begin the cycle. If required, press INFO to open the cycle control screen.
25
E9 service manual GB r7
4 - I
Cycle End
Maintaining drying
Pressure levelling
NSTALLATION
AUTOCLAVE
E9
When the cycle has finished, the screen appears. At this point, the door release symbol indicates that the door can be opened; if the door is not opened within 10 minutes, the unit performs a maintain drying operation.
Once this has been performed, the Cycle End screen appears again.
4.6 LABELS PRINTING (ONLY E9 RECORDER)
This operation is performed automatically to prevent condensation from forming inside the chamber as a result of cooling. With OK, the maintain drying operation is
interrupted and the unit carries out the pressure levelling.
For optimum drying, open the door at the
end of the cycle and leave the sterilised objects on the trays for about 5 minutes before removing them. When the door is opened, the Programme Menu screen appears.
For printing labels, it is necessary to set the printer. In the initial screen select “Main menu”, then in the following screens select: “Service”, “Memory-print functions”, “Label printer” and finally “Active”.
26
E9 service manual GB r7
4 - I
NSTALLATION
Now must be setted the type of paper in use. In the initial screen select “Main menu”, then in the following screens select: “Service”, “Memory-print functions”, “Kind of print” and finally “Labels”.
AUTOCLAVE
E9
To label the sterilized material with its expiration date the expire period must be setted. In the initial screen select “Main menu”, then in the following screens select: “Service”, “Memory-print functions”, “Expire period” and finally enter the number of days.
To print labels of an ok cycle in the initial screen select “Main menu”, then in the following screens select: “Service”, “Memory-print functions”, “Ok cycles”, then select the desired cycle and finally the number of labels to be printed.
ATTENTION: To open the printer DO NOT pull the paper.
ATTENTION: Keep the results printout and attach it to the installation card.
27
E9 service manual GB r7
4 - I
ATTENTI
ON: DANGER OF BURNS.
NO!
NO!
ATTENTION
NSTALLATION
When the unit finishes the sterilisation cycle and the door is opened to remove the sterilised instruments, the inner parts of the boiler and door are still very hot. These must not be touched directly in order to avoid getting burnt. Use the relative extractor tool (see Chap. 2.2 “Safety devices”).
ATTENTION: DANGER OF BURNS. Do not lean over or stand in front of the door when opening it as there is a risk of scalding from escaping steam. Use the relative extractor tool (see Chap. 2.2 “Safety devices”).
AUTOCLAVE
E9
: a safety pin automatically locks the door when the cycle starts. The pin returns to its
home position only at the end of the cycle. Attempting to open the door with the door safety
device applied may seriously damage the closing system. Always wait for the end of cycle signal on the LCD before opening the door.
In the event of an alarm, the door can only be opened after the relative consent button is pressed.
4.7 DELIVERY OF TECHNICAL DOCUMENTATION
After installing the unit, hand over all the technical documentation contained inside the box to the customer:
Qty Technical documentation to deliver
1 1 1 2
If any optional accessories are installed (Appendix 1 “Description of optional accessories”), hand over the relative instructions manuals to the customer.
Certificate of guarantee Instructions manual Sheet for rapid use Declaration of conformity for Autoclave and Boiler
28
E9 service manual GB r7
5 - Description of cycle and main performance data
5.1 E9 INSPECTION COMPONENTS
The E9 Inspection sterilizer comprises the following elements:
COMPONENTS
MSW
EV1
EV2 OD5A/OD6B
EV3 OD4A/OD6B
EV4 OD3A/OD6B
EV5 OD2A/OD6B
EV6 OD1A/OD1B
EV7 (U-234) OD4A/OD6B
NAME OF SIGNAL DESCRIPTION Characteristics
OD6A/OD6B
Main switch 250V 12A Two-way solenoid valve for discharging steam at the
end of the cycle, power draw 9 W; normally open (NO) Three-way solenoid valve for air prevacuum and
water-air separation, power draw 12 W; normally closed (NC)
Two-way solenoid valve for bacteriological filter, power draw 9 W; normally open (NO)
Two-way solenoid valve for water exchange (steam gen. ~ drip collector), power draw 6 W; normally closed (NC)
Three-way solenoid valve for vacuum pump, power draw 12 W; normally closed (NC)
Solenoid valve for connection to water supply
Three-way solenoid valve vacuum pump suction, power draw 12W; normally closed (NC)
24 VDC
24 VDC
24 VDC
24 VDC
24 VDC
24 VDC
(outside unit)
EV8 (U-234) OD2A/OD6B
EM1 OD8A/OD8B WP1 OD9A/OD9B
WP2 OD10A/OD10B
WP2 OD12A/OD12B
VP1 OD11A/OD11B
RES1 OD14A/OD14B Heater for steam generator, power draw 1800 W 230 VAC
TS1
RES2 OD15A/OD15B
Three-way solenoid valve vacuum pump delivery, power draw 12W; normally closed (NC)
Door lock electromagnet, power draw 6 W Boiler water inlet pump, power draw 48 W
Separator discharge water pump (SICCE), energy absorbed 16 W (Up to EEG060999 for 18 l) (Up to EEH060999 for 24 l)
Separator discharge water pump (SICCE), energy absorbed 10 W (From EEG061000 for 18 l) (From EEH061000 for 24 l)
Vacuum pump, impedance 90 Ohms
Manually resettable safety thermostat for generator heater, calibrated to mid-range, approx. 180°C
Stainless steel band heater for chamber, power draw 840 W for the 24 l version and 600 W for the 18 l version
24 VDC
230 VAC
230 VAC
230 VAC
230 VAC
230 VAC
230 VAC
5 - D
ESCRIPTION OF CYCLE AND MAIN PERFORMANCE DATA
AUTOCLAVE
E9
TS2
FAN1 OD17A/OD17B
PTC1 IA1
PTC2 IA2
PTC3 IA3
COMPONENTS
PTC4 IA4 PTC5
PS1 IA5
LS1 ID4
NAME OF SIGNAL DESCRIPTION Characteristics
Manually resettable safety thermostat (band heater for chamber), calibrated to 200°C
Radiator fan, power draw 35 W PT1000 probe inside boiler (working space inside
chamber) PT1000 probe outside boiler (mounted on external
band heater) PT1000 probe for steam generator (located on the
steam generator coil heater)
NTC10000 temperature probe mounted on radiator Temperature probe mounted on CPU card Pressure sensor Float sensor for MIN distilled water level, contact
normally closed (NC)
230 VAC
230 VAC
LS2 ID5
LS3 ID6
SW1 ID7 SW2 ID8
SW3 ID9
SERIAL 1
Software port
SERIAL 2
Printer port
Float sensor for MAX distilled water level, contact normally closed (NC)
Float sensor for MAX used water level, contact normally closed (NC)
Door closed micro-switch, contact normally open (NO) Door lock micro-switch External Aquafilter signal (indicates the conductivity
limit of the water produced by the deionizer) Main serial port (cpu flash software update, probe and
sensor calibration, etc.) Secondary serial port (external printer, external
memory, etc.)
30
E9 service manual GB r7
Loading...
+ 138 hidden pages